Changes between Version 11 and Version 12 of Processing/CalibSite


Ignore:
Timestamp:
Feb 27, 2012, 2:34:06 PM (13 years ago)
Author:
mark1
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Processing/CalibSite

    v11 v12  
    11= Calibration Sites =
    22
    3 [[Image(survey.jpg, align=right, 400px, margin=20)]]
     3[[Image(little_riss_points.png, align=right, 400px, margin=20)]]
    44
    55== Little Rissington - September 2008 onwards== #LittleRiss
     
    1010base station was set up in the grounds of the business park, specifically it was located south west of the
    1111first hangar when you enter the business park. The hangar is in use as the premises of a removal firm.
    12 This base station site is marked as B on Figure 1. It was collecting data for approximately 9 hours.
     12The base station was collecting data for approximately 9 hours.
     13
    1314Whilst the base station was in position collecting data, 64 additional points were surveyed; 63 of which
    1415were on the airfield and 1 on the business park. Each point was surveyed using GPS for 5 minutes.