Changes between Version 35 and Version 36 of Status


Ignore:
Timestamp:
Apr 14, 2009, 7:44:44 AM (16 years ago)
Author:
gaew
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Status

    v35 v36  
    88
    99== 7th April 2009 ==
    10 ''A sever fault in the AISA Eagle and Hawk required that they be returned to Specim for repair. Meanwhile, the ARSF have been able to support an atmospheric project (GB09-01). The ASIS Eagle and Hawk are due to be returned in approximatelly one week after which they will require boresight flights. Collection of data in support of remote sensing projects should follow shortly afterwards.''
     10''A severe fault in the AISA Eagle and Hawk required that they be returned to Specim for repair. Meanwhile, the ARSF have been able to support an atmospheric project (GB09-01). The ASIS Eagle and Hawk are due to be returned in approximatelly one week after which they will require boresight flights. Collection of data in support of remote sensing projects should follow shortly afterwards.''
    1111
    1212