Opened 13 years ago

Last modified 9 years ago

#440 new flight processing

GB12/00, flight day 125/2012, Heerbrug

Reported by: knpa Owned by: emca
Priority: immediate Milestone: 2012 data processing completion
Component: Processing: general Keywords:
Cc: Other processors: knpa

Description (last modified by knpa)

Data location: /users/rsg/arsf/arsf_data/2012/flight_data/arsf_internal/GB12_00-2012_125_Heerbrug_Cal

Data arrived from ARSF via network transfer on 08/05/2012

GB12/00 Scientific objective: Covers several flights for the 2012 season. Boresight and calibration flights

GB12/00 Priority: urgent

PI: ARSF Internal

Notes: Calibration flight in Heerbrug, Switzerland.

Sensors:

Camera (Requested)
Eagle (Requested)
Hawk (Requested)
LiDAR (Requested)

Change History (11)

comment:1 Changed 13 years ago by knpa

  • Description modified (diff)

comment:2 Changed 13 years ago by emca

Processing the LiDAR calibration.

Started with the navigation data but had some problems getting an adequate solution. Emailed Leica support to see if they can help.

comment:3 Changed 13 years ago by emca

Ops are going to attempt to fly another calibration over Little Riss on Saturday (12/05/2012) so if that is sucessful then won't proceed any further with this data.

comment:4 Changed 13 years ago by emca

Leica got back about the nav data and have been able to get an improved solution - contuinuing with the LiDAR calibration.

comment:5 Changed 13 years ago by knpa

Proceeding with HS calibration.

comment:6 Changed 13 years ago by knpa

  • Other processors set to knpa

comment:7 Changed 13 years ago by knpa

Found SCTs for lines to be used in boresight:

E H
1 -0.03 -0.03
2 1.86 -0.06
3 0.01 -0.06
5 0.00 -0.03
6 0.00 -0.06
7 -0.02 1.82

Lines E2 and H2 have no sync messages.

comment:8 Changed 13 years ago by knpa

Boresights found: (P,R,H)

E: -0.30 0.22 0
H: -0.33 0.28 0

comment:9 Changed 13 years ago by emca

Processed the LiDAR calibration

Couple of points to note:

  • the roll error is still evident in this data - emailed Leica support but not heard back from them yet
  • due to lack of ground control points at nadir the range correction needs to be verified against another dataset (a cal flight over little riss)
  • data that is processed using this calibration should be checked carefully for any boresight errors

comment:10 Changed 13 years ago by emca

Processed the day 082 data and found a slight height offset (~15cm) from the GCPs - redid the range correction using the little riss data

comment:11 Changed 9 years ago by dac

Camera delivery had been finalised. Had a quick look at all OK so marking as finished on the status page.

Note: See TracTickets for help on using tickets.