Opened 14 years ago

Last modified 8 years ago

#359 closed flight processing

EU10/03 & EUFAR10/01, flight day 232b/2010, Aimwetlab (Kis Balaton) — at Version 23

Reported by: iopa Owned by: emca
Priority: alpha 4 high Milestone: 2010 data processing completion
Component: Archiving Keywords:
Cc: Other processors:

Description (last modified by emca)

Data location: ~arsf/workspace/EU10_03-2010_232b_Aimwetlab_Kis_Balaton

Data arrived from ARSF via SATA disk Q on 15/09/2010.

Scientific objective: Lake Balaton provides an ideal area for testing emerging algorithms on retrieval of in-water constituents and on mapping bloom-forming cyanobacteria using in-situ radiometric, airborne and satellite data.

Priority: a5 - the data set as a whole is listed as a5 due to it being part of EU10/03, however the PI of EU10/03 has lowered the LiDAR priority to a4m, and therefore LiDAR stands with a priority of a4h due to being part of EUFAR10/01.

PI: A. Tyler (EU10/03) & A. Zlinszky (EUFAR10/01)

When data is processed it should be dispatched to both PIs individually for their respective projects.

Note: Data is currently symlinked from ~arsf/arsf_data/2010/flight_data/archive_overflow and when this is resolved the symlinks will need to be re-directed.

Sensors:

  • Eagle (27/10/2010 & 28/10/2010)
  • Hawk (28/01/2011)
  • Leica LIDAR (28/02/2011)
  • Digital Photography (27/10/2010 & 28/10/2010)

Change History (23)

comment:1 Changed 14 years ago by iopa

  • Description modified (diff)

comment:2 Changed 13 years ago by iopa

  • Description modified (diff)

comment:3 Changed 13 years ago by emca

  • Owner set to emca
  • Status changed from new to assigned

Starting Eagle and Camera processing

comment:4 Changed 13 years ago by emca

IPAS and Applanix processing is complete

comment:5 Changed 13 years ago by emca

  • Description modified (diff)

Changed the file structure from EUFAR10-01 to EU10_03 to match the other two projects that have the same dual PIs (#358 & #373)

comment:6 Changed 13 years ago by emca

Hyperspectral is ready for delivery check
~airborne/workspace/EU10_03-2010_232b_Aimwetlab_Kis_Balaton/delivery/20101018/EU10_03

comment:7 Changed 13 years ago by emca

Camera is ready for delivery check
~airborne/workspace/EU10_03-2010_232b_Aimwetlab_Kis_Balaton/delivery/20101019/EU10_03

comment:8 Changed 13 years ago by iopa

Delivery checked eagle; all's good and ready to deliver.

Delivery checked camera; all's good except the eagle/hawk lines 1,2 and 3 are drawn out of place on googleearth,
lines 1 should start at ~ ( 46°38'3.39"N, 17° 3'33.42"E)
lines 2 should end at ~ ( 46°38'31.15"N, 17° 3'55.78"E)
lines 3 should end at ~ ( 46°31'33.07"N, 17° 6'27.03"E)

sorry for the degrees! it's googleearth.

otherwise ready to deliver.

comment:9 Changed 13 years ago by iopa

Also for the camera readme, since this flight has a flight letter, the filename convention for the kml etc. needs an 'f', and then an extra line written in the description underneath.

comment:10 Changed 13 years ago by knpa

Appears to be an issue with the bandset labels in the header files, they start at 900nm which is lower than it should be. Possibly incorrect bandset selected or none specified. Will leave this until end of the year and new Hawk calibration.

comment:11 Changed 13 years ago by emca

  • Description modified (diff)

Eagle and Camera sent to PI 27/10/2010

comment:12 Changed 13 years ago by emca

Note above delivery relate to A Tyler. Data also needs to be sent to A Zlinszky.

comment:13 Changed 13 years ago by iopa

  • Description modified (diff)

Dispatched Eagle and Camera to Dr. Zlinszky on 28/10/2010.

comment:14 Changed 13 years ago by anch

Starting hawk processing...

comment:15 Changed 13 years ago by anch

SCTs found.

-1: 0.00
-2: 0.00
-3: 0.00
-4: 0.00
-5: 0.00
-6: 0.00

comment:16 Changed 13 years ago by anch

Hawk submitted for delivery check

comment:17 Changed 13 years ago by emca

Starting LiDAR processing

comment:18 Changed 13 years ago by iopa

Finished checking Hawk delivery;

no errors were found, ready to deliver... twice!

comment:19 Changed 13 years ago by anch

  • Description modified (diff)

Hawk delivered 28/01/2011

comment:20 Changed 13 years ago by emca

LiDAR ready for delivery check at
~airborne/workspace/EU10_03-2010_232b_Aimwetlab_Kis_Balaton/delivery/20110211/EU10_03

comment:21 Changed 13 years ago by knpa

Taking LIDAR delivery check.

comment:22 Changed 13 years ago by knpa

Delivery check complete.

All looks good apart from:

All ascii files are one column too long! (9 instead of 8) txyzicra?

Also, remember that this project needs to be delievered to Dr. Zlinszky also, under separate project code.

comment:23 Changed 13 years ago by emca

  • Description modified (diff)

ASCII file format has been changed and now contain 9 columns so no changes made to LiDAR delivery.

LiDAR data sent to A. Tyler 28/02/2011

Hawk and LiDAR need to be sent to A Zlinszky

Note: See TracTickets for help on using tickets.