Opened 12 years ago
Last modified 7 years ago
#441 closed flight processing
GB12/06, flight day 172a/2012, Harnhill — at Version 22
Reported by: | knpa | Owned by: | knpa |
---|---|---|---|
Priority: | alpha 4 medium | Milestone: | 2012 data processing completion |
Component: | Processing: general | Keywords: | |
Cc: | Other processors: | adbe |
Description (last modified by adbe)
Data location: /users/rsg/arsf/arsf_data/2012/flight_data/uk/GB12_06-2012_172a_Harnhill
Data arrived from ARSF via network transfer on 22/06/2012
GB12/06 Scientific objective:
GB12/06 Priority: a4m
PI: Anthony Beck
Sensors:
Camera (6/7/2012)
Eagle (6/7/2012)
Hawk (6/7/2012)
lidar (+FWF) (6/7/2012)
Change History (22)
comment:1 Changed 12 years ago by knpa
- Description modified (diff)
- Summary changed from GB12/06, flight day 201a/2012, Harnhill to GB12/06, flight day 172a/2012, Harnhill
comment:2 Changed 12 years ago by knpa
- Description modified (diff)
comment:3 Changed 12 years ago by knpa
- Description modified (diff)
- Owner set to knpa
- Status changed from new to assigned
comment:4 Changed 12 years ago by adbe
Processed navigation. When processing in grafnav there was a drop out of the navigation on a bend around the flight area, Mark thinks that this could be due to losing satellites when banking; hopefully this will not cause any problems later on.
comment:5 Changed 12 years ago by adbe
Started processing hyperspectral.
comment:6 Changed 12 years ago by adbe
Found sct's
line | eagle | hawk |
1 | -0.04 | -0.02 |
2 | -0.04 | -0.02 |
3 | -0.04 | -0.06 |
4 | -0.04 | -0.04 |
5 | -0.04 | -0.04 |
6 | -0.04 | -0.08 |
7 | -0.04 | -0.06 |
comment:7 Changed 12 years ago by adbe
Hyperspectral delivery created.
comment:8 Changed 12 years ago by knpa
adbe has created the rcd tiffs, thumbnails and processed image events file.
comment:9 Changed 12 years ago by knpa
- Other processors set to adbe
comment:10 Changed 12 years ago by knpa
Removed tiffs 1-16 as these are calibration ones.
comment:11 Changed 12 years ago by knpa
Camera ready for delivery check.
comment:12 Changed 12 years ago by adbe
Camera delivery check:
- ARSF Project Code: GB12_06 (should be GB12/06)
Otherwise, ready to deliver.
comment:13 Changed 12 years ago by knpa
Fixed proj code format, ready to deliver.
comment:14 Changed 12 years ago by knpa
Beginning LiDAR processing.
adbe has already created the las files (incl. full waveform)
comment:15 Changed 12 years ago by knpa
No vertical or horizontal discrepancies found.
Lines up well with OS vectors.
comment:16 Changed 12 years ago by knpa
las files fully classified.
comment:17 Changed 12 years ago by knpa
Beginning HS delivery check.
comment:18 Changed 12 years ago by knpa
Delivery check complete. No problems found.
The only thing is strange is that the 3rd line is so short (it doesn't even come up to the cross line) and this gives a gap in coverage. Compare this with the lidar where that lines goes all the way across the site. Maybe look into this and see if there was a problem somewhere, or if the instrument was just switched off at that point.
comment:19 Changed 12 years ago by knpa
adbe has done the delivery for LiDAR so this is ready for delivery check (not by me or adbe)
comment:20 Changed 12 years ago by adbe
The hand-written logsheet mentioned that the Eagle and Hawk had mis-triggered for the line 3. So have added this to typed logsheet and ReadMe.
comment:21 Changed 12 years ago by jaho
LiDAR delivery check:
No issues. Ready to deliver.
comment:22 Changed 12 years ago by adbe
- Description modified (diff)
Camera, Hyperspectral, Lidar(+FWF) delivered to Anthony Beck on 6/7/2012 on disk 124.
This flight was incorrectly labelled 201 by ops, so it still says this on the handwritten logsheet and possibly in other places.