Opened 14 years ago

Last modified 8 years ago

#353 assigned flight processing

EU09/02, flight day 212b/2010, Alps — at Version 12

Reported by: ella Owned by: emca
Priority: alpha 4 medium Milestone: 2010 data processing completion
Component: Archiving Keywords:
Cc: Other processors:

Description (last modified by iopa)

Data location: ~/arsf_data/2010/flight_data/archive-overflow/EU09_02-2010_212b_Alps
Project has been fast copied to ~arsf/workspace/EU09_02-2010_212b_Alps

Data arrived from ARSF via network transfer on 9th August 2010.

Scientific objectives: This project will utilise an integrated remote sensing dataset to:

  • resolve the spatial extent of glacial debris and determine debris thickness;
  • contribute to improvements in glacier mass balance modelling;
  • investigate up-scaling of field to satellite measurements, to determine the accuracy of our remote technique.

Priority: a4

PI: Dr David Rippin

Sensors:

  • Eagle
  • Hawk
  • Leica LIDAR
  • Leica RCD (16/09/10)

Change History (12)

comment:1 Changed 14 years ago by ella

  • Description modified (diff)

comment:2 Changed 14 years ago by ella

This flight was flown on the same day as GB070/09-212a and the two study areas are less than 11 minutes fling time apart, so the Applanix and Ipas navigation were processed once and sbet/sol files copied into each project directory.

comment:3 Changed 14 years ago by jb362

The steep terrain for this project area means that an SRTM dem will be useless here and therefore hyperspectral processing should be held until a LiDAR dem has been produced.

comment:4 Changed 14 years ago by ella

Starting camera processing.

comment:5 Changed 14 years ago by jb362

Image event file has been edited for images which failed to
record a time (using time differences from sensorstat log). Images
affected are 1-5

comment:6 Changed 14 years ago by ella

Beginning camera delivery check.

comment:7 Changed 14 years ago by jb362

I actually did the camera processing for this project. Ella put a note on the ticket that she was starting the processing because I forgot to!

comment:8 Changed 14 years ago by ella

Camera check complete. Everything looks good, just need to move the camera_delivery.log file out of the delivery directory.

comment:9 Changed 14 years ago by jb362

Camera ready for delivery.

comment:10 Changed 14 years ago by jb362

Iopa will be delivering this for me since I'm leaving.

comment:11 Changed 14 years ago by emca

  • Owner set to emca
  • Status changed from new to accepted

Processing the LiDAR for this project along with Alps 212a

comment:12 Changed 14 years ago by iopa

  • Description modified (diff)

RCD camera was dispatched today, 16th September 2010.

Note: See TracTickets for help on using tickets.