Opened 14 years ago

Closed 12 years ago

Last modified 9 years ago

#359 closed flight processing (fixed)

EU10/03 & EUFAR10/01 (AIMWETLAB), flight day 232b/2010, Aimwetlab (Kis Balaton)

Reported by: iopa Owned by: knpa
Priority: alpha 4 high Milestone: 2010 data processing completion
Component: Archiving Keywords:
Cc: Other processors:

Description (last modified by dac)

Data location: ~arsf/arsf_data/2010/flight_data/hungary/EU10_03-2010_232b_Aimwetlab_Kis_Balaton

Data arrived from ARSF via SATA disk Q on 15/09/2010.

Scientific objective: Lake Balaton provides an ideal area for testing emerging algorithms on retrieval of in-water constituents and on mapping bloom-forming cyanobacteria using in-situ radiometric, airborne and satellite data.

Priority: a5 - the data set as a whole is listed as a5 due to it being part of EU10/03, however the PI of EU10/03 has lowered the LiDAR priority to a4m, and therefore LiDAR stands with a priority of a4h due to being part of EUFAR10/01.

PI: A. Tyler (EU10/03) & A. Zlinszky (EUFAR10/01)

When data is processed it should be dispatched to both PIs individually for their respective projects.

Sensors:

  • Eagle (27/10/2010 & 28/10/2010)
  • Hawk (28/01/2011)
  • Leica LIDAR (28/02/2011)
  • Digital Photography (27/10/2010 & 28/10/2010)

Change History (42)

comment:1 Changed 14 years ago by iopa

  • Description modified (diff)

comment:2 Changed 14 years ago by iopa

  • Description modified (diff)

comment:3 Changed 14 years ago by emca

  • Owner set to emca
  • Status changed from new to assigned

Starting Eagle and Camera processing

comment:4 Changed 14 years ago by emca

IPAS and Applanix processing is complete

comment:5 Changed 14 years ago by emca

  • Description modified (diff)

Changed the file structure from EUFAR10-01 to EU10_03 to match the other two projects that have the same dual PIs (#358 & #373)

comment:6 Changed 14 years ago by emca

Hyperspectral is ready for delivery check
~airborne/workspace/EU10_03-2010_232b_Aimwetlab_Kis_Balaton/delivery/20101018/EU10_03

comment:7 Changed 14 years ago by emca

Camera is ready for delivery check
~airborne/workspace/EU10_03-2010_232b_Aimwetlab_Kis_Balaton/delivery/20101019/EU10_03

comment:8 Changed 14 years ago by iopa

Delivery checked eagle; all's good and ready to deliver.

Delivery checked camera; all's good except the eagle/hawk lines 1,2 and 3 are drawn out of place on googleearth,
lines 1 should start at ~ ( 46°38'3.39"N, 17° 3'33.42"E)
lines 2 should end at ~ ( 46°38'31.15"N, 17° 3'55.78"E)
lines 3 should end at ~ ( 46°31'33.07"N, 17° 6'27.03"E)

sorry for the degrees! it's googleearth.

otherwise ready to deliver.

comment:9 Changed 14 years ago by iopa

Also for the camera readme, since this flight has a flight letter, the filename convention for the kml etc. needs an 'f', and then an extra line written in the description underneath.

comment:10 Changed 14 years ago by knpa

Appears to be an issue with the bandset labels in the header files, they start at 900nm which is lower than it should be. Possibly incorrect bandset selected or none specified. Will leave this until end of the year and new Hawk calibration.

comment:11 Changed 14 years ago by emca

  • Description modified (diff)

Eagle and Camera sent to PI 27/10/2010

comment:12 Changed 14 years ago by emca

Note above delivery relate to A Tyler. Data also needs to be sent to A Zlinszky.

comment:13 Changed 14 years ago by iopa

  • Description modified (diff)

Dispatched Eagle and Camera to Dr. Zlinszky on 28/10/2010.

comment:14 Changed 14 years ago by anch

Starting hawk processing...

comment:15 Changed 14 years ago by anch

SCTs found.

