Changes between Version 41 and Version 42 of Status


Ignore:
Timestamp:
Jul 22, 2009, 2:01:08 PM (15 years ago)
Author:
gaew
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Status

    v41 v42  
    66
    77[[Image(Flier.jpg)]]
     8
     9
     10
     11== 22nd July 2009 ==
     12'' Specim are at Gloucester Airport repairing the hyperspectral instruments, ARSF-Ops are flying short test flights and ARSF-DAN are on-site, checking the data as soon as it is off the aircraft. We hope to be collecting data in support of project before the end of the week. Although, conditions for the collection of data (from any of our sites) are poor the current weather forecast indicates better conditions (for some sites) on Saturday. Subject to this forecast being proved correct we hope to collect data in support of GB08-06 (Bleaklow and Black Hill), GB08-15 (Eaves Wood), GB09-05 (Leighton Moss) and possibly SOT09-01 (Harwood Forest) on Saturday.  ''
    813
    914== 16th July 2009 ==