Opened 14 years ago
Last modified 8 years ago
#352 accepted flight processing
GB07/09, Flight day 212a/2010, Alps — at Version 19
Reported by: | ella | Owned by: | emca |
---|---|---|---|
Priority: | alpha 4 medium | Milestone: | 2010 data processing completion |
Component: | Archiving | Keywords: | |
Cc: | Other processors: |
Description (last modified by benj)
Data location: ~arsf/arsf_data/2010/flight_data/archive-overflow/GB07_09-2010_212a_Alps
Project has been fast copied to ~arsf/workspace.
Data arrived from ARSF via network transfer on 9th August 2010.
Scientific objective: Remote sensing support for research into the processes and rates of supraglacial debris cover formation on alpine glaciers, and on the response of glaciers to increases in supraglacial mass loading.
Priority: a4
PI:Benjamin Brock (and Martin Kirkbridge)
PLEASE NOTE:This project has a dual PI and we should cc Matin Kirkbridge on all emails. Data delivery should also be offered to Martin Kirkbridge, too.
Sensors:
- Eagle (Requested by PI)
- Hawk (Requested by PI)
- Leica LIDAR (20/09/10)
- RCD Camera (16/09/10)
Change History (19)
comment:1 Changed 14 years ago by ella
- Description modified (diff)
comment:2 Changed 14 years ago by ella
- Description modified (diff)
comment:3 Changed 14 years ago by ella
- Description modified (diff)
comment:4 Changed 14 years ago by jb362
comment:5 Changed 14 years ago by jb362
I'm leaving the hyperspectral processing until we have processed the LiDAR for this project since the SRTM dem is useless in such steep terrain.
comment:6 Changed 14 years ago by ella
IPAS navigation now processed.
[Applanix already completed by jb362]
comment:7 Changed 14 years ago by emca
- Owner set to emca
- Status changed from new to accepted
Starting LiDAR processing
comment:8 Changed 14 years ago by iopa
Starting camera check.
comment:9 Changed 14 years ago by iopa
Camera check:
1) delete camera delivery log from photographs dir
2) exiftool sample run has used the camera_delivery.log in the readme, readme needs re-creating
All else seems correct.
Note: readme front page contains both the name of the PI as given in the application and the name of collaborator 2 who was entered as the PI in the logsheet.
comment:10 Changed 14 years ago by jb362
Camera ready for delivery.
comment:11 Changed 14 years ago by jb362
Iopa will be delivering this for me since I'm leaving.
comment:12 Changed 14 years ago by emca
LiDAR data ready for delivery check at
~airborne/workspace/GB07_09-2010_212a_Alps/delivery/20100910/GB07_09
comment:13 Changed 14 years ago by iopa
- Description modified (diff)
RCD camera was dispatched today, 16th September 2010.
comment:14 Changed 14 years ago by iopa
Delivery checking LiDAR
comment:15 Changed 14 years ago by iopa
Delivery check report;
All is good and ready to deliver.
comment:17 Changed 14 years ago by emca
- Status changed from accepted to assigned
LiDAR and Camera data have been rsync'd to
~arsf/arsf_data/2010/flight_data/western_europe/GB07_09-2010_212a_Alps
comment:18 Changed 14 years ago by knpa
Appears to be an issue with the bandset labels in the header files; they start at 900nm which is lower than it should be. Possibly incorrect bandset selected or none specified. Will leave this until end of the year and new Hawk calibration.
comment:19 Changed 14 years ago by benj
- Description modified (diff)
Starting hyperspectral processing.