Opened 14 years ago

Last modified 9 years ago

#359 closed flight processing

EU10/03 & EUFAR10/01, flight day 232b/2010, Aimwetlab (Kis Balaton) — at Version 5

Reported by: iopa Owned by: emca
Priority: alpha 4 high Milestone: 2010 data processing completion
Component: Archiving Keywords:
Cc: Other processors:

Description (last modified by emca)

Data location: ~arsf/workspace/EU10_03-2010_232b_Aimwetlab_Kis_Balaton

Data arrived from ARSF via SATA disk Q on 15/09/2010.

Scientific objective: Lake Balaton provides an ideal area for testing emerging algorithms on retrieval of in-water constituents and on mapping bloom-forming cyanobacteria using in-situ radiometric, airborne and satellite data.

Priority: a5 - the data set as a whole is listed as a5 due to it being part of EU10/03, however the PI of EU10/03 has lowered the LiDAR priority to a4m, and therefore LiDAR stands with a priority of a4h due to being part of EUFAR10/01.

PI: A. Tyler (EU10/03) & A. Zlinszky (EUFAR10/01)

When data is processed it should be dispatched to both PIs individually for their respective projects.

Note: Data is currently symlinked from ~arsf/arsf_data/2010/flight_data/archive_overflow and when this is resolved the symlinks will need to be re-directed.

Sensors:

  • Eagle
  • Hawk
  • Leica LIDAR
  • Digital Photography

Change History (5)

comment:1 Changed 14 years ago by iopa

  • Description modified (diff)

comment:2 Changed 14 years ago by iopa

  • Description modified (diff)

comment:3 Changed 14 years ago by emca

  • Owner set to emca
  • Status changed from new to assigned

Starting Eagle and Camera processing

comment:4 Changed 14 years ago by emca

IPAS and Applanix processing is complete

comment:5 Changed 14 years ago by emca

  • Description modified (diff)

Changed the file structure from EUFAR10-01 to EU10_03 to match the other two projects that have the same dual PIs (#358 & #373)

Note: See TracTickets for help on using tickets.