Opened 13 years ago

Last modified 6 years ago

#392 closed flight processing

EUFAR11/04, flight day 097/2011, HYMEDECOS (Gradients) — at Version 11

Reported by: knpa Owned by: knpa
Priority: alpha 4 high Milestone: 2011 data processing completion
Component: Archiving Keywords:
Cc: Other processors:

Description (last modified by knpa)

Data location: ~arsf/arsf_data/2011/flight_data/spain_portugal/EUFAR11_04-2011_097_HYMEDECOS-gradients/

Data arrived from ARSF via network transfer on 19/04/11.

Scientific objective: Applied studies relating to soil erosion, biodiversity - vegetation and steppe bird - dynamics, estimates of forage crop quality and carbon storage potential will be carried out. Two spatial resolutions.

Priority: a4h

PI: Patrick Hostert
Co-PI: Patrick Osborne

Other contacts:
Pedro Leitao

Sensors:

  • Eagle (requested)
  • Hawk (requested)
  • Leica LIDAR (requested)
  • RCD (collected but not requested)

Change History (11)

comment:1 Changed 13 years ago by emca

The LiDAR lines at higher altitude (lines 7-12) have very low intensity values - initally thought to be caused by the intemittent AGC issue that affected the calibration data (#389). Queried with Leica and they think it is a result of the very high altitude of flight.

comment:2 Changed 13 years ago by knpa

  • Owner set to knpa
  • Status changed from new to assigned

Taking HS.

comment:3 Changed 13 years ago by knpa

The only basestation data for this flight is the ARSF temporary basestation over 100km away from main site. I've also found a EUREF permanent basestation (LAGO) but this is only 30s interval. Temporarily on hold whilst Ops get back to us to let us know if there is any better data for us to use.

comment:4 Changed 13 years ago by anch

  • Description modified (diff)

comment:5 Changed 13 years ago by anch

Processing RAW camera to tif.

comment:6 Changed 13 years ago by anch

Produced thumbnails from TIFFs

comment:7 Changed 13 years ago by knpa

  • Milestone set to 2011 data processing completion

Basestation data received today (05/07/11) from Pedro Leitao. Should be able to unblock this project.

comment:8 Changed 13 years ago by knpa

Was on hold for a few more days whilst we waited for precise basestation coords from Pedro.

anch is now doing the navigation processing.

comment:9 Changed 13 years ago by anch

Navigation has been processed and verified against ASTER to be correct.

comment:10 Changed 13 years ago by anch

Camera ready for delivery check at:

/data/okhotsk1/scratch/arsf/arsf_data/2011/flight_data/spain_portugal/EUFAR11_04-2011_097_HYMEDECOS-gradients/processing/delivery/EUFAR11_04-097-camera-20110718

comment:11 Changed 13 years ago by knpa

  • Description modified (diff)
Note: See TracTickets for help on using tickets.