Version 263 (modified by anch, 14 years ago) (diff)

--

Processing Order

This page gives the provisional order in which ARSF-DAN will process the data for each project (2009 data onwards). As standard we choose the order in which to process data first by project alpha grading and second by date flown, but we may make exceptions to this - names in italics have been moved from where they would be in the standard order. Please note that this order is subject to change without notice. If your project is not on this page, or it is but not all the sensors you expect are listed, then it is probably being processed, see the relevant project ticket for more information. If we are processing several flight days from the same project code close together in time then we may wait until processing for all flight days has been completed before dispatching data - please contact us if you would like us not to do this.

See also the Processing status page

Project code Flight day/year Site name Sensors Priority
EU10-03 229b/2010 Kis Balaton Hawk a5
EU10-03 232b/2010 Aimwetlab (Kis Balaton) Hawk a5
EU10-03 233a/2010 Lake Balaton (East, Area D) Hawk, a5
EU10-03 234a/2010 Lake Balaton (East, Area A) Hawk a5
EU10-03 234c/2010 Lake Balaton (East, Area A) Hawk a5
EU10-03 235a/2010 Lake Balaton (East, Area) Hawk a5
EU10-03 238a/2010 Lake Balaton (East, Area) Hyperspectral, Camera a5
EU10-03 238c/2010 Lake Balaton Peninsula Hyperspectral, Camera a5
UR10-01 258/2010 Iceland Hyperspectral, LiDAR, Camera a5
UR10-02 259a/2010 Iceland Hyperspectral, LiDAR, Camera a5
UR10-01 259b/2010 Iceland Hyperspectral, LiDAR, Camera a5
EUFAR10/03 197/2010 Lisbon Hyperspectral, LiDAR a4h
EUFAR10/02 199a/2010 Santander LiDAR a4h
EUFAR10/02 200/2010 Santander LiDAR, Hyperspectral a4h
EUFAR10/02 200/2010 Santander LiDAR, Hyperspectral a4h
EU10-03 229b/2010 Kis Balaton LiDAR a4h
EUFAR10-06 231a/2010 Armsrace Hyperspectral, LiDAR, Camera a4h
EU10-03 232b/2010 Aimwetlab (Kis Balaton) LiDAR a4h
EUFAR10-01 233b/2010 Lake Balaton Peninsula Hyperspectral, LiDAR, Camera a4h
EUFAR10-07 234b/2010 Summer School Geo Site Hyperspectral, LiDAR, Camera a4h
EUFAR10-07 234d/2010 Summer School Geo Site Hyperspectral, LiDAR, Camera a4h
EUFAR10-01 234e/2010 Lake Balaton Peninsula Hyperspectral, LiDAR, Camera a4h
EUFAR10-01 235b/2010 Lake Balaton Peninsula Hyperspectral, LiDAR, Camera a4h
EUFAR10-01 238b/2010 Lake Balaton Peninsula Hyperspectral, LiDAR, Camera a4h
EU10-03 238c/2010 Lake Balaton Peninsula LiDAR a4h
EUFAR10-01 238d/2010 Lake Balaton Peninsula Hyperspectral, LiDAR, Camera a4h
GB07/09 212a/2010 Alps Hyperspectral a4m
EU09/02 212b/2010 Alps Hyperspectral a4m
EU10-03 233a/2010 Lake Balaton (East, Area D) LiDAR a4m
EU10-03 234a/2010 Lake Balaton (East, Area A) LiDAR a4m
EU10-03 234c/2010 Lake Balaton (East, Area A) LiDAR a4m
EU10-03 235a/2010 Lake Balaton (East, Area) LiDAR a4m
EU10-03 238a/2010 Lake Balaton (East, Area) LiDAR a4m
EM10/07 145/2010 Trapani LiDAR, Hyperspectral a4l
CEH07/04 102a/2010 Hellifield Hyperspectral a4l-
CEH07/04 102b/2010 Moorhouse Hyperspectral a4l-
EM10/07 143/2010 Trapani LiDAR, Hyperspectral a4l-

Delivery checking

This list shows projects for which processing has been completed and they are awaiting final QC checking prior to delivery to the PI. When the project is removed from this list it is being checked and should be ready for dispatch shortly, unless problems are found during final QC. Note that because some sensors are processed separately for each flight, the fact that a project is on this list means only that at least one category of sensor has completed processing, not necessarily all that were flown.

Project code Flight day/year Site name Sensors Priority
EU10-03 229b/2010 Kis Balaton Camera a5
EU10-03 234c/2010 Lake Balaton (East, Area A) Camera a5