Opened 14 years ago

Last modified 6 years ago

#284 closed flight processing

ET07/01, flight day 300a/2009, Afar north — at Version 12

Reported by: benj Owned by: emca
Priority: alpha 5 Milestone: 2009 Data processing completion
Component: Archiving Keywords:
Cc: Other processors:

Description (last modified by mark1)

Data location: ~arsf/arsf_data/2009/flight_data/ethiopia/ET07_01-2009_300a_Afar_north

Data arrived from ARSF via SATA disk Y on 4th Nov. 2009.

Scientific objective: /users/rsg/arsf/arsf_data/2008/ARSF_Applications/Ethiopia/ET07_01\ -\ Dr\ Wright.pdf

Priority: alpha-5

PI: Tim Wright

2009 Ethiopia campaign, reflown from 2007

Sensors:

  • Eagle (26/02/2010)
  • Hawk (26/02/2010)
  • Leica LIDAR (26/02/2010)
  • TABI (to be processed by University of Athens)

Change History (12)

comment:1 Changed 14 years ago by benj

  • Description modified (diff)

The aircraft had an engine power-loss on landing, which meant the equipment got powered-down prematurely. This resulted in some of the Lidar data being corrupted. The affected data was re-flown on day 301.

Also, when I checked it in Ethiopia there was some corruption of the Applanix data (something bad in dcalm.005 I think it was). However, the Applanix data from flight 300b seems to also contain the data from 300a, so if there is a problem with the Applanix data from this flight then use the data from 300b.

comment:2 Changed 14 years ago by benj

  • Description modified (diff)

Raw GPS base station data is in ~arsf/arsf_data/2009/flight_data/ethiopia/basestations.

comment:3 Changed 14 years ago by mggr

  • Description modified (diff)

Raw TABI data acquired, put in archive and offered to Athens for download and processing.

comment:4 Changed 14 years ago by emca

  • Owner set to emca
  • Status changed from new to assigned

comment:5 Changed 14 years ago by mark1

Photograph delivery directory created. Photos 1-113 tagged by IPAS SOL file, 114-330 tagged using log file (since IPAS or LIDAR failed mid flight).

comment:6 Changed 14 years ago by mark1

Photographs checked and ready to deliver.

comment:7 Changed 14 years ago by emca

LIDAR processing is complete and ready for delivery checking at
~airborne/workspace/ET07_01-2009_300a_Afar_north/delivery/20100128

comment:8 Changed 14 years ago by emca

Eagle and Hawk SCT offsets per line

Line Eagle Hawk
1-0.01 -0.07
2+0.03 +0.01
3-0.03 -0.02
4+0.04 0.00

comment:9 Changed 14 years ago by emca

Hyperspectral processing complete and ready for delivery checking at
~airborne/workspace/ET07_01-2009_300a_Afar_north/delivery/20100215

comment:10 Changed 14 years ago by mark1

LIDAR delivery checked and all looks OK.

comment:11 Changed 14 years ago by mark1

Hyperspectral data delivery checked. Example commands tested with dem and work OK, all level 1 files checked and look good. Minor edits made to read-me file.

comment:12 Changed 14 years ago by mark1

  • Description modified (diff)

Eagle, Hawk and LIDAR data delivered to PI on 26/02/2010

Note: See TracTickets for help on using tickets.