#386 closed flight processing

EM10/07, flight day 145b/2010, Trapani — at Version 16

Reported by: anch Owned by: anch
Priority: alpha 4 low Milestone: 2010 data processing completion
Component: Processing: general Keywords:
Cc: Other processors:

Description (last modified by knpa)

Specific Scientific Objectives

  1. Development and validation of hyperspectral retrieval algorithms for biophysical parameter estimation in preparation for launch of PRISMA hyperspectral mission. These include;

Leaf area indexn (LAI m2/m2)
Fraction of vegetation cover (Fc, %)
Leaf chlorophyll concentration and canopy chlorophyll content.

  1. Test and validation of remote sensing techniques for qualifying water exchanges in the main tree crop species of the Med.

PRIORITY:
a4l

Data location: /users/rsg/arsf/workspace/EM10_07-2010_145a_Trapani

Data arrived from ARSF via network transfer on 08/06/2010

PI: Dr F. Vuolo

Sensors:

  • Eagle (16/02/2011)
  • Hawk (16/02/2011)
  • Leica LIDAR (04/01/12)
  • RCD Photography (Not requested)

Change History (17)

comment:1 Changed 13 years ago by anch

  • Summary changed from EM10/07, flight day 143b/2010, Trapani to EM10/07, flight day 145b/2010, Trapani

comment:2 Changed 13 years ago by anch

Starting navigation processing

comment:3 Changed 13 years ago by anch

Applanix and IPAS processing completed.

Changed 13 years ago by anch

comment:4 Changed 13 years ago by anch

Hyperspectral complete and delivery created. Submitted for delivery check

comment:5 Changed 13 years ago by emca

Hyperspectral delivery check complete.

All data looks good - just need to change the flight letter from 'a' to 'b' on the screenshots, otherwise ready to deliver.

comment:6 Changed 13 years ago by anch

  • Description modified (diff)

Delivered Eagle and Hawk.

Sent to Dr. Vuolo in Austria and Dr. Dash in Southampton

comment:7 Changed 12 years ago by knpa

Starting LiDAR processing.

comment:8 Changed 12 years ago by knpa

Just noticed that this project has RCD data which is not recorded on the status page.
Can not add it right now due to bug, this will need to be done, and the RCD processed, before this project is archived.

comment:9 Changed 12 years ago by knpa

Bug has been fixed (thanks mggr), RCD added to status page.

comment:10 Changed 12 years ago by knpa

145b is actually two sites, 9km apart.

Will keep together as this is how it was previously delivered (HS).

comment:11 Changed 12 years ago by knpa

All lines look good and line up well with each other.

comment:12 Changed 12 years ago by knpa

QC completed.

Preparing delivery.

comment:13 Changed 12 years ago by knpa

LiDAR ready for delivery check at: ~airborne/workspace/EM10_07-2010_145b_Trapani/delivery/20111230

comment:14 Changed 12 years ago by adbe

Delivery Check:

  • Principal Investigator: Francesco Vuolo instead of Dr F. Vuolo in ReadMe
  • DEM is 5 metre res(?), ReadMe says 2 metre

Otherwise ready to deliver

comment:15 Changed 12 years ago by knpa

LiDAR data delivered today to Francesco Vuolo at BOKU in Vienna (04/01/12)

comment:16 Changed 12 years ago by knpa

  • Description modified (diff)
  • Milestone set to 2010 data processing completion
Note: See TracTickets for help on using tickets.