Changes between Version 44 and Version 45 of Procedures/EndUserDelivery


Ignore:
Timestamp:
May 13, 2009, 12:51:52 PM (16 years ago)
Author:
mark1
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Procedures/EndUserDelivery

    v44 v45  
    6868   * Fill in the contents and change the line numbers as appropriate
    6969   * Enter the projection and datum details - get these from ALS PP output dialog when processing.
    70    * UK flights should be Horizontal datum: ETRS89 Vertical Datum: Newlyn Projection: OSTN02 British National Grid
     70     * UK flights should be Horizontal datum: ETRS89 Vertical Datum: Newlyn Projection: OSTN02 British National Grid
    7171   * Insert statistics for each line: `lasinfo --check <lidarfilename>` then cut/paste the required information
    7272   * Check the accuracy of data vs vectors and estimate the average offset, also the average elevation offset between neighbouring lines