#362 closed flight processing (fixed)
EUFAR10/07 (ADDRESSS), flight day 234d, Summer School Geo Site
Reported by: | iopa | Owned by: | knpa |
---|---|---|---|
Priority: | alpha 4 high | Milestone: | 2010 data processing completion |
Component: | Archiving | Keywords: | |
Cc: | Other processors: |
Description (last modified by iopa)
Data location: ~arsf/workspace/EUFAR10_07-2010_234d_Summer_School_Geo_Site
Data arrived from ARSF via SATA disk Q on 15/09/2010.
Scientific objective: Mapping of lithology, fault strucuture,
erosion parameters and soil components
Priority: a4h
PI: A. Zlinszky
Note: Data is currently symlinked from ~arsf/arsf_data/2010/flight_data/archive_overflow and when this is resolved the symlinks will need to be re-directed.
PI has requested that data be made available via NEODC promptly as well as normal delivery - data will be downloaded from NEODC by students.
Sensors:
- Eagle (04/03/2011)
- Hawk (04/03/2011)
- Leica LIDAR (28/03/2011)
- Digital Photography (04/03/2011)
Change History (32)
comment:1 Changed 14 years ago by iopa
- Description modified (diff)
comment:2 Changed 14 years ago by knpa
- Description modified (diff)
comment:3 Changed 14 years ago by knpa
Appears to be an issue with the bandset labels in the header files; they start at 900nm which is lower than it should be. Possibly incorrect bandset selected or none specified. Will leave this until end of the year and new Hawk calibration.
comment:4 Changed 14 years ago by benj
- Description modified (diff)
comment:5 Changed 14 years ago by benj
- Description modified (diff)
PI has requested that data be made available via NEODC promptly as well as normal delivery - data will be downloaded from NEODC by students.
comment:6 Changed 14 years ago by emca
Processed the camera imagery from raw to tiff format
comment:7 Changed 14 years ago by anch
Applanix has been processed for 238e which covers this flight, so proc has been copied into the applanix folder from 238e
comment:8 Changed 14 years ago by anch
Starting hyperspectral processing
comment:9 Changed 14 years ago by anch
Submitted hyperspectral for delivery check
comment:10 Changed 14 years ago by anch
Starting LiDAR processing.
comment:11 Changed 14 years ago by anch
IPAS from 234e covers this flight so I have copied it from there.
comment:12 Changed 14 years ago by iopa
Checking hyperspectral.
comment:13 Changed 14 years ago by iopa
Hyperspectal checking done;
- there's been a keyboard slip somewhere, proj code is misspelt in delivery directory, DEM name, logsheet, and DEM name within the readme.
- eagle/hawk flightline id's in readme for line 3 should be 012
else the data seems good and ready to deliver.
comment:14 Changed 14 years ago by emca
Starting camera processing
comment:15 Changed 14 years ago by anch
Submitted lidar for delivery check
comment:16 Changed 14 years ago by emca
Camera ready for delivery check at
~airborne/workspace/EUFAR10_07-2010_234d_Summer_School_Geo_Site/delivery/20110303
comment:17 Changed 14 years ago by anch
Checking camera
comment:18 Changed 14 years ago by anch
Camera delivery is fine and ready to deliver
comment:19 Changed 14 years ago by knpa
- Owner set to anch
- Status changed from new to assigned
Taking lidar delivery check.
comment:20 Changed 14 years ago by anch
- Description modified (diff)
Hyperspectral, and camera sent to PI
comment:21 Changed 14 years ago by knpa
LIDAR delivery check complete.
All looks fine apart from:
- lidar ascii files have 'e' in name rather than 'd'. Assuming this is just a typo and these files are for the right project :) Also needs to be fixed in Readme contents section.
- EUFARA10_07-2010_234d_Summer_School_Geo_Site.pdf - project code spelt wrong
comment:22 Changed 14 years ago by anch
- Summary changed from EUFAR10/07, flight day 234d, Summer School Geo Site to EUFAR10/07 (ADDRESSS), flight day 234d, Summer School Geo Site
comment:23 Changed 14 years ago by iopa
- Description modified (diff)
LiDAR has been dispatched (28/03/2011)
comment:24 Changed 14 years ago by emca
- Component changed from Processing: general to Archiving
All data has been rsync'd to
/users/rsg/arsf/arsf_data/2010/flight_data/archive-overflow/EUFAR10_07-2010_234d_Summer_School_Geo_Site
Ready for archiving
comment:25 Changed 14 years ago by emca
LAS files are included with the delivery folder, so have been removed from leica/proc_laser to avoid duplication.
This project had aimms, grimm and tabi data.
comment:26 Changed 14 years ago by emca
Archive tarball created and made available to NEODC
comment:27 Changed 14 years ago by knpa
- Owner changed from anch to knpa
Backed up by NEODC, moved to archive disk.
comment:28 Changed 14 years ago by knpa
- Milestone set to 2010 data processing completion
- Resolution set to fixed
- Status changed from assigned to closed
Deleted workspace version. Closing ticket.
comment:29 Changed 12 years ago by adbe
Hyperspectral Delivery Check:
- Mention dropped scans in ReadMe
- Hawk 3,5,6 mapped filesize does not match with header
comment:30 Changed 12 years ago by anhi
Hawk lines 3,5,6 remade and put into delivery
comment:31 Changed 12 years ago by anhi
Reprocessing hyperspectral delivered to Andras Zlinszky on 12/09/12 on disk 131.
comment:32 Changed 9 years ago by dac
Archiving
Raw and processed data available from NEODC: http://browse.ceda.ac.uk/browse/neodc/arsf/2010/EUFAR10_07/EUFAR10_07-2010_234d_Summer_School_Geo_Site
Added scientific objective.