#282 closed flight processing (fixed)
ET07/01, flight day 298/2009, Afar mid
Reported by: | benj | Owned by: | knpa |
---|---|---|---|
Priority: | alpha 5 | Milestone: | 2009 Data processing completion |
Component: | Archiving | Keywords: | |
Cc: | Other processors: | knpa |
Description (last modified by knpa)
Data location: ~arsf/arsf_data/2009/flight_data/ethiopia/ET07_01-2009_298_Afar_mid
Data arrived from ARSF via SATA disk Y on 4th Nov. 2009.
Scientific objective: /users/rsg/arsf/arsf_data/2008/ARSF_Applications/Ethiopia/ET07_01\ -\ Dr\ Wright.pdf
Priority: alpha-5
PI: Tim Wright
2009 Ethiopia campaign, reflown from 2007
Sensors:
- Eagle (09/02/10)
- Hawk (09/02/10)
- Leica LIDAR (09/02/10)
- RCD (09/02/10)
- TABI (to be processed by University of Athens)
Change History (31)
comment:1 Changed 15 years ago by benj
comment:2 Changed 15 years ago by mggr
- Description modified (diff)
Raw TABI data acquired, put in archive and offered to Athens for download and processing.
comment:3 Changed 15 years ago by mggr
LIDAR and webcam imagery disentangled. Unrelated LIDAR files removed.
comment:4 Changed 15 years ago by benj
- Owner set to benj
- Status changed from new to assigned
comment:5 Changed 15 years ago by benj
Eagle lines 4 and 9, hdr file recorded that there was only 1 line. Data itself appears OK, corrected number of lines in hdr file.
comment:6 Changed 15 years ago by knpa
LIDAR lines processed, QC underway.
comment:7 Changed 15 years ago by knpa
- Other processors set to knpa
comment:8 Changed 15 years ago by knpa
LIDAR processing complete, preparing delivery.
Having trouble with DEM creation.
comment:9 Changed 15 years ago by benj
Timing corrections for Eagle/Hawk. Note these are approximate because I've had to do them by comparison to the Lidar intensity image rather than by comparison to straight features in the E/H images themselves (since there aren't any).
Line | Eagle | Hawk |
1 | -0.05 | -0.05 |
2 | -0.05 | 0.00 |
3 | 0.07 | -0.04 |
4 | 0.00 | -0.04 |
5 | -0.05 | 0.05 |
6 | -0.10 | -0.02 |
7 | 0.00 | -0.01 |
8 | -0.01 | -0.05 |
9 | 0.00 | -0.10 |
10 | -0.07 | 0.00 |
11 | -0.03 | -0.10 |
comment:10 Changed 15 years ago by benj
Hyperspectral delivery is prepared and ready for delivery checking at ~airborne/workspace/ET07_01-2009_298_Afar_mid/delivery/20100202/ET07_01/
comment:11 Changed 15 years ago by mark1
Photographs 25025523100002G4.tif-25025523100006G4.tif have no time info in the logfile - times have been estimated from the sensorstat log to give approx nav/pos info for tagging.
comment:12 Changed 15 years ago by benj
Doing Lidar delivery check
comment:13 Changed 15 years ago by mark1
Photographs 25064951100001G4.tif to 25064951100069G4.tif have no time stamps in log file so processing them as if there was no logfile.
comment:14 Changed 15 years ago by benj
Lidar delivery looks fine, can be rsynced back and delivered.
comment:15 Changed 15 years ago by knpa
E+H delivery checked.
All bands look good apart from Hawk 233 (blank for all lines)
Unix2dos'd Readme.
Need to mention Eagle dropped scan lines in Readme.
Todo at some point: Readme should really clarify why there are sometimes HDF and Bil and the difference.
Todo at some point: Decided what to do about DEM - include a Readme to say may not be accurate?
comment:16 Changed 15 years ago by benj
Problem with last Hawk line being blank is a known issue (see #291).
Made remaining changes to readme.
comment:17 Changed 15 years ago by knpa
Repository full so skipping rsync for now, All sensors will need to be rsynced at a later date (will keep ticket open)
comment:18 Changed 15 years ago by knpa
All three projects copied on to external hard disk. Noticed some problems with the hyperspectral screenshots which need to be fixed before disk can be sent out.
comment:19 Changed 15 years ago by knpa
HYPERSPECTRAL, LIDAR AND PHOTOS DELIVERED TODAY (09/02/10)
Leaving this ticket open until rsynced.
comment:20 Changed 15 years ago by benj
Processed TABI data was received from Pol back in January but we weren't happy with the accuracy. This data is in the workspace, it has not been dispatched to the PI but is the only processed TABI data we currently have for this project.
comment:21 Changed 15 years ago by knpa
- Description modified (diff)
comment:22 Changed 14 years ago by knpa
r-synced lidar
comment:24 Changed 14 years ago by knpa
- Component changed from Processing: general to Archiving
- Owner changed from benj to knpa
Started archiving.
comment:25 Changed 14 years ago by knpa
Tarball complete and made available to NEODC.
comment:26 Changed 14 years ago by knpa
Downloaded and backed up by NEODC.
Moved to archive disk.
comment:27 Changed 14 years ago by knpa
- Resolution set to fixed
- Status changed from assigned to closed
Deleted workspace copy.
Closing ticket.
comment:28 Changed 8 years ago by asm
Archiving
Re-processed hyperspectral data has been archived and everythin is ready to be downloaded from CEDA. Will close this ticket.
comment:29 Changed 7 years ago by wja
New lidar delivery created with the addition of LAS files. ASCII and LAS files are now stored in 'flightlines' directory.
comment:30 Changed 7 years ago by wja
Updated table in Read_Me to include updated 'flightlines' directory structure along with inclusion of LAS files.
comment:31 Changed 7 years ago by wja
LAS path name (flightlines/las1.0/) changed to correct LAS format version (flightlines/las1.2). Read Me updated accordingly.
Raw GPS base station data is in ~arsf/arsf_data/2009/flight_data/ethiopia/basestations.