#413 closed flight processing (fixed)
EUFAR11/07, flight day 222/2011, Toledo
Reported by: | knpa | Owned by: | knpa |
---|---|---|---|
Priority: | alpha 4 high | Milestone: | 2011 data processing completion |
Component: | Archiving | Keywords: | |
Cc: | Other processors: |
Description (last modified by adbe)
Data location: /users/rsg/arsf/arsf_data/2011/flight_data/spain_portugal/EUFAR11_07-2011_222_Toledo/
Data arrived from ARSF via network transfer on 16/08/2011
EUFAR11_07 Scientific objective:
Soil erosion study.
EUFAR11_07 Priority: a4h
PI: Thomas Schmid
Notes: Camera is recorded on logsheet but not present.
Sensors:
Eagle (10/10/2011)
Hawk (10/10/2011)
LiDAR (10/10/2011)
Change History (35)
comment:1 Changed 13 years ago by knpa
- Summary changed from EUFAR11_07, flight day 222/2011, Toledo to EUFAR11/07, flight day 222/2011, Toledo
comment:2 Changed 13 years ago by jaho
comment:3 Changed 13 years ago by knpa
- Owner set to jaho
- Status changed from new to assigned
Thomas Schmid has said he will provide us with some basestation data via FTP.
comment:4 Changed 13 years ago by knpa
Basestation data referred to above has been received and put into $project/posatt/basestation/toledo_basestation_schmid
comment:5 Changed 13 years ago by adbe
Processed navigation for flight
comment:6 Changed 13 years ago by adbe
Now processing lidar using alspp
comment:7 Changed 13 years ago by adbe
Now checking elevation difference between LiDAR lines
comment:8 Changed 13 years ago by adbe
Generating hyperspectral lines
comment:9 Changed 13 years ago by adbe
Eagle line 3 has a strange line along it, will split it up
comment:10 Changed 13 years ago by adbe
Hawk line 7 has stopped a short time into the flight, it does not really cover the region. Possibly not process it
comment:11 Changed 13 years ago by adbe
Phil Goy has updated the hawk line 7 file, it is longer, but is all noise
comment:12 Changed 13 years ago by adbe
Created delivery for LiDAR
comment:13 Changed 13 years ago by adbe
The updated hawk line 7 is the corresponding eagle line with a hawk header and name SWIR*. So it first appeared as noise
comment:14 Changed 13 years ago by adbe
Created delivery, will wait for response from phil about hawk line 7
comment:15 Changed 13 years ago by jaho
Lidar delivery check complete. No issues found.
The data is ready to deliver.
comment:16 Changed 13 years ago by mggr
Damaged line 7 possibly recovered (it was a disk error).
The recovered file will likely have some junk data (probably a line or two of zeros in a few adjacent bands) in the first part of the flightline. I think it'll be around line 1318 band 22, but I may have calculated that wrong ;) Anyway, look out for it and make sure it's noted if found.
comment:17 Changed 13 years ago by adbe
Processed hawk line 7 (Had to split into two, very high and 0 values 600 lines down, not over main area), created hyperspectral delivery. Ready for delivery check.
comment:18 Changed 13 years ago by jaho
Hyperspectral delivery check:
All looks good except:
- Eagle: first and last bands are all black, there seems to be some noise in bands 226-228.
- Hawk: there's a lot of noise in bands 56-65 and 140-150, also some random vertical lines across the pictures in FastQC.
- FastQC shows header file-size error when opening some of the files.
comment:19 Changed 13 years ago by adbe
Hyperspectral:
- Mentioned about first and last eagle bands
comment:20 Changed 13 years ago by adbe
- Component changed from Processing: general to Archiving
- Description modified (diff)
Delivered Hyperspectal and LiDAR data to Thomas Schmid on disk 116 on 10/10/2011
comment:21 Changed 13 years ago by mark1
Hyperspectral hawk bad pixel files and XML files have been re-created and re-delivered to PI (via email). This corrects sample number in bad pixel text files and Eagle IFOV value in XML and extra comments included.
comment:22 Changed 13 years ago by adbe
Hyperspectral sct's
line | eagle | hawk |
1 | -0.09 | -0.04 |
2 | -0.09 | -0.08 |
3 | 1.33 | -0.03 |
4 | -0.05 | -0.07 |
5 | -0.04 | -0.03 |
6 | -0.06 | 0.25 |
7 | -0.03 | -0.03 |
8 | -0.06 | -0.04 |
9 | -0.04 | -0.02 |
10 | -0.06 | -0.04 |
11 | -0.03 | -0.05 |
12 | -0.06 | -0.07 |
13 | -0.04 | -0.02 |
14 | -0.06 | -0.08 |
15 | -0.06 | -0.08 |
comment:23 Changed 13 years ago by knpa
Beginning archiving.
comment:24 Changed 13 years ago by knpa
- Owner changed from jaho to knpa
Project prepared for archiving, will make available to NEODC once we've sorted out their access to our repository.
comment:25 Changed 13 years ago by knpa
Backed-up by NEODC, moved to archive disk.
comment:26 Changed 12 years ago by knpa
- Resolution set to fixed
- Status changed from assigned to closed
comment:27 Changed 12 years ago by emca
Contacted by Sabine Chabrilla @ potsdam who requested a new 2m LiDAR-ASTER DEM to cover the study area.
Created this and uploaded it to her ftp site 24/08/2012
comment:28 Changed 12 years ago by mark1
Contacted by Sabine Chabrilla who noticed that Hawk flight line h222061b.bil did not look correct (high noise in bands - lots of underflows). Appears to be due to a strip of high values in the dark frames.
Have re-processed the flight line and uploaded it to our ftp site 28/08/2012.
comment:29 Changed 12 years ago by mark1
Updated SCT value for Hawk line 6 (h222061b) to -0.05
comment:30 Changed 12 years ago by mark1
Contacted by Sabine Chabrillat who requested the DEM be extended to cover data from flight day 220 also.
comment:31 Changed 12 years ago by mark1
And this (see above comment) was delivered on 04/09/2012
comment:32 Changed 9 years ago by dac
Moved processing/delivery to delivery folder. Hardlinked all folders (except DEM) from EUFAR11_07-222-lidar-20110915 to EUFAR11_07-222-lidar-20120904 to make complete delivery.
comment:33 Changed 7 years ago by dac
Mapped hyperspectral data and created new delivery by hardlinking old one and adding mapped files to it.
comment:34 Changed 7 years ago by asm
Archiving
Mapped files were not present in the hyperspectral delivery. Created the mapped files and a new delivery in order to create as well JSON files for the EUFAR flight finder tool. New delivery and JSON files are being uploaded to CEDA (started on 15/01/2018).
comment:35 Changed 7 years ago by asm
Archiving
Upload finished, CEDA notified on 18/01/2017.
Project blocked. Waiting for basestation data to start navigation processing.