Changes between Version 11 and Version 12 of Processing/CalibSite
- Timestamp:
- Feb 27, 2012, 2:34:06 PM (13 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
Processing/CalibSite
v11 v12 1 1 = Calibration Sites = 2 2 3 [[Image( survey.jpg, align=right, 400px, margin=20)]]3 [[Image(little_riss_points.png, align=right, 400px, margin=20)]] 4 4 5 5 == Little Rissington - September 2008 onwards== #LittleRiss … … 10 10 base station was set up in the grounds of the business park, specifically it was located south west of the 11 11 first hangar when you enter the business park. The hangar is in use as the premises of a removal firm. 12 This base station site is marked as B on Figure 1. It was collecting data for approximately 9 hours. 12 The base station was collecting data for approximately 9 hours. 13 13 14 Whilst the base station was in position collecting data, 64 additional points were surveyed; 63 of which 14 15 were on the airfield and 1 on the business park. Each point was surveyed using GPS for 5 minutes.