Opened 10 years ago
Closed 7 years ago
#465 closed flight processing (fixed)
GB12/05, flight day 290/2012, Brampton
Reported by: | knpa | Owned by: | tipo |
---|---|---|---|
Priority: | alpha 4 medium | Milestone: | 2012 data processing completion |
Component: | Archiving | Keywords: | |
Cc: | Other processors: |
Description (last modified by edfi)
Data location: /users/rsg/arsf/arsf_data/2012/flight_data/uk/GB12_05-2012_290_Brampton
Data arrived from ARSF via SATA disk on 19/10/2012
GB12/05 Scientific objective: unknown
GB12/05 Priority: a4m
PI: Ross Hill
Notes: FW LiDAR present
Sensors:
Camera (09/04/13)
Eagle (07/12/12)
Hawk (07/12/12)
LiDAR (07/12/12)
FW LiDAR (23/07/13)
Change History (38)
comment:1 Changed 10 years ago by knpa
- Description modified (diff)
comment:2 Changed 10 years ago by knpa
- Description modified (diff)
- Summary changed from GB12/05, flight day 289/2012, Brampton to GB12/05, flight day 290/2012, Brampton
comment:3 Changed 10 years ago by edfi
comment:4 Changed 10 years ago by knpa
Beginning LiDAR processing.
knpa teaching edfi.
comment:5 Changed 10 years ago by edfi
LiDAR classified, no vector data available. LiDAR delivery complete
comment:6 Changed 10 years ago by knpa
Hyperspectral processing (knpa showing tipo)
comment:7 Changed 10 years ago by mark1
Lidar delivery check completed - all looks ok.
comment:8 Changed 10 years ago by tipo
Finished hyperspectral processing.
comment:9 Changed 10 years ago by edfi
Beginning hyperspectral delivery check
comment:10 Changed 10 years ago by edfi
ReadMe missing, DEM needs renaming to convention, check_apl_cmd not working could be similar to 249 (Luton) in that the hyp_genreadme_config file are not correct, in particular the file names do not match the naming convention.
Level 1 files look ok
Will look again when these have been adjusted
comment:11 Changed 10 years ago by tipo
Fixed the above stuff and reprocessed for all bands
comment:12 Changed 10 years ago by edfi
In flightlines/level1b which files are correct e290081b_n_sct-0.01.bil are correct or not needed? The same in line_information and navigation.
Just a versioning issue I think from multiple runs. Everything else looks fine
comment:13 Changed 10 years ago by tipo
Removed the old files and renamed the newer ones to remove the _sct-0.01 bit
comment:14 Changed 10 years ago by edfi
Hyperspectral check complete all now looks fine
comment:15 Changed 10 years ago by edfi
Beginning Camera delivery check
comment:16 Changed 10 years ago by edfi
LiDAR and Hyperspectral loaded onto HDD 142. Camera may be sent at a later date
comment:17 Changed 10 years ago by edfi
LiDAR and Hyperspectral sent special delivery to PI (Ross Hill) 07/12/12
comment:18 Changed 10 years ago by edfi
- Description modified (diff)
comment:19 Changed 10 years ago by tipo
SCT values:
Line | Eagle | Hawk |
1 | -0.03 | -0.06 |
2 | -0.02 | -0.07 |
3 | -0.03 | -0.06 |
4 | -0.01 | -0.06 |
5 | -0.01 | -0.06 |
6 | -0.02 | -0.06 |
7 | -0.01 | -0.06 |
8 | -0.01 | -0.06 |
comment:20 Changed 9 years ago by edfi
Starting Vector check for LiDAR and Hyperspectral
comment:21 Changed 9 years ago by edfi
Vector check complete. Total coverage of the area was not possible due to gaps in the data sent by OS. Readme updated. Ready for re-check
comment:22 Changed 9 years ago by anhi
LiDAR Vector Delivery Check:
No problems
comment:23 Changed 9 years ago by anhi
Hyperspectral vector check:
- gdal_translate example command in Readme needs correcting
comment:24 Changed 9 years ago by edfi
Unzipping files to remake Readme
comment:25 Changed 9 years ago by edfi
New ReadMe made and unzipped files removed
comment:26 Changed 9 years ago by anhi
Readme checked no problems found.
comment:27 Changed 9 years ago by edfi
- Description modified (diff)
comment:28 Changed 9 years ago by edfi
Available RCD dispatched 09/04/13 - RCD suffered error during flight
comment:29 Changed 9 years ago by tipo
- Component changed from Processing: general to Archiving
- Owner set to benj
comment:30 Changed 9 years ago by tipo
- Owner changed from benj to tipo
- Status changed from new to assigned
Beginning archiving
comment:31 Changed 9 years ago by edfi
- Description modified (diff)
comment:32 Changed 9 years ago by edfi
FW LiDAR Processed, ready for check
comment:33 Changed 9 years ago by tipo
LiDAR checked, no problems found.
comment:34 Changed 9 years ago by edfi
- Description modified (diff)
comment:35 Changed 9 years ago by edfi
FW LiDAR Dispatched to PI
comment:36 Changed 7 years ago by tec
Archiving
Started
Ready for upload
comment:37 Changed 7 years ago by dac
Archiving
Received conformation from Wendy raw and processed data have been archived 27/07/2015
comment:38 Changed 7 years ago by dac
- Resolution set to fixed
- Status changed from assigned to closed
finished navigation processing, created sol files incl. camera.