Opened 3 years ago

Last modified 15 months ago

#685 new flight processing

Magic, flight day 235a/2021, Kiruna, Sweden

Reported by: wja Owned by:
Priority: immediate Milestone:
Component: Processing: general Keywords:
Cc: Other processors:

Description (last modified by wja)

Data location: /users/rsg/arsf/arsf_data/2021/flight_data/sweden/Magic-2021_235a_Kiruna/
Data arrived from Kings College London via hardrive from Sweden on September 20th 2021.

Scientific objective: International project (includes NASA, CNRS, ESA, DLR, Eumetsat) to monitor and identify methane inventories in the arctic. JPL's HyTES instrument was utilised. A total of three aircraft were used to collect data, along with deployed balloons and ground measurments.

PI: Martin Wooster

Change History (14)

comment:1 Changed 3 years ago by wja

Unpacking

run_unpacked_checks.py reports issues with nav times

comment:2 Changed 3 years ago by wja

  • Description modified (diff)

comment:3 Changed 3 years ago by wja

Navigation Processing

Navigation data for this flight is for the whole day. This includes flights 235a, 235b, 235c & 235d.

Single basestation method used. KIRU station downloaded from epncb.eu with the following:

lftp epncb.eu:/pub/
cd obs/2021/235
mirror --include-glob=KIRU* ./

RTX coordinates computed for KIRU:

  • Horizontal sigma: 0.004 m
  • Vertical sigma: 0.005 m

POSPac recommended cutting the following seconds from the begining and end of the flight (as the flight path goes over the KIRU station between data collection and take off / landing.

Current Start:	112733.000	Recommended Start:	113688.000
Current End:	126634.000	Recommended End:	125868.000

Horizontal RMSE generally below 3 cm. Start of flight and peaks up to 6 cm.
Vertical RMSE generally below 5 cm, several peaks up to 7 cm.

comment:4 Changed 3 years ago by wja

Hyperspectral Processing

All flightline processed with just 3 bands (RGB).

Data looks noisey.

comment:5 Changed 3 years ago by wja

Created Delivery

All bands processed. Delivery created.

comment:6 Changed 3 years ago by asm

Fenix DC

Started.
-No mosaic in Readme file
-No sensor files. Copied those to start running apl checks.

comment:7 Changed 3 years ago by asm

Fenix DC

There is a small offset between lines. It is minor but visible as there are not many features. Some lines do overlap better (7 and 8) and others is more obvious (5 and 6). This is likely due to the basestation and the DEM and I personally think it can be delivered but a note in the readme might be worth.

comment:8 Changed 3 years ago by asm

Fenix DC

-Very low signal and very noisy data (bining 2). The only bands with no underflows are between 70-225 (out of 594).
-Py6S: matching in the VNIR but much lower than expected. Clearly visible and nothing very usable in the SWIR.
-Please include note about noise and low ilumination in the readme

comment:9 Changed 2 years ago by wja

Delivery

Have added data quality note to the ReadMe.

comment:10 Changed 2 years ago by wja

Delivery

Finalised, put on FTP slot 5

comment:11 Changed 2 years ago by wja

Delivery Sent

PI notifified

comment:12 Changed 16 months ago by wja

Archiving

Created JSONs, committed them to database.

Ready to sync to CEDA.

comment:13 Changed 16 months ago by wja

Archiving

Started transfer to CEDA 14/09 16:00

comment:14 Changed 15 months ago by wja

Archiving

Transfer complete

Note: See TracTickets for help on using tickets.