Opened 14 years ago
Closed 9 years ago
#351 closed flight processing (fixed)
EUFAR10/02 (AIRES-CZM), 200/2010, Santander
Reported by: | jb362 | Owned by: | knpa |
---|---|---|---|
Priority: | alpha 4 high | Milestone: | 2010 data processing completion |
Component: | Archiving | Keywords: | |
Cc: | Other processors: | emca |
Description (last modified by emca)
Data location: ~arsf/arsf_data/2010/flight_data/western_europe/EUFAR10_02-2010_200_Santander
Data arrived from ARSF via network transfer on 26/07/2010.
Scientific objectives:
1 Development of a reliable tool to estimate coastal water quality indicators by using remote sensing techniques, both airborne and satellite.
1.1. Development of a set of semi-empirical algorithms based on hyperspectral airborne and in-situ data for estimating the concentrations of the water constituents;
1.2. Migration of the developed algorithms into the satellite workflow.
- Implementation of an automatic warning system based on satellite imagery processing;
- Inclusion of the information obtained by means of remote sensing in the dataset used for the calibration of regional hydrodynamic models.
Priority: a4m - awaiting confirmation
PI: Castillo-Lopez
Sensors: ¶
- Eagle (21/12/2010)
- Hawk (02/02/2011)
- Leica LIDAR (21/12/2010)
- RCD Digital Photography (21/12/2010)
Change History (46)
comment:1 Changed 14 years ago by jb362
comment:2 Changed 14 years ago by jb362
- Priority changed from immediate to alpha 4 high
comment:3 Changed 14 years ago by ella
- Description modified (diff)
- Owner set to ella
- Status changed from new to accepted
comment:4 Changed 14 years ago by ella
Beginning navigation processing
comment:5 Changed 14 years ago by anch
Starting Applanix (and probably IPAS) processing for this project.
comment:6 Changed 14 years ago by anch
- Owner changed from ella to anch
comment:9 Changed 14 years ago by emca
- Other processors emca deleted
There is a problem with the IPAS for this project. Moving on to a different project until this can be resolved.
comment:10 Changed 14 years ago by jb362
There is also a problem with the applanix for this project which I do not know how to resolve. Because there is no IPAS .sol file or applanix .sbet file, none of the camera, Lidar, or hyperspectral data can be processed at present.
comment:11 Changed 14 years ago by knpa
- Description modified (diff)
Data moved from overflow to repository.
Can now be r-synced.
comment:12 Changed 14 years ago by benj
Have downloaded 1s RINEX data from University of Cantabria and copied to repository. Relevant section of email from PI was as follows:
SANTANDER and TORRELAVEGA stations are in relation with the calibration site "Santander1" and the LAREDO station for the area of validation (Santander 2). Santander 1 data taken on 18th July and Santander2 data taken on 19th July. In the corresponding tabs appear links to download RINEX data. LINKS of interest: http://www.gnss.unican.es/estaciones/cant.asp http://www.gnss.unican.es/estaciones/trvg.asp http://www.gnss.unican.es/estaciones/lare.asp ftp://ftpgnss.digteg.unican.es/rinex Access to real time corrections using the standard protocol NTRIP (Networked Transport of RTCM vía Internet Protocol): URL http://ntrip.unican.es:2101/ IP: 193.144.202.127 Port: 21 User: anonimous link: http://www.gnss.unican.es/servicios/services.asp
comment:13 Changed 14 years ago by benj
Note I believe the Santander station mentioned with code CANT is the data I have downloaded from REIN. This is because if you go to the first link given the title of the web page is "Estación de Reinosa"
comment:14 Changed 14 years ago by knpa
Appears to be an issue with the bandset labels in the header files; they start at 900nm which is lower than it should be. Possibly incorrect bandset selected or none specified. Will leave this until end of the year and new Hawk calibration.
comment:15 Changed 14 years ago by iopa
Applanix and IPAS have been completed.
comment:16 Changed 14 years ago by iopa
Camera is ready to be checked.
Test images were images 1-8.
On a different note; eagle/hawk files were named 200a for no apparent reason, the logsheet too does not have a flight letter, so they were renamed with the 'a' removed.
comment:18 Changed 14 years ago by benj
- Description modified (diff)
comment:19 Changed 14 years ago by emca
Eagle data is ready for delivery check at
~airborne/workspace/EUFAR10_02-2010_200_Santander/delivery/20101125/
comment:20 Changed 14 years ago by emca
Delivery checked the camera data at
~airborne/workspace/EUFAR10_02-2010_200_Santander/delivery/20101109
Data is good, ready to deliver.
comment:21 Changed 14 years ago by emca
LiDAR data is ready for delivery check at
~airborne/workspace/EUFAR10_02-2010_200_Santander/delivery/20101126
comment:22 Changed 14 years ago by emca
SCT (and GPT) offsets for Eagle data:
Line Number | SCT (GPT) |
01 | +0.03 |
02 | 0.00 |
03 | -0.10 (-0.10) |
04 | 0.00 |
05 | 0.00 |
06 | -0.02 |
07 | -0.12 (-0.08) |
08 | +0.03 |
09 | +0.02 |
10 | -0.08 (-0.12) |
11 | -0.01 |
12 | +0.37 |
Notes on Eagle processing:
Line 05 had an incorrect GPS stop time in the raw header file so this was changed (original file kept as .hdr-original)
Line 08 had a bend in it so processed using -l 0 10100 in azspec (excluding the last ~400)
Line 12 had no sync information
comment:23 Changed 14 years ago by knpa
Delivery Checking LiDAR
comment:24 Changed 14 years ago by knpa
Delivery check complete.
