Opened 5 years ago

Last modified 4 years ago

#656 new flight processing

HyTES/19, flight day 171b/2019, Grosseto

Reported by: wja Owned by:
Priority: immediate Milestone:
Component: Processing: general Keywords:
Cc: dac@… Other processors:

Description

Data location: /users/rsg/arsf/arsf_data/2019/flight_data/italy/HyTES19-2019_169_Grosseto

Data arrived from Kings College London via hardisk on July 15 2019.

Scientific objective: Joint NASA and ESA campaign flying JPL’s HyTES thermal instrument over sites in Europe with a focus on crops and soil. Aim is to inform the future Land Surface Temperature Monitoring (LSTM) satellite mission. The NCEO Fenix instrument was flown alongside HyTES to provide visible – SWIR hyperspectral data.

PI: Martin Wooster

Sensors:

Fenix (requested, flown)

Change History (17)

comment:1 Changed 5 years ago by wja

Navigation Processing
Basestation data converted to RINEX. Of the three RINEX files (which contain multiple days of data), a file for this date has been created with the following command:

teqc -st 2019_06_20:06:27:48.840 -e 2019_06_20:15:09:15.860 +nav Default_9488_2006_062748.19n Default_9488_0509_114526.m00 > Default_9488_2006_062748.19o

comment:2 Changed 5 years ago by wja

  • Cc dac@… added

Navigation Processing
SOL file produced using PPP processing.

comment:3 Changed 5 years ago by seg

Fenix Processing
Started processing.
GPS end time had to be changed for

  • FENIX171b-19-5.hdr

This was because the start time was the same as the end time. Minute was added to end time for these files to allow generation of config file

Last edited 5 years ago by seg (previous) (diff)

comment:4 Changed 5 years ago by seg

Logsheet Creation

Log Sheets generated, flight line plot not generated and no KML file either so there is no plot at the moment

comment:5 Changed 5 years ago by seg

Fenix Processing

SCT values identified

Flightline FENIX
1 3.40
2 46.10
3 3.80
4 3.70
5 24.3
6 57
7 69.00

comment:6 Changed 5 years ago by seg

Fenix Processing

Some small FPS issues with 1 line of the flight, might be passable

comment:7 Changed 5 years ago by wja

Hyperspectral Processing
Flightline 2 looks like it has a FPS error.

comment:8 Changed 5 years ago by wja

Hyperspectral Processing
All lines reprocessed with the following SCT values

LineSCT
12.40
244.94
32.80
42.70
523.30
656.00
768.00

Flightline 2 has been processed with a FPS of 92.580

Ready for checking

comment:9 Changed 5 years ago by asm

Fenix Delivery Check

Started.

comment:10 Changed 5 years ago by asm

Fenix Delivery Check

-No Readme file (please add the data quality remarks similar to previous deliveries)
-Removed fodis directory
-Updated data quality report
-xml files are correct
-Spectra looks good compared with 6S, just a bit low in the SWIR
-APL commands work just fine and show good SCT values and offsets.

Most of the checks have been done alreay, everything looking good with the exception of the readme file.

comment:11 Changed 5 years ago by wja

Hyperspectral Delivery
ReadMe added

comment:12 Changed 5 years ago by asm

Fenix Delivery Check

Readme and data qualirt remarks looking good. All other checks are correct, I will zip the mapped files and mark as ready to be delivered once done.

comment:13 Changed 5 years ago by asm

Fenix Delivery

All mapped files have been zipped correctly. Project is ready to be delivered.

comment:14 Changed 5 years ago by asm

Fenix Delivery

Project delivered, finalised and notification sent to PI on 5th November 2019.

comment:15 Changed 4 years ago by wja

Atmospheric correction
Atmospheric correction has been applied to create level2 and mapped data.

Delivered to PI on June 22nd 2020

Needs archiving at CEDA

comment:16 Changed 4 years ago by wja

Archiving
JSONs created, added to internal database.
Waiting for account with CEDA to be renewed in order to rsync

comment:17 Changed 4 years ago by wja

Archiving
Rsync to CEDA complete. Have sent an e-mail to ask for their confirmation that the data has been received.

Note: See TracTickets for help on using tickets.