Opened 13 years ago
Last modified 13 years ago
#420 assigned flight processing
GB11/00, flight day 272b/2011, Little Rissington
Reported by: | knpa | Owned by: | knpa |
---|---|---|---|
Priority: | immediate | Milestone: | 2011 data processing completion |
Component: | Archiving | Keywords: | |
Cc: | Other processors: | knpa |
Description
Data location: ~arsf/arsf_data/2011/flight_data/arsf_internal/GB11_00-2011_272b_Little_Rissington
Data arrived from ARSF via network transfer on 06/10/2011
GB11/00 Scientific objective: ARSF boresight flight.
GB11/00 Priority: urgent
PI: ARSF Internal
Notes: End of year boresight flight.
Sensors:
Camera (Flown but not required)
Eagle (Requested)
Hawk (Requested)
LiDAR (Requested)
Change History (9)
comment:1 Changed 13 years ago by knpa
comment:2 Changed 13 years ago by knpa
Navigation complete.
Created sol, camera sol, and sbet.
comment:3 Changed 13 years ago by knpa
Eagle 17 has a nonsense gps end point:
GPS Ending point = {209.578064, 113.273148}
comment:4 Changed 13 years ago by knpa
Starting HS boresight.
comment:5 Changed 13 years ago by emca
Processing LiDAR calibration
Initial comparison to ground control points shows an elevation offset of ~20cm
comment:6 Changed 13 years ago by emca
LiDAR Calibration:
Reprocessed navigation, improved solution but result not great. Reprocessed the LAS files and they still differs from ground control points, but less than before. Compared to ground points using lascontrol, not TScan. Will check on TScan when windows machine is free. Possibly elevation differences are due to navigation problems.
PRH values look okay - not great but reasonable.
comment:7 Changed 13 years ago by knpa
Processed hyperspectral lines with previous boresight and they look fine after sct correction.
e1 (South), e2 (West), e3 (East) checked. A couple of pixels movement at edges but no worse than result of previous boresight (a bit better in fact - possibly due to a bad DEM being used last time).
h6 (South), h7 (East), h8 (West) checked - same as eagle.
comment:8 Changed 13 years ago by emca
Due to the elevation differences the LiDAR calibration has been reflown on day 301 - see ticket #424
comment:9 Changed 13 years ago by knpa
- Component changed from Processing: general to Archiving
- Milestone set to 2011 data processing completion
- Owner changed from emca to knpa
- Status changed from new to assigned
Have prepared project for archiving.
Starting navigation processing.