Opened 15 years ago
Last modified 8 years ago
#283 reopened flight processing
ET07/01, flight day 299/2009, Afar north
Reported by: | benj | Owned by: | knpa |
---|---|---|---|
Priority: | alpha 5 | Milestone: | 2009 Data processing completion |
Component: | Archiving | Keywords: | |
Cc: | Other processors: |
Description (last modified by knpa)
Data location: ~arsf/arsf_data/2009/flight_data/ethiopia/ET07_01-2009_299_Afar_north
Data arrived from ARSF via SATA disk Y on 4th Nov. 2009.
Scientific objective: /users/rsg/arsf/arsf_data/2008/ARSF_Applications/Ethiopia/ET07_01\ -\ Dr\ Wright.pdf
Priority: alpha-5
PI: Tim Wright
2009 Ethiopia campaign, reflown from 2007
Sensors:
- Eagle (23/04/10)
- Hawk (23/04/10)
- Leica LIDAR (19/04/10)
- Photography (23/04/10)
- TABI (to be processed by University of Athens)
Change History (27)
comment:1 Changed 15 years ago by benj
- Description modified (diff)
comment:2 Changed 15 years ago by benj
comment:3 Changed 15 years ago by mggr
- Description modified (diff)
Raw TABI data acquired, put in archive and offered to Athens for download and processing.
comment:4 Changed 15 years ago by knpa
- Owner set to knpa
- Status changed from new to accepted
comment:5 Changed 15 years ago by mark1
No GPS time in event log file for photograph images:
25222049100005G3.raw
25222049100006G3.raw
Times have been estimated from SensorStat file
comment:6 Changed 15 years ago by mark1
- Description modified (diff)
comment:7 Changed 15 years ago by knpa
LIDAR processed and QCd.
Needs to be classified and can then be delivered.
Passing on to harg to continue.
comment:8 Changed 15 years ago by knpa
- Owner changed from knpa to harg
- Status changed from accepted to assigned
comment:9 Changed 15 years ago by knpa
Pitch offset changed during QC to -0.00058
comment:10 Changed 15 years ago by mark1
Digital photography is ready to be delivered
comment:11 Changed 15 years ago by chrfi
hawk data for flight line 1 is not present on thelma or our systems.
comment:12 Changed 15 years ago by emca
LIDAR data processing complete, delivery directory created at
~airborne/workspace/ET07_01-2009_299_Afar_north/delivery/20100415/ET07_01
Delivery checked by mark1 16/04/2010
Data dispatched to PI 19/04/2010
comment:13 Changed 15 years ago by knpa
Hyperspectral Delivery Checked
All is fine apart from following:
Need to mention eagle dropped scan lines in Readme
Need to mention clouds on a couple of flightlines (e.g. h24, e16, e18, e22, e23, e24, e25)
Can't open eagle mosaic jpeg (with eog)
bin dir not mentioned in contents
wonky | on line 227
In contents should say line name, not number e.g. Pol1, not 01.
"indicatethe accuracy" - line 277
need to unix2dox Readme
Need to mention blank 232 band in all hawk flight lines
Ready to deliver when these changes are made.
comment:14 Changed 15 years ago by chrfi
hyperspectral time offsets
line number | eagle | hawk |
1 | 0.06 | n/a |
2 | -0.02 | -0.04 |
3 | 0.07 | -0.02 |
4 | -0.02 | 0.02 |
5 | 0.00 | 0.01 |
6 | -0.05 | -0.05 |
7 | -0.01 | 0.00 |
8 | 0.01 | -0.02 |
9 | -0.02 | -0.06 |
10 | -0.05 | -0.08 |
11 | 0.03 | 0.00 |
12 | 0.02 | -0.02 |
13 | 0.00 | -0.04 |
14 | 0.00 | -0.04 |
15 | 0.00 | 0.00 |
16 | 0.02 | -0.02 |
17 | 0.00 | 0.00 |
18 | -0.01 | -0.06 |
19 | 0.00 | -0.04 |
20 | 0.35 | 0.7 |
21 | -0.02 | 0.02 |
22 | -0.03 | -0.02 |
23 | 0.04 | -0.01 |
24 | -0.03 | -0.01 |
25 | 0.00 | -0.04 |
comment:15 Changed 15 years ago by chrfi
dispatched 04/23/2010
comment:16 Changed 15 years ago by benj
Processed TABI data was received from Pol back in January but we weren't happy with the accuracy. This data is in the workspace, it has not been dispatched to the PI but is the only processed TABI data we currently have for this project.
comment:17 Changed 14 years ago by knpa
- Description modified (diff)
Photography data too!
Also added delivery dates from processing spreadsheet.
comment:18 Changed 14 years ago by knpa
- Owner changed from harg to knpa
r-synced all sensors.
Beginning archiving.
comment:19 Changed 14 years ago by knpa
Found raw data for hawk line 1, it was misnamed 'SWIRdataCube' (there is already the normal dataCube.raw present).
Holding archiving whilst I process and stick on ftp for PI.
comment:20 Changed 14 years ago by knpa
fps has already been changed from 60 to 30 for all hawk header files due to to frame dropping issue. Have changed for line 1 also.
comment:21 Changed 14 years ago by knpa
hawk line 1 sct: -0.01
comment:22 Changed 14 years ago by knpa
Made line available to PI on ftp 20/08/10
comment:23 Changed 14 years ago by knpa
Archiving preparation complete.
Tarball created and ready for download by NEODC.
comment:24 Changed 14 years ago by knpa
Tarball has been downloaded and the data backed-up by NEODC.
Project has been moved from repository to archive disk.
comment:25 Changed 14 years ago by knpa
- Resolution set to fixed
- Status changed from assigned to closed
Deleted workspace copy.
Closing ticket.
comment:26 Changed 13 years ago by mark1
- Component changed from Processing: general to Archiving
- Resolution fixed deleted
- Status changed from closed to reopened
Eagle and Hawk line 20 re-delivered in both az and apl formats. (Put up on FTP 1st July 2011). Ticket re-opened as these will need to be archived.
comment:27 Changed 8 years ago by asm
Archiving
Re-processed hyperspectral data has been archived and everythin is ready to be downloaded from CEDA. Will close this ticket.
Raw GPS base station data is in ~arsf/arsf_data/2009/flight_data/ethiopia/basestations.