Opened 14 years ago

Last modified 6 years ago

#376 assigned flight processing

UR10/02 flight day 259a/2010, Iceland

Reported by: anch Owned by: knpa
Priority: alpha 5 Milestone: 2010 data processing completion
Component: Archiving Keywords:
Cc: Other processors:

Description (last modified by iopa)

Data location: /data/okhotsk1/scratch/arsf/archive-overflow/UR10_02-2010_259a_Iceland

Data arrived from ARSF via SATA disk DAPHNE 03 on 7/10/2010

Scientific objective: Not known

Priority: A5

PI: C. Cockell

Sensors:

  • Eagle (15/11/2010)
  • Hawk (10/02/2011)
  • Leica LIDAR (15/11/2010)
  • Digital Photography (15/11/2010)

Attachments (2)

2592010.sync (105 bytes) - added by iopa 14 years ago.
Eagle SCT offsets
2592010.2.sync (187 bytes) - added by iopa 14 years ago.
Eagle & Hawk SCT offsets

Download all attachments as: .zip

Change History (26)

comment:1 Changed 14 years ago by iopa

Applanix and IPAS have been completed, they cover this project and also 259b. The files will be copied in 259a.

Taking eagle for this.

comment:2 Changed 14 years ago by knpa

Appears to be an issue with the bandset labels in the header files; they start at 900nm which is lower than it should be. Possibly incorrect bandset selected or none specified. Will leave this until end of the year and new Hawk calibration.

comment:3 Changed 14 years ago by iopa

Taking LiDAR and camera for this. Will be doing LiDAR first and then attempting to discover the SCT offsets using the intensity image from the LiDAR.

comment:4 Changed 14 years ago by iopa

Camera ready to be checked.

comment:5 Changed 14 years ago by knpa

Taking camera delivery check.

comment:6 Changed 14 years ago by knpa

  • Owner set to iopa
  • Status changed from new to assigned

Delivery check complete

All fine apart from:

20101027/UR10_02-Photography
changed to
20101027/UR10_02

UR10_02-2010_259a_Iceland.csv
should be
RCD105-UR10_02-2010259a-ImageEvents.csv

.kml file shoud be listed in readme contents

Need to correct SORTE spelling tag mistakes for all tiffs and in Readme.

Images 216 217 look a bit weird - reprocess these and see if the line and high contrast remains.

comment:7 Changed 14 years ago by iopa

Eagle ready for checking.

Changed 14 years ago by iopa

Eagle SCT offsets

comment:8 Changed 14 years ago by iopa

Images 216 and 217 removed from photography. Camera delivery is ready.

comment:9 Changed 14 years ago by emca

Delivery check Eagle data from
~airborne/workspace/UR10_02-2010_259a_Iceland/delivery/20101105/UR10_02-Eagle

Misc directory is empty, geoid-spheroid separation file needs to be added. Otherwise all good.

comment:10 Changed 14 years ago by iopa

LiDAR is ready for checking.

comment:11 Changed 14 years ago by anch

Checked LiDAR.

Looks good,

Just update

dem/README_DEM_MAY_NOT_BE_ACCURATE.txt so it mentions ASTER not STRM

comment:12 Changed 14 years ago by iopa

Eagle, LiDAR and Photography dispatched on 15/11/2010 to Prof. Cockell.

comment:13 Changed 14 years ago by iopa

  • Description modified (diff)

comment:14 Changed 14 years ago by iopa

Processing Hawk data.

comment:15 Changed 14 years ago by iopa

Hawk data has been processed.

One observation; all lines seem to systematically have frame drops of 10 or 20 frames.

Delivery is ready for checking.

Changed 14 years ago by iopa

Eagle & Hawk SCT offsets

comment:16 Changed 14 years ago by knpa

Starting Hawk delivery check.

comment:17 Changed 14 years ago by knpa

Delivery check complete.

All looks good and ready to deliver apart from:

  • Regular droped scan lines in hawk - need to mention this in Readme
  • In Readme, correct DEM name to UR10_02-2010_259a_Iceland.dem
  • Level 1 bil's need permissions (o+r).
  • Large underflows on almost all lines (not sure if you are meant to mention this or not)

comment:18 Changed 14 years ago by iopa

  • Description modified (diff)

Hawk data has been dispatched to PI on 10/02/2011.

No more deliveries for this project.

comment:19 Changed 12 years ago by adbe

Hyperspectral reprocessing delivery check: No problems, ready to deliver

comment:20 Changed 12 years ago by knpa

  • Component changed from Processing: general to Archiving
  • Milestone set to 2010 data processing completion
  • Owner changed from iopa to knpa

comment:21 Changed 12 years ago by knpa

This project has been r-synced from the workspace

comment:22 Changed 6 years ago by wja

Archiving
Created new lidar delivery which has current structure.
Removed quotations from ImageID fields in camera delivery eventfile.

comment:23 Changed 6 years ago by wja

Archiving
Started RSYNC to CEDA.

comment:24 Changed 6 years ago by wja

Archiving
Finished RSYNC to CEDA (27/02/2019).

Note: See TracTickets for help on using tickets.