Opened 14 years ago
Last modified 8 years ago
#386 closed flight processing
EM10/07, flight day 145b/2010, Trapani — at Version 16
Reported by: | anch | Owned by: | anch |
---|---|---|---|
Priority: | alpha 4 low | Milestone: | 2010 data processing completion |
Component: | Processing: general | Keywords: | |
Cc: | Other processors: |
Description (last modified by knpa)
Specific Scientific Objectives
- Development and validation of hyperspectral retrieval algorithms for biophysical parameter estimation in preparation for launch of PRISMA hyperspectral mission. These include;
Leaf area indexn (LAI m2/m2)
Fraction of vegetation cover (Fc, %)
Leaf chlorophyll concentration and canopy chlorophyll content.
- Test and validation of remote sensing techniques for qualifying water exchanges in the main tree crop species of the Med.
PRIORITY:
a4l
Data location: /users/rsg/arsf/workspace/EM10_07-2010_145a_Trapani
Data arrived from ARSF via network transfer on 08/06/2010
PI: Dr F. Vuolo
Sensors:
- Eagle (16/02/2011)
- Hawk (16/02/2011)
- Leica LIDAR (04/01/12)
- RCD Photography (Not requested)
Change History (17)
comment:1 Changed 14 years ago by anch
- Summary changed from EM10/07, flight day 143b/2010, Trapani to EM10/07, flight day 145b/2010, Trapani
comment:2 Changed 14 years ago by anch
comment:3 Changed 14 years ago by anch
Applanix and IPAS processing completed.
Changed 14 years ago by anch
comment:4 Changed 14 years ago by anch
Hyperspectral complete and delivery created. Submitted for delivery check
comment:5 Changed 14 years ago by emca
Hyperspectral delivery check complete.
All data looks good - just need to change the flight letter from 'a' to 'b' on the screenshots, otherwise ready to deliver.
comment:6 Changed 14 years ago by anch
- Description modified (diff)
Delivered Eagle and Hawk.
Sent to Dr. Vuolo in Austria and Dr. Dash in Southampton
comment:7 Changed 13 years ago by knpa
Starting LiDAR processing.
comment:8 Changed 13 years ago by knpa
Just noticed that this project has RCD data which is not recorded on the status page.
Can not add it right now due to bug, this will need to be done, and the RCD processed, before this project is archived.
comment:9 Changed 13 years ago by knpa
Bug has been fixed (thanks mggr), RCD added to status page.
comment:10 Changed 13 years ago by knpa
145b is actually two sites, 9km apart.
Will keep together as this is how it was previously delivered (HS).
comment:11 Changed 13 years ago by knpa
All lines look good and line up well with each other.
comment:12 Changed 13 years ago by knpa
QC completed.
Preparing delivery.
comment:13 Changed 13 years ago by knpa
LiDAR ready for delivery check at: ~airborne/workspace/EM10_07-2010_145b_Trapani/delivery/20111230
comment:14 Changed 13 years ago by adbe
Delivery Check:
- Principal Investigator: Francesco Vuolo instead of Dr F. Vuolo in ReadMe
- DEM is 5 metre res(?), ReadMe says 2 metre
Otherwise ready to deliver
comment:15 Changed 13 years ago by knpa
LiDAR data delivered today to Francesco Vuolo at BOKU in Vienna (04/01/12)
comment:16 Changed 13 years ago by knpa
- Description modified (diff)
- Milestone set to 2010 data processing completion
Starting navigation processing