Opened 14 years ago
Last modified 9 years ago
#361 closed flight processing
EUFAR10/07 (ADDRESSS), flight day 234b, Summer School Geo Site — at Version 29
Reported by: | iopa | Owned by: | knpa |
---|---|---|---|
Priority: | alpha 4 high | Milestone: | 2010 data processing completion |
Component: | Archiving | Keywords: | |
Cc: | Other processors: | emca,anch |
Description (last modified by knpa)
Data location: ~arsf/workspace/EUFAR10_07-2010_234b_Summer_School_Geo_Site
Data arrived from ARSF via SATA disk Q on 15/09/2010.
Scientific objective: Mapping of lithology, fault structure,
erosion parameters and soil components
Priority: a4h
PI: A. Zlinszky
Note: Data is currently symlinked from ~arsf/arsf_data/2010/flight_data/archive_overflow and when this is resolved the symlinks will need to be re-directed.
PI has requested that data be made available via NEODC promptly as well as normal delivery - data will be downloaded from NEODC by students.
Sensors:
- Eagle (04/03/2011)
- Hawk (04/03/2011)
- Leica LIDAR (20/04/2011)
- Digital Photography (04/03/2011)
Change History (29)
comment:1 Changed 14 years ago by iopa
- Summary changed from EUFAR10/07 to EUFAR10/07, flight day 234b, Summer School Geo Site
comment:2 Changed 14 years ago by iopa
- Description modified (diff)
comment:3 Changed 14 years ago by iopa
comment:5 Changed 14 years ago by benj
- Description modified (diff)
comment:6 Changed 14 years ago by benj
- Description modified (diff)
PI has requested that data be made available via NEODC promptly as well as normal delivery - data will be downloaded from NEODC by students.
comment:7 Changed 14 years ago by anch
Starting hyperspectral processing
comment:8 Changed 14 years ago by emca
Processed the camera imagery from raw to tiff format
comment:9 Changed 14 years ago by anch
Hyperspectral ready for delivery check at:
/users/rsg/arsf/workspace/EUFAR10_07-2010_234b_Summer_School_Geo_Site/delivery/20110218/EUFAR10_07
comment:10 Changed 14 years ago by anch
Eagle and Hawk line 5 (006 on logsheet) was not recorded correctly. Images were still captured over the flightline but the hyperspectral data captured was all over a turn where the plane was getting ready for the next flightline and can't be processed using azgcorr
comment:11 Changed 14 years ago by knpa
- Other processors set to emca,anch
- Owner set to knpa
- Status changed from new to assigned
Taking LIDAR.
comment:12 Changed 14 years ago by iopa
Checking hyperspectral.
comment:13 Changed 14 years ago by iopa
Hyperspectral delivery check;
- need to include flight letter in lev1's and screenshots
all else seems good and ready to deliver.
comment:14 Changed 14 years ago by anch
Filenames fixed, and readme updated to reflect this.
comment:15 Changed 14 years ago by knpa
Processed LIDAR lines.
All have acceptable vertical and horizontal discrepancies except line 1 (09:26) which had a large roll error. Corrected with roll value 0.00125. All others keep default values.
comment:16 Changed 14 years ago by emca
Starting camera processing
comment:17 Changed 14 years ago by anch
Finished camera delivery for emca as she's on leave.
Have kept a copy of Readme.tex as some manual editing was required due complications with line 006 (As detailed above).
Delivery is now ready for checking here:
/users/rsg/arsf/workspace/EUFAR10_07-2010_234b_Summer_School_Geo_Site/delivery/20110303/EUFAR10_07
comment:18 Changed 14 years ago by iopa
Checking camera.
comment:19 Changed 14 years ago by iopa
Camera check;
- as an observation, flightline 5 in the KML is partly missing since there is no eagle/hawk data as commented previously in this ticket.
otherwise data and delivery are good to go.
comment:21 Changed 14 years ago by anch
- Description modified (diff)
Hyperspectral was also sent to PI 04/03/2011
comment:22 Changed 14 years ago by anch
- Summary changed from EUFAR10/07, flight day 234b, Summer School Geo Site to EUFAR10/07 (ADDRESSS), flight day 234b, Summer School Geo Site
comment:23 Changed 14 years ago by emca
Delivery checked the LiDAR delivery at
~airborne/workspace/EUFAR10_07-2010_234b_Summer_School_Geo_Site/delivery/20110408
All data looks good. Just need to include the LAS files with the delivery.
comment:24 Changed 14 years ago by knpa
LAS files included with lidar delivery as per above.
LIDAR copied on to hard disk 48. 238c LIDAR is awaiting delivery check so will wait to put that on disk also.
comment:25 Changed 14 years ago by emca
- Component changed from Processing: general to Archiving
All data has been rsync'd to
/users/rsg/arsf/arsf_data/2010/flight_data/archive-overflow/EUFAR10_07-2010_234b_Summer_School_Geo_Site
Ready for archiving
comment:26 Changed 14 years ago by emca
LAS files included with delivery so removing from leica/proc_laser for archiving
Aimms folder is present, but contained file is empty - not going to archive
Grimm and tabi data present
comment:27 Changed 14 years ago by emca
Leica IPAS project files are missing, have the processed files
comment:28 Changed 14 years ago by emca
Archive tarball created and made available to NEODC
comment:29 Changed 14 years ago by knpa
- Description modified (diff)
LIDAR delivered today to A. Zlinszky in Tihany, Hungary (20/04/11)
Applanix and IPAS have been done. The applanix data currently in the workspace covers both this project and also 234c.
For IPAS, there is processed IPAS in 234a in the workspace that covers 234a,234b,234c.
The proc directory from there could be entirely copied over to 234b or just symlinked, your choice.