Changes between Version 34 and Version 35 of Status
- Timestamp:
- Apr 7, 2009, 4:31:02 PM (16 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
Status
v34 v35 4 4 5 5 Please contact Gary Llewellyn (Science / operations coordinator) if you have any questions or concerns: gaew@nerc.ac.uk (01865 374 391) 6 7 [[Image(Flier.jpg)]] 8 9 == 7th April 2009 == 10 ''A sever fault in the AISA Eagle and Hawk required that they be returned to Specim for repair. Meanwhile, the ARSF have been able to support an atmospheric project (GB09-01). The ASIS Eagle and Hawk are due to be returned in approximatelly one week after which they will require boresight flights. Collection of data in support of remote sensing projects should follow shortly afterwards.'' 11 12 6 13 == 23rd March 2009 == 7 14 ''On 19.03.09 the ARSF collected 'leaf-off' data in support of GB08-02 (Delamere Forest) and GB08-15 (Eaves Wood). An attempt was made to support GB09-05 (Leighton Moss) but an instrument problem and failing conditions caused us to question the quality of these data and a recollection is planned. In the hope of slightly better weather at the start of this week (compared to the middle and end of the week)we hope to support GB09-04 (Coed’y’Brenin) and return to GB09-05 (Leighton Moss). ''