Opened 14 years ago
Last modified 9 years ago
#350 closed flight processing
EUFAR10/02, 199b/2010, Santander — at Version 31
Reported by: | jb362 | Owned by: | anch |
---|---|---|---|
Priority: | alpha 4 high | Milestone: | 2010 data processing completion |
Component: | Archiving | Keywords: | |
Cc: | Other processors: |
Description (last modified by anch)
Data location: ~arsf/arsf_data/2010/flight_data/western_europe/EUFAR10_02-2010_199b-Santander
Data arrived from ARSF via network transfer on 26/07/2010.
Scientific objectives:
1 Development of a reliable tool to estimate coastal water quality indicators by using remote sensing techniques, both airborne and satellite.
1.1. Development of a set of semi-empirical algorithms based on hyperspectral airborne and in-situ data for estimating the concentrations of the water constituents;
1.2. Migration of the developed algorithms into the satellite workflow.
- Implementation of an automatic warning system based on satellite imagery processing;
- Inclusion of the information obtained by means of remote sensing in the dataset used for the calibration of regional hydrodynamic models.
Priority: a4m - awaiting confirmation
PI: Castillo-Lopez
Sensors: ¶
- Eagle (27/08/2010)
- Hawk (21/12/2010)
- Leica LIDAR (21/12/2010)
- RCD Digital photography (27/08/2010)
Change History (31)
comment:1 Changed 14 years ago by jb362
- Owner set to jb362
- Status changed from new to accepted
comment:2 Changed 14 years ago by jb362
- Owner changed from jb362 to iopa
- Status changed from accepted to assigned
comment:3 Changed 14 years ago by iopa
- Owner changed from iopa to jb362
comment:4 Changed 14 years ago by jb362
- Priority changed from alpha 4 medium to alpha 4 high
comment:5 Changed 14 years ago by anch
- Owner changed from jb362 to anch
- Status changed from assigned to accepted
comment:6 Changed 14 years ago by anch
Applanix and IPAS for this project completed.
comment:7 Changed 14 years ago by anch
Because this project is not in the UK, and making a DEM using STRM data is a pain, I have started LiDAR processing which I will eventually use to produce a DEM to process the hyperspectral with.
comment:8 Changed 14 years ago by jb362
- Description modified (diff)
comment:9 Changed 14 years ago by anch
- Description modified (diff)
LiDAR has lots of noise (mainly over ocean) and may take a while to classify, so I have put the hyperspectral back on the processing list in case anyone is looking for a hyperspectral project to get on with.
comment:10 Changed 14 years ago by jb362
Starting hyperspectral processing.
comment:12 Changed 14 years ago by jb362
- Summary changed from EUFAR10/01, 199b/2010, Santander to EUFAR10/02, 199b/2010, Santander
comment:13 Changed 14 years ago by iopa
Checking hyperspectral.
comment:14 Changed 14 years ago by iopa
Hyperspectal delivery check report:
1) rename lev1's and screenshots to contain the lettered julian day 199b.
Otherwise all's well.
comment:15 Changed 14 years ago by jb362
Delivery check fixes complete.
comment:16 Changed 14 years ago by jb362
Checking camera
comment:17 Changed 14 years ago by jb362
All good, but again PI needs to be Dr. Castillo-Lopez
comment:18 Changed 14 years ago by iopa
Camera is ready to deliver.
comment:19 Changed 14 years ago by jb362
Camera and Eagle data delivered.
comment:20 Changed 14 years ago by jb362
- Description modified (diff)
comment:21 Changed 14 years ago by knpa
- Description modified (diff)
Data moved from overflow to repository.
Can now be r-synced.
comment:22 Changed 14 years ago by benj
Have downloaded 1s RINEX data from University of Cantabria and copied to repository. Relevant section of email from PI was as follows:
SANTANDER and TORRELAVEGA stations are in relation with the calibration site "Santander1" and the LAREDO station for the area of validation (Santander 2). Santander 1 data taken on 18th July and Santander2 data taken on 19th July. In the corresponding tabs appear links to download RINEX data. LINKS of interest: http://www.gnss.unican.es/estaciones/cant.asp http://www.gnss.unican.es/estaciones/trvg.asp http://www.gnss.unican.es/estaciones/lare.asp ftp://ftpgnss.digteg.unican.es/rinex Access to real time corrections using the standard protocol NTRIP (Networked Transport of RTCM vía Internet Protocol): URL http://ntrip.unican.es:2101/ IP: 193.144.202.127 Port: 21 User: anonimous link: http://www.gnss.unican.es/servicios/services.asp
comment:23 Changed 14 years ago by benj
Note I believe the Santander station mentioned with code CANT is the data I have downloaded from REIN. This is because if you go to the first link given the title of the web page is "Estación de Reinosa"
comment:24 Changed 14 years ago by knpa
Appears to be an issue with the bandset labels in the header files; they start at 900nm which is lower than it should be. Possibly incorrect bandset selected or none specified. Will leave this until end of the year and new Hawk calibration.
comment:25 Changed 14 years ago by benj
- Description modified (diff)
comment:26 Changed 14 years ago by iopa
LiDAR data has been checked;
readme contains the DEM section title twice
in the data quality section it is written elipsoid with one l
dem/README...txt needs correcting for SRTM references
the data seems correct, ready to deliver.
comment:27 Changed 14 years ago by emca
Eagle and Hawk SCT's
Line Eagle Hawk 1 -0.05 0.02 2 0.08 -0.06 3 0.03 0.01 4 0.05 -0.03 5 -0.05 -0.01 6 0.01 0.01 7 0.02 -0.03 8 -0.01 -0.01 9 -0.03 0.02 10 -0.07 0.02 11 0.01 -0.01 12 0.03 0.04 13 0.35 0.52 14 0.08 0.05 15 0.04 0.04 16 0.08 -0.05 17 -0.06 0.00 18 -0.01 0.00 19 0.00 -0.01
I used a LiDAR intensity image and the Eagle data to find the SCT's for the Hawk as the lines were not overlapping and most of them did not contain sufficient wobbles to correct the timing. Hawk line 13 had no sync. Lines 11 & 19 had bends so were processed using -l 0 7500 and -l 750 17968 respectively, cutting off ~ 200 lines of data.
Hawk delivery has been created.
comment:28 Changed 14 years ago by anch
Hawk Delivery checked.
Looks fine to deliver.
comment:29 Changed 14 years ago by emca
Hawk lev1 files reprocessed and saved in delivery folder
comment:30 Changed 14 years ago by anch
Hawk lev1 re-checked: Ready for delivery
comment:31 Changed 14 years ago by anch
- Description modified (diff)
Hawk and Lidar delivered 21/12/2010
I'll start processing the Applanix for this now.