Opened 14 years ago
Closed 8 years ago
#386 closed flight processing (fixed)
EM10/07, flight day 145b/2010, Trapani
Reported by: | anch | Owned by: | anch |
---|---|---|---|
Priority: | alpha 4 low | Milestone: | 2010 data processing completion |
Component: | Processing: general | Keywords: | |
Cc: | Other processors: |
Description (last modified by knpa)
Specific Scientific Objectives
- Development and validation of hyperspectral retrieval algorithms for biophysical parameter estimation in preparation for launch of PRISMA hyperspectral mission. These include;
Leaf area indexn (LAI m2/m2)
Fraction of vegetation cover (Fc, %)
Leaf chlorophyll concentration and canopy chlorophyll content.
- Test and validation of remote sensing techniques for qualifying water exchanges in the main tree crop species of the Med.
PRIORITY:
a4l
Data location: /users/rsg/arsf/workspace/EM10_07-2010_145a_Trapani
Data arrived from ARSF via network transfer on 08/06/2010
PI: Dr F. Vuolo
Sensors:
- Eagle (16/02/2011)
- Hawk (16/02/2011)
- Leica LIDAR (04/01/12)
- RCD Photography (Not requested)
Attachments (1)
Change History (30)
comment:1 Changed 14 years ago by anch
- Summary changed from EM10/07, flight day 143b/2010, Trapani to EM10/07, flight day 145b/2010, Trapani
comment:2 Changed 14 years ago by anch
comment:3 Changed 14 years ago by anch
Applanix and IPAS processing completed.
Changed 14 years ago by anch
comment:4 Changed 14 years ago by anch
Hyperspectral complete and delivery created. Submitted for delivery check
comment:5 Changed 14 years ago by emca
Hyperspectral delivery check complete.
All data looks good - just need to change the flight letter from 'a' to 'b' on the screenshots, otherwise ready to deliver.
comment:6 Changed 14 years ago by anch
- Description modified (diff)
Delivered Eagle and Hawk.
Sent to Dr. Vuolo in Austria and Dr. Dash in Southampton
comment:7 Changed 13 years ago by knpa
Starting LiDAR processing.
comment:8 Changed 13 years ago by knpa
Just noticed that this project has RCD data which is not recorded on the status page.
Can not add it right now due to bug, this will need to be done, and the RCD processed, before this project is archived.
comment:9 Changed 13 years ago by knpa
Bug has been fixed (thanks mggr), RCD added to status page.
comment:10 Changed 13 years ago by knpa
145b is actually two sites, 9km apart.
Will keep together as this is how it was previously delivered (HS).
comment:11 Changed 13 years ago by knpa
All lines look good and line up well with each other.
comment:12 Changed 13 years ago by knpa
QC completed.
Preparing delivery.
comment:13 Changed 13 years ago by knpa
LiDAR ready for delivery check at: ~airborne/workspace/EM10_07-2010_145b_Trapani/delivery/20111230
comment:14 Changed 13 years ago by adbe
Delivery Check:
- Principal Investigator: Francesco Vuolo instead of Dr F. Vuolo in ReadMe
- DEM is 5 metre res(?), ReadMe says 2 metre
Otherwise ready to deliver
comment:15 Changed 13 years ago by knpa
LiDAR data delivered today to Francesco Vuolo at BOKU in Vienna (04/01/12)
comment:16 Changed 13 years ago by knpa
- Description modified (diff)
- Milestone set to 2010 data processing completion
comment:17 Changed 13 years ago by jaho
Processing RCD.
comment:18 Changed 13 years ago by jaho
- Moved camera pictures from 145a to 145b as they seem to belong here.
- It appears that GPS times in ImageEvents file are given in day seconds rather than week seconds. Need to convert before processing.
- Removed camera images 1 - 14, no corresponding flightlines.
comment:19 Changed 13 years ago by knpa
Starting reprocessing.
comment:20 Changed 13 years ago by knpa
Stage 1 complete.
Problem with stage 2 - apl claiming that it can't find a navigation file to match the eagle raw files.
comment:21 Changed 13 years ago by knpa
Found the problem - there is only one eagle nav file for this day and it is living in 145a.
Symlinked and running again with hawk as well as the bad pixel stuff is finished now.
comment:22 Changed 13 years ago by knpa
Lev3's look OK.
Running stage 3.
comment:23 Changed 13 years ago by knpa
Realised that no line information files had been created for this project.
This is due to an issue with the database, where there is only an entry for 145 and not 145b.
Have created manually using the same command with the --force option.
comment:24 Changed 13 years ago by knpa
Deleting project and re-running stage 2 as apl chain has been updated to generate additional masked files.
comment:25 Changed 13 years ago by knpa
Re-ran stage 2 for Hawk as aplcal has been updated in relation to the bad pixel file.
comment:26 Changed 12 years ago by emca
Delivery checking reprocessed apl data.
- DEM should be named EM10_07-2010_145b-ASTER.hdr
- Logsheet is joint for a + b
- Flightline names in logsheet don't match readme (cross lines)
Zipping mapped files. Waiting for check_apl_command to finish.
comment:27 Changed 12 years ago by emca
Checked apl commands, data looks fine. Delivery check complete.
comment:28 Changed 11 years ago by knpa
Merged and deleted workspace version.
comment:29 Changed 8 years ago by asm
- Resolution set to fixed
- Status changed from new to closed
Archiving
Archived and it is available from CEDA. Re-processed hyperspectral data at http://browse.ceda.ac.uk/browse/neodc/arsf/2010/EM10_07/EM10_07-2010_145b_Trapani/hyperspectral-reprocessed
Plymouth 12th May 2017
Starting navigation processing