Opened 15 years ago
Last modified 7 years ago
#284 closed flight processing
ET07/01, flight day 300a/2009, Afar north — at Version 12
Reported by: | benj | Owned by: | emca |
---|---|---|---|
Priority: | alpha 5 | Milestone: | 2009 Data processing completion |
Component: | Archiving | Keywords: | |
Cc: | Other processors: |
Description (last modified by mark1)
Data location: ~arsf/arsf_data/2009/flight_data/ethiopia/ET07_01-2009_300a_Afar_north
Data arrived from ARSF via SATA disk Y on 4th Nov. 2009.
Scientific objective: /users/rsg/arsf/arsf_data/2008/ARSF_Applications/Ethiopia/ET07_01\ -\ Dr\ Wright.pdf
Priority: alpha-5
PI: Tim Wright
2009 Ethiopia campaign, reflown from 2007
Sensors:
- Eagle (26/02/2010)
- Hawk (26/02/2010)
- Leica LIDAR (26/02/2010)
- TABI (to be processed by University of Athens)
Change History (12)
comment:1 Changed 15 years ago by benj
- Description modified (diff)
comment:2 Changed 15 years ago by benj
- Description modified (diff)
Raw GPS base station data is in ~arsf/arsf_data/2009/flight_data/ethiopia/basestations.
comment:3 Changed 15 years ago by mggr
- Description modified (diff)
Raw TABI data acquired, put in archive and offered to Athens for download and processing.
comment:4 Changed 15 years ago by emca
- Owner set to emca
- Status changed from new to assigned
comment:5 Changed 15 years ago by mark1
Photograph delivery directory created. Photos 1-113 tagged by IPAS SOL file, 114-330 tagged using log file (since IPAS or LIDAR failed mid flight).
comment:6 Changed 15 years ago by mark1
Photographs checked and ready to deliver.
comment:7 Changed 15 years ago by emca
LIDAR processing is complete and ready for delivery checking at
~airborne/workspace/ET07_01-2009_300a_Afar_north/delivery/20100128
comment:8 Changed 15 years ago by emca
Eagle and Hawk SCT offsets per line
Line | Eagle | Hawk |
1 | -0.01 | -0.07 |
2 | +0.03 | +0.01 |
3 | -0.03 | -0.02 |
4 | +0.04 | 0.00 |
comment:9 Changed 15 years ago by emca
Hyperspectral processing complete and ready for delivery checking at
~airborne/workspace/ET07_01-2009_300a_Afar_north/delivery/20100215
comment:10 Changed 15 years ago by mark1
LIDAR delivery checked and all looks OK.
comment:11 Changed 15 years ago by mark1
Hyperspectral data delivery checked. Example commands tested with dem and work OK, all level 1 files checked and look good. Minor edits made to read-me file.
comment:12 Changed 15 years ago by mark1
- Description modified (diff)
Eagle, Hawk and LIDAR data delivered to PI on 26/02/2010
The aircraft had an engine power-loss on landing, which meant the equipment got powered-down prematurely. This resulted in some of the Lidar data being corrupted. The affected data was re-flown on day 301.
Also, when I checked it in Ethiopia there was some corruption of the Applanix data (something bad in dcalm.005 I think it was). However, the Applanix data from flight 300b seems to also contain the data from 300a, so if there is a problem with the Applanix data from this flight then use the data from 300b.