Opened 14 years ago
Closed 9 years ago
#346 closed flight processing (fixed)
FW10/01, 187/2010, Dennys wood
Reported by: | ella | Owned by: | knpa |
---|---|---|---|
Priority: | alpha 4 low | Milestone: | 2010 data processing completion |
Component: | Archiving | Keywords: | |
Cc: | Other processors: | ella |
Description (last modified by emca)
Data location: ~arsf/arsf_data/2010/flight_data/uk/FW10_01-2010_187_Dennys_wood
Data arrived from ARSF via network transfer on:
Scientific objective: Do not have the ARSF Application pdf, but have requested this off Gary.
Priority: a4m
PI: Ross Hill
Sensors:
- Eagle (24/08/2010) redelivered (13/12/2010)
- Hawk (20/12/2010)
- Leica LIDAR (14/09/2010)
- Photography (18/08/2010)
Change History (53)
comment:1 Changed 14 years ago by jb362
comment:2 Changed 14 years ago by jb362
IPAS processing complete and copied to workspace
comment:3 Changed 14 years ago by mggr
- Description modified (diff)
- Priority changed from alpha 5 to alpha 4 low
Updated priority and PI per Gary's response. Still needs adding to processing priority list.
comment:4 Changed 14 years ago by benj
- Description modified (diff)
comment:5 Changed 14 years ago by ella
Starting hyperspectral processing.
comment:6 Changed 14 years ago by emca
- Description modified (diff)
comment:7 Changed 14 years ago by emca
- Other processors set to emca
- Owner set to emca
- Status changed from new to assigned
comment:8 Changed 14 years ago by emca
Photography data ready for delivery check at
~airborne/workspace/FW10_01-2010_187_Dennys_wood/delivery/20100809
Removed photographs 1-12 as they did not cover the project area.
comment:9 Changed 14 years ago by jb362
Starting camera delivery check
comment:10 Changed 14 years ago by jb362
Camera delivery looks fine
comment:11 Changed 14 years ago by ella
Hyperspectral data ready for delivery check at ~arsf/workspace/FW10_01-2010_187_Dennys_wood/delivery/20100810
comment:12 Changed 14 years ago by knpa
Begun hyperspectral delivery check.
comment:13 Changed 14 years ago by ella
Flight line | Eagle sct | Hawk sct |
01 | 0.20 | 0.60 |
02 | -0.05 | -0.08 |
03 | 0.01 | 0.03 |
04 | -0.02 | 0.03 |
05 | 0.03 | 0.02 |
06 | -0.05 | -0.02 |
07 | 0.04 | 0.03 |
08 | -0.02 | -0.05 |
09 | 0.02 | 0.04 |
10 | -0.02 | -0.01 |
11 | 0.00 | 0.05 |
12 | -0.02 | -0.02 |
13 | 0.03 | 0.07 |
14 | 0.00 | -0.01 |
15 | 0.04 | 0.02 |
16 | 0.00 | 0.00 |
17 | 1.00 | 1.00 |
18 | 1.00 | 1.40 |
19 | 0.05 | 0.01 |
20 | 0.05 | 0.01 |
comment:14 Changed 14 years ago by knpa
Checked. All looks good apart from the following:
- logsheet should be called FW10_01-2010_187_Dennys_wood.pdf
- No vectors. Check against vectors then:
- Add screenshots of eagle/hawk mosaics with vectors
- Update data quality section in config.
- Update config to point to vectors to get vector images in readme
- Need to fix extra space by editing tex file:
Quality and Issues with data
"...we processed Level 3 imagery with a Digital Elevation Model . Screenshots of the Level 3..."
- Line 1 - lots of dropped lines at start - need to mention in Readme
Not checked Hawk due to waiting on bandset issue
comment:15 Changed 14 years ago by ella
- Other processors changed from emca to ella
comment:16 Changed 14 years ago by ella
Everything mentioned in the above comment has now been sorted.
comment:17 Changed 14 years ago by mark1
- Description modified (diff)
Photography dispatched to PI on 18/08/2010
comment:18 Changed 14 years ago by ella
- Description modified (diff)
Eagle data dispatched to PI on 24th August 2010.
