    v44 v45  
    6868   * Fill in the contents and change the line numbers as appropriate
    6969   * Enter the projection and datum details - get these from ALS PP output dialog when processing.
    70    * UK flights should be Horizontal datum: ETRS89 Vertical Datum: Newlyn Projection: OSTN02 British National Grid
     70     * UK flights should be Horizontal datum: ETRS89 Vertical Datum: Newlyn Projection: OSTN02 British National Grid
    7171   * Insert statistics for each line: `lasinfo --check <lidarfilename>` then cut/paste the required information
    7272   * Check the accuracy of data vs vectors and estimate the average offset, also the average elevation offset between neighbouring lines