Changes between Version 44 and Version 45 of Procedures/EndUserDelivery
- Timestamp:
- May 13, 2009, 12:51:52 PM (15 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
Procedures/EndUserDelivery
v44 v45 68 68 * Fill in the contents and change the line numbers as appropriate 69 69 * Enter the projection and datum details - get these from ALS PP output dialog when processing. 70 * UK flights should be Horizontal datum: ETRS89 Vertical Datum: Newlyn Projection: OSTN02 British National Grid70 * UK flights should be Horizontal datum: ETRS89 Vertical Datum: Newlyn Projection: OSTN02 British National Grid 71 71 * Insert statistics for each line: `lasinfo --check <lidarfilename>` then cut/paste the required information 72 72 * Check the accuracy of data vs vectors and estimate the average offset, also the average elevation offset between neighbouring lines