Opened 14 years ago
Last modified 6 years ago
#374 reopened flight processing
EUFAR10/01 (AIMWETLAB), flight day 238d/2010, Lake Balaton Peninsula
Reported by: | iopa | Owned by: | knpa |
---|---|---|---|
Priority: | alpha 4 high | Milestone: | |
Component: | Archiving | Keywords: | |
Cc: | Other processors: | emca |
Description (last modified by iopa)
Data location: ~arsf/workspace/EUFAR10_01-2010_238d_Lake_Balaton_Peninsula
Data arrived from ARSF via SATA disk Q on 15/09/2010.
However missing IPAS and LiDAR data on disk Q and on thelma delayed unpacking until 06/10/2010.
Scientific objective: Mapping of species composition and stand health of shore vegetation, mapping of shore elevation and inundation structure.
This flight will also be used for EUFAR10-07.
Scientific Objective: High accuracy land use/land cover mapping, forest type mapping and invasive shrub species location
Priority: a4h
PI: A. Zlinszky
This is the second set of data of the split 238c (see http://arsf-dan.nerc.ac.uk/trac/ticket/373 for details)
Note: Data is currently symlinked from ~arsf/arsf_data/2010/flight_data/archive_overflow and when this is resolved the symlinks will need to be re-directed.
Sensors:
- Eagle (28/03/2011)
- Hawk (28/03/2011)
- Leica LIDAR (04/03/2011)
- Digital Photography (04/03/2011)
Change History (30)
comment:1 Changed 14 years ago by iopa
comment:3 Changed 14 years ago by knpa
- Description modified (diff)
This flight will also be used for EUFAR10-07.
comment:4 Changed 14 years ago by emca
Processed the camera imagery from raw to tiff
comment:5 Changed 14 years ago by anch
Taking LiDAR and camera
comment:6 Changed 14 years ago by anch
IPAS for 238c covers this flight and has already been processed so I am using this to process LIDAR and tag photos.
comment:7 Changed 14 years ago by anch
Re-processing camera so that we can re tag with corrected event file.
comment:8 Changed 14 years ago by anch
Lidar submitted for delivery check
comment:9 Changed 14 years ago by emca
LiDAR delivery check complete.
Data is good, just a couple of fixes/typos:
Change julian day to 238d on logsheet
PI name incorrectly spelt on logsheet
Readme: dem resolution should be 2.0
Screenshot names - rename to standard name
DEM name - change to reflect new convention (-lidar-ASTER)
comment:10 Changed 14 years ago by anch
Camera ready for checking at:
/users/rsg/arsf/workspace/EUFAR10_01-2010_238d_Lake_Balaton_Peninsula/delivery/20110303/EUFAR10_01
comment:11 Changed 14 years ago by iopa
Checking camera.
comment:12 Changed 14 years ago by iopa
Camera check;
data and delivery are good and ready to deliver.
comment:14 Changed 14 years ago by iopa
For Hyperspectral processor ; line 24 for Eagle & Hawk should be sliced around halfway as it looks like (when used for other testing) the lens was covered before the sensors were turned off.
comment:15 Changed 14 years ago by emca
- Other processors set to emca
Starting Hyperspectral processing
comment:16 Changed 14 years ago by anch
- Summary changed from EUFAR10/01, flight day 238d/2010, Lake Balaton Peninsula to EUFAR10/01 (AIMWETLAB), flight day 238d/2010, Lake Balaton Peninsula
comment:17 Changed 14 years ago by emca
Hyperspectral data is ready for delivery check at
/users/rsg/arsf/workspace/EUFAR10_01-2010_238d_Lake_Balaton_Peninsula/delivery
SCT values:
Line | Eagle | Hawk |
15 | +0.03 | -0.01 |
16 | -0.02 | 0.00 |
17 | 0.00 | +0.02 |
18 | 0.00 | 0.00 |
19 | +0.03 | 0.00 |
20 | +0.04 | +0.02 |
21 | 0.00 | 0.00 |
22 | 0.00 | +0.02 |
23 | +0.01 | 0.00 |
24 | 0.00 | 0.00 |
Notes:
Line 20 contained a bend so both eagle and hawk lines were processed using -l 250 6000 in azspec
As noted above the end of line 24 was removed. Eagle was processed using -l 0 6590 and hawk using -l 0 6200 in azspec.
comment:18 Changed 14 years ago by iopa
Hyperspectral check complete;
nothing to report, ready to go.
comment:19 Changed 14 years ago by iopa
- Description modified (diff)
Hyperspectral has been dispatched (28/03/2011)
comment:20 Changed 14 years ago by knpa
- Component changed from Processing: general to Archiving
- Owner set to knpa
- Status changed from new to assigned
Project has been r-synced, beginning archiving.
comment:21 Changed 14 years ago by knpa
AIMMS and GRIMM data present
comment:22 Changed 14 years ago by knpa
Tarball created, made available to NEODC (17/05/11)
comment:23 Changed 13 years ago by knpa
Backed-up by NEODC.
Moved to archive disk.
comment:24 Changed 12 years ago by knpa
- Resolution set to fixed
- Status changed from assigned to closed
Removed workspace version. Closing ticket.
comment:25 Changed 12 years ago by emca
- Resolution fixed deleted
- Status changed from closed to reopened
Hyperspectral reprocessing completed by adbe
Creating delivery as he is on leave this week
comment:26 Changed 12 years ago by emca
Delivery created, ready for checking.
comment:27 Changed 12 years ago by besm
Delivery checked for reprocessing. No problems found.
comment:28 Changed 12 years ago by anhi
Reprocessing hyperspectral delivered to Andras Zlinszky on 12/09/12 on disk 131.
comment:29 Changed 6 years ago by wja
Archiving
Have restructured LiDAR delivery (previous delivery is in previous_deliveries/) to contain ascii data in flightlines/ascii/ in order to create JSONs.
comment:30 Changed 6 years ago by wja
Archiving
JSONs RSYNCed to CEDA (all data is already archived).
Applanix and IPAS are common with 238c and need only be processed once.