The hawk level 1 files are located in ~arsf/workspace/FW10_01-2010_187_Dennys_wood/delivery/hawk_20100823/lev1/
And the hawk jpg files and the mosaic with vector overlay are located in ~arsf/workspace/FW10_01-2010_187_Dennys_wood/delivery/hawk_20100823/screenshots/
comment:19 Changed 14 years ago by emca
LiDAR data ready for delivery check at
~airborne/workspace/FW10_01-2010_187_Dennys_wood/delivery/2010901
comment:20 Changed 14 years ago by jb362
Delivery checking LiDAR
comment:21 Changed 14 years ago by jb362
Delivery checked LiDAR. Every thing looks fine.
comment:22 Changed 14 years ago by emca
- Description modified (diff)
LiDAR data sent to Ross Hill 14/10/2010
comment:23 Changed 14 years ago by emca
- Description modified (diff)
Correction: LiDAR data sent to Ross Hill 14/09/2010
comment:24 Changed 14 years ago by knpa
- Description modified (diff)
This project is in the repository and can be r-synced.
comment:25 Changed 14 years ago by emca
Corrected LAS1.3 files sent to R Hill 21/10/2010
(incorrect header on original delivered files due to an error in processing software)
comment:26 Changed 14 years ago by mark1
Hawk and Eagle time offsets appear to be incorrect, including the Eagle data previously dispatched. When the Hawk data is reprocessed also reprocess the Eagle and re-deliver.
comment:27 Changed 14 years ago by mark1
Update to hawk sct offsets:
line 1: 0.58
line 17: 1.25
comment:28 Changed 14 years ago by mark1
Have split the hawk lines 17 and 18 using azspec so as not to need -bend to process in azgcorr.
comment:29 Changed 14 years ago by mark1
Update to eagle sct offsets:
line 1: 0.35
line 18: 1.1
Have split the eagle lines 17 and 18 using azspec so as not to need -bend to process them in azgcorr
comment:30 Changed 14 years ago by emca
Have delivery checked the Hawk data - no issues.
Ready to deliver.
comment:31 Changed 14 years ago by emca
Have also delivery checked the Eagle data, that is good too :)
comment:32 Changed 14 years ago by mark1
- Description modified (diff)
Hawk data has been dispatched to PI, as well as FW LiDAR extractions from the new extracting tool and Eagle re-delivery.
comment:33 Changed 14 years ago by emca
Hawk data has been checked and is ready for re-delivery
comment:34 Changed 14 years ago by emca
Hawk data re-delivered to PI 20/12/2010
comment:35 Changed 14 years ago by emca
- Description modified (diff)
comment:36 Changed 14 years ago by mark1
project rsynced 02/02/2011. proc_laser not rsynced since LAS files included in delivery.
comment:37 Changed 14 years ago by emca
- Component changed from Processing: general to Archiving
comment:38 Changed 13 years ago by knpa
- Owner changed from emca to knpa
- Status changed from assigned to accepted
Reprocessing hyperspectral with APL.
comment:39 Changed 13 years ago by knpa
Running stage 2.
comment:40 Changed 13 years ago by knpa
Re-running stage 2 (E+H) as apl chain has been updated to generate additional masked files.
comment:41 Changed 13 years ago by knpa
Re-running Hawk again as Mark made more changes in relation to bad pixel file.
Lines 17, 18a and 18b (both sensors) needed to go through again anyway due to mistakes with the config and issues with the split line.
comment:42 Changed 13 years ago by knpa
No longer need to split line 18 due to apl software handling the bends better.
New SCT values:
e17: 1.05
e18: 1.12 h18: 1.38
comment:43 Changed 13 years ago by knpa
More SCTs needed correct.
New values:
e08: -0.02
h17: 1.27
comment:44 Changed 12 years ago by knpa
- Milestone set to 2010 data processing completion
Beginning archiving.
comment:45 Changed 12 years ago by knpa
Made available to NEODC 09/07/11
comment:46 Changed 12 years ago by knpa
*2012 I mean obviously
comment:47 Changed 12 years ago by adbe
Hyperspectral reprocessing delivery check:
- gdal_translate command on page 4 looks incomplete
- Should the bandlist for the example commands be ALL
- Screenshots are at the end of the ReadME (remove [htb])
- Mention dropped scans in the ReadMe
comment:48 Changed 12 years ago by knpa
Fixed above issues apart from mentioning dropped scans (of which there are none regular)
Preparing to deliver to Ross Hill.
comment:49 Changed 12 years ago by knpa
Delivered re-processed hyperspectral to Ross Hill in Bournemouth (24/07/12)
comment:50 Changed 12 years ago by knpa
Old deliveries ingested by NEODC.
Moved to archive disk.
comment:51 Changed 12 years ago by knpa
Deleted workspace version (original processing)
Leaving the ticket open until reprocessing is archived.
K
comment:52 Changed 9 years ago by dac
- Status changed from accepted to new
Archiving
Data available from NEODC (http://browse.ceda.ac.uk/browse/neodc/arsf/2010/FW10_01/FW10_01-2010_187_Dennys_wood) - marking as closed.
comment:53 Changed 9 years ago by dac
- Resolution set to fixed
- Status changed from new to closed
Applanix processing complete and copied to workspace