Changes between Version 3 and Version 4 of Status
- Timestamp:
- Apr 24, 2008, 12:13:17 PM (17 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
Status
v3 v4 5 5 6 6 * [wiki:Status/Collection] 7 8 9 = Update of operational status for data collection = 10 11 == 22nd April 2008 == 12 ''Following the fitting of a loaned engine the NERC ARSF aircraft has resumed support for UK remote sensing. During the first two weeks in May data collection time will be shared between the support of UK remote sensing and participation in an International experiment in support of science (EUCAARI - NL08/01). The Cambridge LiDAR should be available in the NERC aircraft at the end of May, just after the aircraft is refitted with the repaired engine.'' 13 14 == 20th February 2008 == 15 ''Following 16 17 Please contact Gary Llewellyn (Science / operations coordinator) if you have any questions or concerns: gaew@nerc.ac.uk (01865 374 391)