Opened 14 years ago
Last modified 9 years ago
#368 closed flight processing
EUFAR10/06, flight day 231a/2010 Armsrace — at Version 10
Reported by: | anch | Owned by: | emca |
---|---|---|---|
Priority: | alpha 4 high | Milestone: | 2010 data processing completion |
Component: | Archiving | Keywords: | |
Cc: | Other processors: |
Description (last modified by emca)
Data location: /users/rsg/arsf/workspace/EUFAR10_06-2010_231a_Armsrace
Data arrived from ARSF via SATA disk Q on 15/09/2010.
PI: Mate Stibranyi
Scientific objectives: N/A
Sensors:
- Eagle (25/02/2011)
- Hawk (25/02/2011)
- Leica LIDAR (Requested by PI)
- Digital Photography (Requested by PI)
Change History (10)
comment:1 Changed 14 years ago by anch
comment:2 Changed 14 years ago by knpa
Appears to be an issue with the bandset labels in the header files; they start at 900nm which is lower than it should be. Possibly incorrect bandset selected or none specified. Will leave this until end of the year and new Hawk calibration.
comment:3 Changed 14 years ago by benj
- Description modified (diff)
comment:4 Changed 14 years ago by emca
- Owner set to emca
- Status changed from new to assigned
Processed Applanix and IPAS
Starting Eagle and Camera processing
comment:5 Changed 14 years ago by emca
Also going to do the Hawk processing
comment:6 Changed 14 years ago by emca
Eagle and Hawk processing complete and ready for delivery check at
~airborne/workspace/EUFAR10_06-2010_231a_Armsrace/delivery/20110121
SCT values (and GPT) values for Eagle and Hawk lines:
Line no | Eagle | Hawk |
1 | -0.02 | 0.00 |
2 | -0.06 (-0.09) | -0.01 |
3 | 0.04 | 0.00 |
4 | -0.13 (-0.14) | 0.00 |
5 | 0.04 | 0.00 |
6 | -0.03 | -0.03 |
7 | -0.02 | 0.00 |
8 | 0.03 | 0.00 |
9 | -0.08 | 0.00 |
10 | 0.02 | 0.00 |
Notes:
Eagle/Hawk line 10 was processed using -l 400 8491 in azspec as it contained a bend.
Hawk raw files are numbered incorrectly (do not match the logsheet).
Raw files SWIR*10* correspond to line 1
Raw files SWIR*1* correspond to line 2
Raw files SWIR*2* correspond to line 3
.... etc
Lines were processed to be consistent with the logsheet and the Eagle line numbering.
comment:7 Changed 14 years ago by anch
Delivery checking hyperspectral
comment:8 Changed 14 years ago by anch
Delivery check complete.
Everything looks fine, although there is some cloud over the beginning and end of some lines, which could be mentioned in the data quality section. This is most obvious on lines 7, 8, and 9.
comment:9 Changed 14 years ago by anch
Starting LIDAR processing.
comment:10 Changed 14 years ago by emca
- Description modified (diff)
Eagle and Hawk data sent to PI 25/02/2011
Please note that this project is stored in the archive-overflow directory until space becomes available.