Data location: ~arsf/arsf_data/2010/flight_data/western_europe/EUFAR10_02-2010_200_Santander

Data arrived from ARSF via network transfer on 26/07/2010.

Scientific objectives:

1 Development of a reliable tool to estimate coastal water quality indicators by using remote sensing techniques, both airborne and satellite.

1.1. Development of a set of semi-empirical algorithms based on hyperspectral airborne and in-situ data for estimating the concentrations of the water constituents;
1.2. Migration of the developed algorithms into the satellite workflow.

  1. Implementation of an automatic warning system based on satellite imagery processing;
  1. Inclusion of the information obtained by means of remote sensing in the dataset used for the calibration of regional hydrodynamic models.

Priority: a4m - awaiting confirmation

PI: Castillo-Lopez

Sensors: ¶

  • Eagle (21/12/2010)
  • Hawk (Requested by PI)
  • Leica LIDAR (21/12/2010)
  • RCD Digital Photography (21/12/2010)

Change History (26)

comment:1 Changed 14 years ago by jb362

Awaiting logsheet

comment:2 Changed 14 years ago by jb362

  • Priority changed from immediate to alpha 4 high

comment:3 Changed 14 years ago by ella

  • Description modified (diff)
  • Owner set to ella
  • Status changed from new to accepted

comment:4 Changed 14 years ago by ella

Beginning navigation processing

comment:5 Changed 14 years ago by anch

Starting Applanix (and probably IPAS) processing for this project.

comment:6 Changed 14 years ago by anch

  • Owner changed from ella to anch

comment:7 Changed 14 years ago by iopa

  • Description modified (diff)

Taking camera.

comment:8 Changed 14 years ago by emca

  • Other processors set to emca

Starting LiDAR processing

comment:9 Changed 14 years ago by emca

  • Other processors emca deleted

There is a problem with the IPAS for this project. Moving on to a different project until this can be resolved.

comment:10 Changed 14 years ago by jb362

There is also a problem with the applanix for this project which I do not know how to resolve. Because there is no IPAS .sol file or applanix .sbet file, none of the camera, Lidar, or hyperspectral data can be processed at present.

comment:11 Changed 13 years ago by knpa

  • Description modified (diff)

Data moved from overflow to repository.
Can now be r-synced.

comment:12 Changed 13 years ago by benj

Have downloaded 1s RINEX data from University of Cantabria and copied to repository. Relevant section of email from PI was as follows:

SANTANDER and TORRELAVEGA stations are in relation with the calibration site "Santander1" and the LAREDO station for the area of validation (Santander 2). Santander 1 data taken on 18th July and Santander2  data taken on 19th July.
In the corresponding tabs appear links to download RINEX data.
 
LINKS of interest:
 
http://www.gnss.unican.es/estaciones/cant.asp
 
http://www.gnss.unican.es/estaciones/trvg.asp
 
http://www.gnss.unican.es/estaciones/lare.asp
 
ftp://ftpgnss.digteg.unican.es/rinex
 
Access to real time corrections using the standard protocol NTRIP (Networked Transport of RTCM vía Internet Protocol):
 
URL 	http://ntrip.unican.es:2101/	 
IP:    	193.144.202.127	 
Port: 	21 
User: 	anonimous
 
link: http://www.gnss.unican.es/servicios/services.asp

comment:13 Changed 13 years ago by benj

Note I believe the Santander station mentioned with code CANT is the data I have downloaded from REIN. This is because if you go to the first link given the title of the web page is "Estación de Reinosa"

comment:14 Changed 13 years ago by knpa

Appears to be an issue with the bandset labels in the header files; they start at 900nm which is lower than it should be. Possibly incorrect bandset selected or none specified. Will leave this until end of the year and new Hawk calibration.

comment:15 Changed 13 years ago by iopa

Applanix and IPAS have been completed.

comment:16 Changed 13 years ago by iopa

Camera is ready to be checked.

Test images were images 1-8.

On a different note; eagle/hawk files were named 200a for no apparent reason, the logsheet too does not have a flight letter, so they were renamed with the 'a' removed.

comment:17 Changed 13 years ago by emca

  • Other processors set to emca

Starting LiDAR and Eagle

comment:18 Changed 13 years ago by benj

  • Description modified (diff)

comment:19 Changed 13 years ago by emca

Eagle data is ready for delivery check at
~airborne/workspace/EUFAR10_02-2010_200_Santander/delivery/20101125/

comment:20 Changed 13 years ago by emca

Delivery checked the camera data at
~airborne/workspace/EUFAR10_02-2010_200_Santander/delivery/20101109

Data is good, ready to deliver.

comment:21 Changed 13 years ago by emca

LiDAR data is ready for delivery check at
~airborne/workspace/EUFAR10_02-2010_200_Santander/delivery/20101126

comment:22 Changed 13 years ago by emca

SCT (and GPT) offsets for Eagle data:

Line Number SCT (GPT)
01 +0.03
02 0.00
03 -0.10 (-0.10)
04 0.00
05 0.00
06 -0.02
07 -0.12 (-0.08)
08 +0.03
09 +0.02
10 -0.08 (-0.12)
11 -0.01
12 +0.37

Notes on Eagle processing:

Line 05 had an incorrect GPS stop time in the raw header file so this was changed (original file kept as .hdr-original)
Line 08 had a bend in it so processed using -l 0 10100 in azspec (excluding the last ~400)
Line 12 had no sync information

comment:23 Changed 13 years ago by knpa

Delivery Checking LiDAR

comment:24 Changed 13 years ago by knpa

Delivery check complete.

All looks good and ready to deliver apart from:

  • EUFAR10_02-2010_200.dem should be EUFAR10_02-2010-200.dem
  • Low min Z values (~250m), is this due to water?
  • Readme says DEM resolution is 2m, actually 5m.

comment:25 Changed 13 years ago by benj

  • Summary changed from EUFAR10/01, 200/2010, Santander to EUFAR10/02, 200/2010, Santander

Fixed project ID in ticket (was down as EUFAR10/01)

comment:26 Changed 13 years ago by anch

  • Description modified (diff)

Eagle, Camera, and LiDAR all delivered 21/12/2010