Opened 7 years ago
Last modified 7 years ago
#621 new flight processing
ES17/126, flight day 170/2017, Alto Tajo
Reported by: | asm | Owned by: | |
---|---|---|---|
Priority: | immediate | Milestone: | The Glorious Future |
Component: | Processing: general | Keywords: | |
Cc: | Other processors: |
Description
Data location: ~arsf/arsf_data/2017/flight_data/spain/ES17_126-2017_170_Alto_Tajo
Data arrived from NERC-ARF via hard drive 2017-06-30
Scientific objective: Assess changes in "Alto Tajo" Natural Park
Priority: Urgent
PI: David Coomes
Sensors:
- Fenix (flown, requested)
- Leica LIDAR (flown, requested, failed during acquisition)
- OWL (flown, requested)
- PhaseOne (flown, not requested)
Change History (27)
comment:1 Changed 7 years ago by asm
comment:2 Changed 7 years ago by asm
Unpacking
Have run unpacked checks:
-Timestamp not constant/missing timestamps at the end of fenix nav file 13.
-Same for owl nav file 13
-8 different owl flightlines have dropped frames incidents with 1 or 2 dropped frames.
comment:3 Changed 7 years ago by dac
GPS basestation data provided by PI and copied to: /users/rsg/arsf/arsf_data/2017/misc/basestation_data/ES17_126_Basestation_Data
comment:4 Changed 7 years ago by dac
Digital Camera
Started converting raw images to tif.
comment:5 Changed 7 years ago by dac
Digital Camera
Raw images converted to tiff. Waiting on basestation height before tagging.
comment:6 Changed 7 years ago by dac
Navigation
Started navigation processing. Basestation height was extracted from data by NERC GEF:
HUERTA1: Height reading 0.921m, total vertical height 1.291m
Converted format using: teqc +nav HUERTA_9500_0619_091531.17n HUERTA_9500_0619_091531.m00 > HUERTA_9500_0619_091531.17o
comment:7 Changed 7 years ago by asm
Navigation
Took over the processing to solve epoch issues. Re-started navigation process. Converted data using:
teqc -st 170619071655 -e 170619123622 +nav huerta.17n HUERTA_9500_0619_091531.m00 > huerta.17o
Basestation verification finished
Latitude : 40 49 29.99667
Longitude -2 16 47.08715
Ell. Height: 1193.148 m
Ant. Height: 1.291 m
comment:8 Changed 7 years ago by asm
Navigation Processing
Done. Same problems than for 172 2017, there were errors in the data (Doppler LSQ solution had high RMS), could not compute so had to recalculate Doppler for Static Data using Ephemeris. Satellite elevation mask is 8, separation is less than 0.5 metres (lat, lon and height) with a couple of spikes of 1m but Fenix pixel size is 3m at nadir.
comment:9 Changed 7 years ago by dac
Hyperspectral Processing
Found SCT values:
Flightline | FENIX |
1 | 1 |
2 | 1 |
3 | 2 |
4 | 1 |
5 | 2 |
6 | 1 |
7 | 2 |
8 | 2 |
9 | 2 |
10 | 1 |
11 | 1 |
12 | 1 |
13 | 2 |
Starting to map all bands.
comment:10 Changed 7 years ago by dac
Thermal processing
Started processing. Set calibration running on grid.
comment:11 Changed 7 years ago by dac
Hyperspectral processing
Created delivery - ready for checking.
comment:12 Changed 7 years ago by dac
Thermal processing
For all lines SCT=2. Setting mapping running for all bands.
comment:13 Changed 7 years ago by dac
Thermal processing
Created delivery for Owl data. Most files don't have overflows populated in the readme - not sure if this is genuine or a problem with script. Would be good to confirm in delivery check.
Ready for delivery check.
comment:14 Changed 7 years ago by asm
Hyperspectral Delivery Check
Started.
comment:15 Changed 7 years ago by mark1
Thermal delivery check
Everything looks fine from what I can see. All files are present, named correctly, open and contain data.
Tested commands and work OK.
Just need to zip the mapped images.
comment:16 Changed 7 years ago by mark1
Thermal delivery check
Mapped images have been zipped. Ready to deliver.
comment:17 Changed 7 years ago by asm
Fenix Hyperspectral DC
All checks done successfully. Files open OK and spectra looks fine (checked with Py6S for most lines and for those which can't find a vegetation pixel checked using tuiview). Will zip the map files and project will be ready for delivery.
comment:18 Changed 7 years ago by asm
Fenix Hyperspectral DC
Mapped images have been zipped. Ready to deliver.
comment:19 Changed 7 years ago by dac
Fenix and Owl Delivery
Files placed on FTP (slot 9) for PI. Notification email sent.
comment:20 Changed 7 years ago by dac
Digital Camera
Created delivery. Ready for checking.
comment:21 Changed 7 years ago by asm
Digital Camera Delivery Check
Started.
comment:22 Changed 7 years ago by asm
Digital Camera Delivery Check
All checks have been made successfully. Project is ready to be delivered.
comment:23 Changed 7 years ago by asm
Camera Delivery
PhaseOne delivered via FTP slot 9 on 18/10/2017
comment:24 Changed 7 years ago by asm
Archiving
Tidied up for archiving.
comment:25 Changed 7 years ago by dac
Archiving
Available to download from CEDA: http://data.ceda.ac.uk/neodc/arsf/2017/ES17_126/ES17_126-2017_170_Alto_Tajo/
Leaving ticket open as producing orthomosaics from digital camera data.
comment:26 Changed 7 years ago by wja
Photogrammetry Processing
Additional processing using Agisoft Photoscan has been carried out to generate a DEM, orthomosaic and point cloud which are found under S17_126-170-camera-20180222. Read_Me describes the data and associated issues to consider, software specific processing parameters are documented in supplied reports in docs/.
comment:27 Changed 7 years ago by wja
Photogrammetry Delivery
Delivery placed in FTP slot9 under 'orthomosaics' directory, notification sent to PI on 28/02/2018.
Unpacking
Project has been unpacked. There was no basestation data. Lidar data was placed in 2 different directories and have been joined in one; however, LiDAR failed and data is not usable for this flight season. There are 9 fenix flightlines and 9 owl lines.
Got an error in the scripts when running the checks. Will come back to this once solved.