All looks good and ready to deliver apart from:
- EUFAR10_02-2010_200.dem should be EUFAR10_02-2010-200.dem
- Low min Z values (~250m), is this due to water?
- Readme says DEM resolution is 2m, actually 5m.
comment:25 Changed 14 years ago by benj
- Summary changed from EUFAR10/01, 200/2010, Santander to EUFAR10/02, 200/2010, Santander
Fixed project ID in ticket (was down as EUFAR10/01)
comment:26 Changed 14 years ago by anch
- Description modified (diff)
Eagle, Camera, and LiDAR all delivered 21/12/2010
comment:27 Changed 14 years ago by emca
Hawk data is ready for delivery check at
~airborne/workspace/EUFAR10_02-2010_200_Santander/delivery/20110107/
Hawk SCT offsets:
line number | SCT |
01 | -0.01 |
02 | -0.01 |
03 | 0.00 |
04 | 0.00 |
05 | +0.02 |
06 | 0.00 |
07 | 0.00 |
08 | -0.01 |
09 | 0.01 |
10 | 0.00 |
11 | -0.02 |
12 | 0.54 |
Notes: Line 08 contained a bend and was processed with -l 0 10120 in azspec. No sync for line 12. SCT's were difficult to correct as lines are mainly over water and very little overlap (just a partial overlap with a cross line). Used LIDAR and Eagle data to help find SCTs.
comment:28 Changed 14 years ago by anch
Delivery checking Hawk.
comment:29 Changed 14 years ago by anch
Delivery check complete.
All fine.
Perhaps rename DEM to match the AZ command in the readme.
Also there are some overflows over the beach/white topped houses on some lev1 files - perhaps mention this in data quality section.
comment:30 Changed 14 years ago by emca
- Description modified (diff)
Updated readme as per above.
Hawk data sent to PI 02/02/2011
comment:31 Changed 14 years ago by anch
- Summary changed from EUFAR10/02, 200/2010, Santander to EUFAR10/02 (AIRES-CZM), 200/2010, Santander
comment:32 Changed 14 years ago by knpa
- Component changed from Processing: general to Archiving
- Owner changed from anch to knpa
- Status changed from accepted to assigned
Project has been r-synced. Beginning archiving.
comment:33 Changed 14 years ago by knpa
tabi data present.
comment:34 Changed 14 years ago by knpa
applanix/gps contents missing.
Pospac project file missing.
comment:35 Changed 14 years ago by knpa
Tarball created. Made available to NEODC.
comment:36 Changed 14 years ago by knpa
- Milestone set to 2010 data processing completion
Backed up by NEODC. Moved to archive disk.
comment:37 Changed 13 years ago by knpa
- Resolution set to fixed
- Status changed from assigned to closed
Deleted workspace version.
Closing ticket.
comment:38 Changed 13 years ago by emca
- Resolution fixed deleted
- Status changed from closed to reopened
comment:39 Changed 13 years ago by emca
Reprocessed data using apl software
New (apl) sct values for the following Eagle lines:
line 3: -0.06
line 7: -0.10
line 10: -0.01
comment:40 Changed 12 years ago by emca
Hyperspectral data ready for delivery check
comment:41 Changed 12 years ago by adbe
Hyperspectral reprocessing delivery check:
- Screenshots are at the end of the ReadMe (remove [htb])
- DEM name is different from example command
- Pixel Size should really be around 5
- Should mention dropped scans in the ReadMe
- e200043b_mapped_utm30n.bil & e200093b_mapped_utm30n.bil & e200123b_mapped_utm30n.bil & h200013b_mapped_utm30n.bil & h200053b_mapped_utm30n.bil & h200073b_mapped_utm30n.bil & h200093b_mapped_utm30n.bil & h200113b_mapped_utm30n.bil: filesize does not match with hdr.
comment:42 Changed 12 years ago by emca
Made updates to readme.
DEM name matches example command (doesn't match config, as it was manually changed afterwards).
Reprocessed Eagle 4, 9, 12 and Hawk 5 7 9 - problem relates to an apl bug that was fixed ~end may but these line were processed before update.
Adbe - can you check these reprocessed lines again?
comment:43 Changed 12 years ago by adbe
Mapped files load ok.
One named incorrectly: h200073b_mapped_utm30n.bil.bil
Remove the "wrong" directory.
comment:44 Changed 12 years ago by emca
Renamed files and deleted 'wrong' directory. Zipping remaining mapped files.
Reprocessing now complete, data not requested by PI. Ready for archiving.
comment:45 Changed 12 years ago by adbe
Delivered reprocessed Hyperspectral to Elena Castillo-Lopez on 16/08/2012 on disk 126.
comment:46 Changed 9 years ago by dac
- Resolution set to fixed
- Status changed from reopened to closed
Archiving
Data available from NEODC (http://browse.ceda.ac.uk/browse/neodc/arsf/2010/EUFAR10_02/EUFAR10_02-2010_200_Santander).
Marking as closed.
Awaiting logsheet