Opened 14 years ago

Last modified 8 years ago

#358 closed flight processing

EU10/03 & EUFAR10/01, flight day 229b/2010, Kis Balaton — at Version 14

Reported by: iopa Owned by: anch
Priority: alpha 5 Milestone: 2010 data processing completion
Component: Archiving Keywords:
Cc: Other processors:

Description (last modified by emca)

Data location: ~arsf/workspace/EU10_03-2010_229b_Kis_Balaton

Data arrived from ARSF via SATA disk Q on 15/09/2010.

Scientific objective: Lake Balaton provides an ideal area for testing emerging algorithms on retrieval of in-water constituents and on mapping bloom-forming cyanobacteria using in-situ radiometric, airborne and satellite data.

Priority: a5 - the data set as a whole is listed as a5 due to it being part of EU10/03, however the PI of EU10/03 has lowered the LiDAR priority to a4m, and therefore LiDAR stands with a priority of a4h due to being part of EUFAR10/01.

PI: A. Tyler (EU10/03) & A. Zlinszky (EUFAR10/01)

When data is processed it should be dispatched to both PIs individually for their respective projects.

Sensors:

  • Eagle (20/10/2010)
  • Hawk
  • Leica LIDAR
  • Digital Photography (20/10/2010)

Change History (14)

comment:1 Changed 14 years ago by iopa

  • Description modified (diff)

comment:2 Changed 14 years ago by anch

  • Description modified (diff)

Note: Data is currently symlinked from ~arsf/arsf_data/2010/flight_data/archive_overflow and when this is resolved the symlinks will need to be re-directed.

comment:3 Changed 14 years ago by anch

Applanix and IPAS processing for this project are complete

comment:4 Changed 14 years ago by anch

  • Owner set to anch
  • Status changed from new to accepted

Processing hyperspectral for this project now.

comment:5 Changed 13 years ago by iopa

  • Description modified (diff)

comment:6 Changed 13 years ago by anch

Camera processing for this project is ready for delivery check.

comment:7 Changed 13 years ago by anch

Eagle is ready for delivery check

comment:8 Changed 13 years ago by emca

Delivery checked Photography data
~airborne/workspace/EU10_03-2010_229b_Kis_Balaton/delivery/20101007/EU10_03
No problems - ready to deliver

Delivery checked Hyperspectral data
~airborne/workspace/EU10_03-2010_229b_Kis_Balaton/delivery/20101006/EU10_03

All processed files need to have flight letter added (229b - lev1 files & jpgs)
Missing first flight line - either process & include this line or explain its absence in the readme. If it is not going to be delivered note this in the ticket.
Add DEM to delivery
Change permissions of *.bil files so they are readable to all (as this will cause problems when copying to disk)
Misc directory is empty - add appropriate separation file here

Readme:
Add flight letter (229b) to each filename
Add DEM to delivery contents
DEM Section - "this text is subject to change" - please remove & update ASTER DEM information
Azgcorr example command - change DEM name to match delivered ASTER DEM

comment:9 Changed 13 years ago by emca

Also need to add Eagle SCT offsets to the ticket

comment:10 Changed 13 years ago by emca

Eagle and Camera data send to A Tyler 20/10/2010.

Will also need to be sent to A. Zlinszky

comment:11 Changed 13 years ago by anch

SCT Offsets for Eagle lines are:

EAGLE
-1 : 0.03
-2 : 0.05
-3 : 0.00
-4 : 0.00
-5 : 0.02
-6 : 0.02
-7 : 0.01
-8 : 0.02
-9 : 0.03
-10 : 0.03
-11 : 0.00
-12 : 0.00
-13 : 0.02
-14 : 0.05
-15 : 0.03
-16 : 0.93
-17 : 0.03

Flightline -1 was aborted due to cloud as mentioned in the log sheet, however I still found an SCT for it (Having not realised it was aborted) and I've listed that here.

comment:12 Changed 13 years ago by anch

Decided to deliver flightline 1 afterall as there was a fair amount of data and it may be useful

comment:13 Changed 13 years ago by knpa

First 12 bands of Hawk lev1s are blank. The raws are fine. Appears to be an issue with the bandset labels in the header files, they start at 900nm which is lower than it should be. Possibly incorrect bandset selected or none specified. Will leave this until end of the year and new Hawk calibration.

comment:14 Changed 13 years ago by emca

  • Description modified (diff)
Note: See TracTickets for help on using tickets.