Opened 14 years ago

Last modified 8 years ago

#352 accepted flight processing

GB07/09, Flight day 212a/2010, Alps — at Version 16

Reported by: ella Owned by: emca
Priority: alpha 4 medium Milestone: 2010 data processing completion
Component: Archiving Keywords:
Cc: Other processors:

Description (last modified by emca)

Data location: ~arsf/arsf_data/2010/flight_data/archive-overflow/GB07_09-2010_212a_Alps
Project has been fast copied to ~arsf/workspace.

Data arrived from ARSF via network transfer on 9th August 2010.

Scientific objective: Remote sensing support for research into the processes and rates of supraglacial debris cover formation on alpine glaciers, and on the response of glaciers to increases in supraglacial mass loading.

Priority: a4

PI:Benjamin Brock (and Martin Kirkbridge)
PLEASE NOTE:This project has a dual PI and we should cc Matin Kirkbridge on all emails. Data delivery should also be offered to Martin Kirkbridge, too.

Sensors:

  • Eagle
  • Hawk
  • Leica LIDAR (20/09/10)
  • RCD Camera (16/09/10)

Change History (16)

comment:1 Changed 14 years ago by ella

  • Description modified (diff)

comment:2 Changed 14 years ago by ella

  • Description modified (diff)

comment:3 Changed 14 years ago by ella

  • Description modified (diff)

comment:4 Changed 14 years ago by jb362

Starting hyperspectral processing.

comment:5 Changed 14 years ago by jb362

I'm leaving the hyperspectral processing until we have processed the LiDAR for this project since the SRTM dem is useless in such steep terrain.

comment:6 Changed 14 years ago by ella

IPAS navigation now processed.
[Applanix already completed by jb362]

comment:7 Changed 14 years ago by emca

  • Owner set to emca
  • Status changed from new to accepted

Starting LiDAR processing

comment:8 Changed 14 years ago by iopa

Starting camera check.

comment:9 Changed 14 years ago by iopa

Camera check:

1) delete camera delivery log from photographs dir
2) exiftool sample run has used the camera_delivery.log in the readme, readme needs re-creating

All else seems correct.

Note: readme front page contains both the name of the PI as given in the application and the name of collaborator 2 who was entered as the PI in the logsheet.

comment:10 Changed 14 years ago by jb362

Camera ready for delivery.

comment:11 Changed 14 years ago by jb362

Iopa will be delivering this for me since I'm leaving.

comment:12 Changed 14 years ago by emca

LiDAR data ready for delivery check at
~airborne/workspace/GB07_09-2010_212a_Alps/delivery/20100910/GB07_09

comment:13 Changed 14 years ago by iopa

  • Description modified (diff)

RCD camera was dispatched today, 16th September 2010.

comment:14 Changed 14 years ago by iopa

Delivery checking LiDAR

comment:15 Changed 14 years ago by iopa

Delivery check report;

All is good and ready to deliver.

comment:16 Changed 14 years ago by emca

  • Description modified (diff)

LiDAR data sent 20/09/2010

Note: See TracTickets for help on using tickets.