-1: 0.00
-2: 0.00
-3: 0.00
-4: 0.00
-5: 0.00
-6: 0.00

comment:16 Changed 14 years ago by anch

Hawk submitted for delivery check

comment:17 Changed 14 years ago by emca

Starting LiDAR processing

comment:18 Changed 14 years ago by iopa

Finished checking Hawk delivery;

no errors were found, ready to deliver... twice!

comment:19 Changed 14 years ago by anch

  • Description modified (diff)

Hawk delivered 28/01/2011

comment:20 Changed 14 years ago by emca

LiDAR ready for delivery check at
~airborne/workspace/EU10_03-2010_232b_Aimwetlab_Kis_Balaton/delivery/20110211/EU10_03

comment:21 Changed 14 years ago by knpa

Taking LIDAR delivery check.

comment:22 Changed 14 years ago by knpa

Delivery check complete.

All looks good apart from:

All ascii files are one column too long! (9 instead of 8) txyzicra?

Also, remember that this project needs to be delievered to Dr. Zlinszky also, under separate project code.

comment:23 Changed 14 years ago by emca

  • Description modified (diff)

ASCII file format has been changed and now contain 9 columns so no changes made to LiDAR delivery.

LiDAR data sent to A. Tyler 28/02/2011

Hawk and LiDAR need to be sent to A Zlinszky

comment:24 Changed 14 years ago by anch

Hawk and LiDAR sent to A. Zlinkszky

comment:25 Changed 14 years ago by anch

  • Summary changed from EU10/03 & EUFAR10/01, flight day 232b/2010, Aimwetlab (Kis Balaton) to EU10/03 & EUFAR10/01 (AIMWETLAB), flight day 232b/2010, Aimwetlab (Kis Balaton)

comment:26 Changed 13 years ago by knpa

  • Component changed from Processing: general to Archiving
  • Owner changed from emca to knpa

Projects has been r-synced. Beginning archiving.

comment:27 Changed 13 years ago by knpa

AIMMS/GRIM data present.

Tabi data present.

comment:28 Changed 13 years ago by knpa

applanix/gps files missing.

comment:29 Changed 13 years ago by knpa

Project has been tarballed and made available to NEODC (12/05/11)

comment:30 Changed 13 years ago by knpa

Backed-up by NEODC.

Moved to archive disk.

comment:31 Changed 12 years ago by emca

Reprocessed hyperspectral data using apl

comment:32 Changed 12 years ago by knpa

Removed non-reprocessing workspace version. Leaving ticket open for reprocessing.

comment:33 Changed 12 years ago by emca

Hyperspectral data ready for delivery check

comment:34 Changed 12 years ago by knpa

  • Milestone set to 2010 data processing completion

Delivery checking hyperspectral.

comment:35 Changed 12 years ago by knpa

Delivery check complete.

All looks fine apart from:

  • ReadMe first page gives jday as 232, think this should be 232b to uniquely identify it.
  • DEM in ReadMe and config has incorrect name (actual file name is correct). Let me know when this is fixed so I can run apl_cmd_check.
  • There appears to be a residual sct offset in e5
  • Need to mention regular dropped frames in Eagle in ReadMe
  • logsheet name incorrect

comment:36 Changed 12 years ago by emca

Made above changes - reprocessing eagle 5 for all sct values to check value used.

comment:37 Changed 12 years ago by emca

Eagle line 5 sct was good for the position but not for the wobble. Had to use a gpt offset (-posattoff in aplnav) to get the dewobbled line to match with the others.

New offset for Eagle line 5:
sct: -0.14
gpt: 0.10

Reprocessing line 5 for all bands and will add to delivery.

comment:38 Changed 12 years ago by emca

Replaced Eagle line 5 files in the delivery, recreated the screenshot + mosaic and updated Readme.

Reprocessing complete and ready for delivery.

comment:39 Changed 12 years ago by emca

Data sent to PI 16/08/2012

comment:40 Changed 12 years ago by knpa

  • Resolution set to fixed
  • Status changed from assigned to closed

comment:41 Changed 9 years ago by dac

Checked and data available from NEODC (including reprocessed hyperspectral) - marked as archived.

comment:42 Changed 9 years ago by dac

  • Description modified (diff)
Note: See TracTickets for help on using tickets.