Opened 14 years ago
Last modified 8 years ago
#353 assigned flight processing
EU09/02, flight day 212b/2010, Alps — at Version 12
Reported by: | ella | Owned by: | emca |
---|---|---|---|
Priority: | alpha 4 medium | Milestone: | 2010 data processing completion |
Component: | Archiving | Keywords: | |
Cc: | Other processors: |
Description (last modified by iopa)
Data location: ~/arsf_data/2010/flight_data/archive-overflow/EU09_02-2010_212b_Alps
Project has been fast copied to ~arsf/workspace/EU09_02-2010_212b_Alps
Data arrived from ARSF via network transfer on 9th August 2010.
Scientific objectives: This project will utilise an integrated remote sensing dataset to:
- resolve the spatial extent of glacial debris and determine debris thickness;
- contribute to improvements in glacier mass balance modelling;
- investigate up-scaling of field to satellite measurements, to determine the accuracy of our remote technique.
Priority: a4
PI: Dr David Rippin
Sensors:
- Eagle
- Hawk
- Leica LIDAR
- Leica RCD (16/09/10)
Change History (12)
comment:1 Changed 14 years ago by ella
- Description modified (diff)
comment:2 Changed 14 years ago by ella
comment:3 Changed 14 years ago by jb362
The steep terrain for this project area means that an SRTM dem will be useless here and therefore hyperspectral processing should be held until a LiDAR dem has been produced.
comment:4 Changed 14 years ago by ella
Starting camera processing.
comment:5 Changed 14 years ago by jb362
Image event file has been edited for images which failed to
record a time (using time differences from sensorstat log). Images
affected are 1-5
comment:6 Changed 14 years ago by ella
Beginning camera delivery check.
comment:7 Changed 14 years ago by jb362
I actually did the camera processing for this project. Ella put a note on the ticket that she was starting the processing because I forgot to!
comment:8 Changed 14 years ago by ella
Camera check complete. Everything looks good, just need to move the camera_delivery.log file out of the delivery directory.
comment:9 Changed 14 years ago by jb362
Camera ready for delivery.
comment:10 Changed 14 years ago by jb362
Iopa will be delivering this for me since I'm leaving.
comment:11 Changed 14 years ago by emca
- Owner set to emca
- Status changed from new to accepted
Processing the LiDAR for this project along with Alps 212a
comment:12 Changed 14 years ago by iopa
- Description modified (diff)
RCD camera was dispatched today, 16th September 2010.
This flight was flown on the same day as GB070/09-212a and the two study areas are less than 11 minutes fling time apart, so the Applanix and Ipas navigation were processed once and sbet/sol files copied into each project directory.