Changes between Version 16 and Version 17 of Processing/CalibSite
- Timestamp:
- Apr 10, 2017, 5:51:15 PM (8 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
Processing/CalibSite
v16 v17 1 1 = Calibration Sites = 2 2 3 [[Image(little_riss_points.png, align=right, 400px, margin=20)]] 3 == Alconbury - 2017 onwards == #Alconbury 4 4 5 == Alconbury - 2017 onwards == #Alconbury 5 [[Image(alconbury_survey_points.png, align=right, 400px, margin=20)]] 6 6 7 7 The locations of ground control points surveyed at the site are in the following files: … … 10 10 * [attachment:alconbury_survey_july2016_wgs84.csv Alconbury survey points, CSV format, WGS84] 11 11 12 13 \\ 14 \\ 15 \\ 16 \\ 17 \\ 18 \\ 19 \\ 20 \\ 21 \\ 22 --------------- 23 12 24 == Little Rissington - September 2008 to October 2017== #LittleRiss 13 25 14 26 [[Image(little_riss_points.png, align=right, 400px, margin=20)]] 15 27 16 28 The survey site is at Little Rissington – an old MoD airfield and business park. For the survey, a GPS