Opened 17 years ago
Last modified 15 years ago
#29 closed flight processing
GB2007/07, flight day 102a/2007, Inverclyde — at Version 7
Reported by: | mggr | Owned by: | mggr |
---|---|---|---|
Priority: | alpha 4 high | Milestone: | 2007 data processing completion |
Component: | Processing: general | Keywords: | |
Cc: | sbg | Other processors: |
Description (last modified by mggr)
Data location: ~arsf/arsf_data/in_progress/2007/flight_data/uk/GB2007_07-2007_102a_Inverclyde
Data arrived from ARSF via second SATA disk transfer at the start of Sept.
Scientific details:
- Hyperspectral monitoring of heather uplands
- ~/arsf_data/in_progress/2007/ARSF_Applications-GB_2007/GB07-07_Application_and_science_case.pdf
Related tickets: #52
Notes
Alasdair Mac Arthur (PI is Tim Malthus, but Alasdair is the person doing the work) has volunteered to be the 2007 Specim guinea pig.
There are several flights in this project, see: #52
Change History (7)
comment:1 Changed 17 years ago by mggr
- Status changed from new to assigned
comment:2 Changed 17 years ago by mggr
Got radiometric now, downloading boresight calibration.
comment:3 Changed 17 years ago by mggr
- Cc amro removed
- Priority changed from medium to immediate
Boresight calibration is now (mostly) understood. Begun processing of this data, though will need to do another boresight prior to delivery.
Alasdair would like the data before the end of Sept to meet an evaluation license he has for some atmospheric correction software. Going to hurry this one.
comment:4 Changed 17 years ago by mggr
Processed most files (though boresight lacking). Problem with line 1 - seems like the nav file might be corrupt. Asked Bill for advice.
comment:5 Changed 17 years ago by mggr
Delivered (via FTP) some time-corrected imagery. Boresight correction remains to be done.
Apparently the site was also flown over on 10th July 2007 and 29th August 2007.
comment:6 Changed 17 years ago by mggr
- Component changed from Support to Processing: general
- Description modified (diff)
- Priority changed from immediate to medium
- Summary changed from Support: 15/June/2007, Alasdair Mac Arthur, GB2007/07 to GB2007/07, flight day 102a/2007, Inverclyde
Changing this to a normal processing ticket now we have an established standard.
Waiting for Alasdair to look at the data.
comment:7 Changed 17 years ago by mggr
- Description modified (diff)
- Type changed from support to flight processing
Typo fix in description.
We're waiting on copies of the radiometric and boresight calibration (day 061) before we can begin processing. I've told him the status today and said we'll get back to him when we're able to start processing.