Opened 14 years ago

Last modified 9 years ago

#361 closed flight processing

EUFAR10/07 (ADDRESSS), flight day 234b, Summer School Geo Site — at Version 29

Reported by: iopa Owned by: knpa
Priority: alpha 4 high Milestone: 2010 data processing completion
Component: Archiving Keywords:
Cc: Other processors: emca,anch

Description (last modified by knpa)

Data location: ~arsf/workspace/EUFAR10_07-2010_234b_Summer_School_Geo_Site

Data arrived from ARSF via SATA disk Q on 15/09/2010.

Scientific objective: Mapping of lithology, fault structure,
erosion parameters and soil components

Priority: a4h

PI: A. Zlinszky

Note: Data is currently symlinked from ~arsf/arsf_data/2010/flight_data/archive_overflow and when this is resolved the symlinks will need to be re-directed.

PI has requested that data be made available via NEODC promptly as well as normal delivery - data will be downloaded from NEODC by students.

Sensors:

  • Eagle (04/03/2011)
  • Hawk (04/03/2011)
  • Leica LIDAR (20/04/2011)
  • Digital Photography (04/03/2011)

Change History (29)

comment:1 Changed 14 years ago by iopa

  • Summary changed from EUFAR10/07 to EUFAR10/07, flight day 234b, Summer School Geo Site

comment:2 Changed 14 years ago by iopa

  • Description modified (diff)

comment:3 Changed 14 years ago by iopa

Applanix and IPAS have been done. The applanix data currently in the workspace covers both this project and also 234c.
For IPAS, there is processed IPAS in 234a in the workspace that covers 234a,234b,234c.
The proc directory from there could be entirely copied over to 234b or just symlinked, your choice.

comment:4 Changed 14 years ago by knpa

  • Description modified (diff)

Added scientific objective.

comment:5 Changed 14 years ago by benj

  • Description modified (diff)

comment:6 Changed 14 years ago by benj

  • Description modified (diff)

PI has requested that data be made available via NEODC promptly as well as normal delivery - data will be downloaded from NEODC by students.

comment:7 Changed 14 years ago by anch

Starting hyperspectral processing

comment:8 Changed 14 years ago by emca

Processed the camera imagery from raw to tiff format

comment:9 Changed 14 years ago by anch

Hyperspectral ready for delivery check at:

/users/rsg/arsf/workspace/EUFAR10_07-2010_234b_Summer_School_Geo_Site/delivery/20110218/EUFAR10_07

comment:10 Changed 14 years ago by anch

Eagle and Hawk line 5 (006 on logsheet) was not recorded correctly. Images were still captured over the flightline but the hyperspectral data captured was all over a turn where the plane was getting ready for the next flightline and can't be processed using azgcorr

comment:11 Changed 14 years ago by knpa

  • Other processors set to emca,anch
  • Owner set to knpa
  • Status changed from new to assigned

Taking LIDAR.

comment:12 Changed 14 years ago by iopa

Checking hyperspectral.

comment:13 Changed 14 years ago by iopa

Hyperspectral delivery check;

  • need to include flight letter in lev1's and screenshots

all else seems good and ready to deliver.

comment:14 Changed 14 years ago by anch

Filenames fixed, and readme updated to reflect this.

comment:15 Changed 14 years ago by knpa

Processed LIDAR lines.

All have acceptable vertical and horizontal discrepancies except line 1 (09:26) which had a large roll error. Corrected with roll value 0.00125. All others keep default values.

comment:16 Changed 14 years ago by emca

Starting camera processing

comment:17 Changed 14 years ago by anch

Finished camera delivery for emca as she's on leave.

Have kept a copy of Readme.tex as some manual editing was required due complications with line 006 (As detailed above).

Delivery is now ready for checking here:

/users/rsg/arsf/workspace/EUFAR10_07-2010_234b_Summer_School_Geo_Site/delivery/20110303/EUFAR10_07

comment:18 Changed 14 years ago by iopa

Checking camera.

comment:19 Changed 14 years ago by iopa

Camera check;

  • as an observation, flightline 5 in the KML is partly missing since there is no eagle/hawk data as commented previously in this ticket.

otherwise data and delivery are good to go.

comment:20 Changed 14 years ago by anch

  • Description modified (diff)

Camera sent to PI

comment:21 Changed 14 years ago by anch

  • Description modified (diff)

Hyperspectral was also sent to PI 04/03/2011

comment:22 Changed 14 years ago by anch

  • Summary changed from EUFAR10/07, flight day 234b, Summer School Geo Site to EUFAR10/07 (ADDRESSS), flight day 234b, Summer School Geo Site

comment:23 Changed 14 years ago by emca

Delivery checked the LiDAR delivery at
~airborne/workspace/EUFAR10_07-2010_234b_Summer_School_Geo_Site/delivery/20110408

All data looks good. Just need to include the LAS files with the delivery.

comment:24 Changed 14 years ago by knpa

LAS files included with lidar delivery as per above.

LIDAR copied on to hard disk 48. 238c LIDAR is awaiting delivery check so will wait to put that on disk also.

comment:25 Changed 14 years ago by emca

  • Component changed from Processing: general to Archiving

All data has been rsync'd to
/users/rsg/arsf/arsf_data/2010/flight_data/archive-overflow/EUFAR10_07-2010_234b_Summer_School_Geo_Site

Ready for archiving

comment:26 Changed 14 years ago by emca

LAS files included with delivery so removing from leica/proc_laser for archiving

Aimms folder is present, but contained file is empty - not going to archive

Grimm and tabi data present

comment:27 Changed 14 years ago by emca

Leica IPAS project files are missing, have the processed files

comment:28 Changed 14 years ago by emca

Archive tarball created and made available to NEODC

comment:29 Changed 14 years ago by knpa

  • Description modified (diff)

LIDAR delivered today to A. Zlinszky in Tihany, Hungary (20/04/11)

Note: See TracTickets for help on using tickets.