Changes between Version 6 and Version 7 of Processing/LeverArmOffset
- Timestamp:
- Mar 6, 2009, 4:08:16 PM (16 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
Processing/LeverArmOffset
v6 v7 14 14 15 15 ---- 16 17 = 2009 = 18 19 Use 2008 for now but note that the instruments have moved! We need a re-survey or at least a measurement of the shift. 20 21 = 2008 = 22 16 23 18th Dec. 2008: Due to confusion about angle directions, the originally computed gamma angles are incorrect. The error caused should be of similar magnitude to the previous, similar error (ie ~1.5m along-track for ATM, other sensors will have a smaller error). Because the error will be partially compensated for by boresight angles depending on flight altitude, the "wrong" numbers should be used anyway unless you re-calculate the boresight angles. 17 24 18 Jan 2008 numbers (Wrong but use anyway ):25 Jan 2008 numbers (Wrong but use anyway, or we have to redo boresights): 19 26 || || Gam || Del || Dst || 20 27 || ATM || 1.2258 || 0.0051 || 1.7380 || … … 22 29 || Hawk || 0.9705 || -0.0049 || 1.7985 || 23 30 24 Jan 2008 numbers (Corrected for reference but use "wrong" numbers above ):31 Jan 2008 numbers (Corrected for reference but use "wrong" numbers above, unless you've redone boresights): 25 32 || || Gam || Del || Dst || 26 33 || ATM || 0.3450 || 0.0051 || 1.7380 || … … 28 35 || Hawk || 0.6003 || -0.0049 || 1.7985 || 29 36 30 ---- 31 2006 obs and results as follows: 37 ----------------- 38 == 2007 == 39 40 Use 2006 numbers.. 41 42 ----------------- 43 == 2006 == 44 45 Obs and results as follows: 32 46 33 47 {{{