#29 closed flight processing (fixed)
GB2007/07, flight day 102a/2007, Inverclyde
Reported by: | mggr | Owned by: | benj |
---|---|---|---|
Priority: | alpha 4 high | Milestone: | 2007 data processing completion |
Component: | Processing: general | Keywords: | |
Cc: | sbg | Other processors: |
Description (last modified by mggr)
Data location: ~arsf/arsf_data/in_progress/2007/flight_data/uk/GB2007_07-2007_102a_Inverclyde
Data arrived from ARSF via second SATA disk transfer at the start of Sept.
Scientific details:
- Hyperspectral monitoring of heather uplands
- ~/arsf_data/in_progress/2007/ARSF_Applications-GB_2007/GB07-07_Application_and_science_case.pdf
Related tickets: #52
Sensors
- Eagle (delivered 12/Mar/08)
- Hawk (delivered 30/Apr/08)
Notes
Alasdair Mac Arthur (PI is Tim Malthus, but Alasdair is the person doing the work) has volunteered to be the 2007 Specim guinea pig.
There are several flights in this project, see: #52
Change History (24)
comment:1 Changed 17 years ago by mggr
- Status changed from new to assigned
comment:2 Changed 17 years ago by mggr
Got radiometric now, downloading boresight calibration.
comment:3 Changed 17 years ago by mggr
- Cc amro removed
- Priority changed from medium to immediate
Boresight calibration is now (mostly) understood. Begun processing of this data, though will need to do another boresight prior to delivery.
Alasdair would like the data before the end of Sept to meet an evaluation license he has for some atmospheric correction software. Going to hurry this one.
comment:4 Changed 17 years ago by mggr
Processed most files (though boresight lacking). Problem with line 1 - seems like the nav file might be corrupt. Asked Bill for advice.
comment:5 Changed 17 years ago by mggr
Delivered (via FTP) some time-corrected imagery. Boresight correction remains to be done.
Apparently the site was also flown over on 10th July 2007 and 29th August 2007.
comment:6 Changed 17 years ago by mggr
- Component changed from Support to Processing: general
- Description modified (diff)
- Priority changed from immediate to medium
- Summary changed from Support: 15/June/2007, Alasdair Mac Arthur, GB2007/07 to GB2007/07, flight day 102a/2007, Inverclyde
Changing this to a normal processing ticket now we have an established standard.
Waiting for Alasdair to look at the data.
comment:7 Changed 17 years ago by mggr
- Description modified (diff)
- Type changed from support to flight processing
Typo fix in description.
comment:8 Changed 17 years ago by mggr
Alasdair seems to be happy with the data so far. Once we have boresight numbers confirmed, we can send them to him (or resend the data with corrections) and close this ticket.
comment:9 Changed 17 years ago by mggr
This flight has binning {4,2} (2 spatial) - may be affected by a calibration issue.
comment:10 Changed 17 years ago by anee
- Owner changed from mggr to benj
- Status changed from assigned to new
Processed Eagle and Hawk data located in: /users/rsg/anee/scratch_space/GB2007_07-2007_102a_Inverclyde
Delivery directory created and filled.
comment:11 Changed 17 years ago by anee
data checked by benj
synced to ~/arsf_data/in_progress/2007/flight_data/uk/GB2007_07-2007_191a_Inverclyde/delivery/20080303/GB07-07
comment:12 Changed 17 years ago by anee
- Owner changed from benj to anee
comment:13 Changed 17 years ago by anee
synced to
/users/rsg/arsf/arsf_data/in_progress/2007/flight_data/uk/GB2007_07-2007_102a_Inverclyde/delivery/20080229/GB07-07
comment:14 Changed 17 years ago by anee
Eagle data sent to Dr. Malthus
comment:15 Changed 17 years ago by anee
- Owner changed from anee to benj
Processed Hawk data located in: /users/rsg/anee/scratch_space/GB2007_07-2007_102a_Inverclyde
(20080414)
Delivery directory created.
comment:16 Changed 17 years ago by benj
- Owner changed from benj to anee
Some small updates to the readme, otherwise ready to go. Rsynced to ~arsf/arsf_data/in_progress/2007/flight_data/uk/GB2007_07-2007_102a_Inverclyde.
comment:17 Changed 17 years ago by mggr
Prepared for archiving (DTG, NEODC) - moved to ~arsf/arsf_data/complete-ready_to_archive/
comment:18 Changed 17 years ago by mggr
- Description modified (diff)
comment:19 Changed 16 years ago by anee
- Owner changed from anee to mggr
comment:20 Changed 16 years ago by benj
- Owner changed from mggr to mark1
Eagle and Hawk originally delivered using wrong boresight values. Re-delivering to fix this. New delivery directory created at ~benj/scratch/GB2007_07-2007_102a_Inverclyde/delivery/20081009/GB07-07/
No screenshots included with the delivery - needs to be delivered quickly and the PI has seen the previous data anyway.
comment:21 Changed 16 years ago by mark1
- Owner changed from mark1 to benj
Delivery has been checked and looks ok. Example commands tested without dem.
Data has been rsynced over to ~arsf/arsf_data/in_progress/2007/flight_data/uk/GB2007_07-2007_102a_Inverclyde
comment:22 Changed 16 years ago by benj
- Resolution set to fixed
- Status changed from new to closed
Check was fine, re-delivered via FTP on 09/10/08 (but forgot to update/close ticket).
comment:23 Changed 16 years ago by mggr
Data sent to NEODC for archiving.
comment:24 Changed 15 years ago by mggr
Archived at NEODC.
We're waiting on copies of the radiometric and boresight calibration (day 061) before we can begin processing. I've told him the status today and said we'll get back to him when we're able to start processing.