Opened 13 years ago
Last modified 13 years ago
#428 assigned flight processing
GB11/05, flight day 292/2011, London
Reported by: | adbe | Owned by: | knpa |
---|---|---|---|
Priority: | whenever | Milestone: | 2011 data processing completion |
Component: | Archiving | Keywords: | |
Cc: | Other processors: |
Description (last modified by adbe)
Data location: /users/rsg/arsf/arsf_data/2011/flight_data/uk/GB11_05-2011_292_London
Data arrived from ARSF via network transfer on 18/11/2011
GB11/05 Scientific objective: Atmospheric flight over London.
GB11/05 Priority: not_required
PI: Benjamin Barratt
Notes: Atmospheric flight over London, no processing required. May be useful to some people though - specifically OS.
Sensors:
Camera (23/02/2012)
Eagle (23/02/2012)
Hawk (23/02/2012)
LiDAR (23/02/2012)
Change History (20)
comment:1 Changed 13 years ago by emca
comment:2 Changed 13 years ago by emca
comment:3 Changed 13 years ago by emca
Camera ready for delivery check
Having difficulty processing the hyperspectral data as the line is very long and the resulting tif file doesn't open in gtviewer (seg fault)
Processing smaller sections of the line with different sct values, hopefully the same sct offset will be found for the entire line.
comment:4 Changed 13 years ago by emca
Downloaded leica log files from Thelma, as they were missing.
Generated logsheet using these log files.
comment:5 Changed 13 years ago by knpa
Starting camera delivery check.
comment:6 Changed 13 years ago by knpa
Delivery check complete.
No problems found, camera ready to deliver.
comment:7 Changed 13 years ago by emca
Processed LiDAR and Hyperspectral data. Preparing deliveries.
Hyperspectral SCT offsets:
Eagle +0.03
Hawk +0.01
Compared LiDAR data to overlapping parts of the other London data, this line was found to be ~25-30cm higher than the other lines. This is thought to be due to the navigation data.
comment:8 Changed 13 years ago by emca
Eagle/Hawk ready for delivery check
comment:9 Changed 13 years ago by adbe
Delivery checking hyperspectral
comment:10 Changed 13 years ago by adbe
Hyperspectral Delivery Check:
- Mention in ReadMe that eagle first and last bands are blank (0, 64)
Otherwise, ready to deliver.
comment:11 Changed 13 years ago by adbe
Delivery checking LiDAR
comment:12 Changed 13 years ago by adbe
LiDAR delivery check:
- There are some gaps between the full waveform data
- Everything else is ok
comment:13 Changed 13 years ago by emca
reprocessed the fwf data so there are no gaps
comment:14 Changed 13 years ago by adbe
Checked full waveform files, no problems
Ready to deliver
comment:15 Changed 13 years ago by adbe
Hyperspectral sct's
line | eagle | hawk |
1 | 0.03 | 0.01 |
comment:16 Changed 13 years ago by adbe
- Description modified (diff)
Camera, Hyperspectral and LiDAR sent to Benjamin Barratt on disk 76 on 23/02/2012
comment:17 Changed 13 years ago by knpa
- Component changed from Processing: general to Archiving
- Milestone set to 2011 data processing completion
- Owner set to knpa
- Status changed from new to assigned
Beginning archiving.
comment:18 Changed 13 years ago by knpa
no lidar intensity vector screenshots
comment:19 Changed 13 years ago by knpa
As well as the ~280 rcd raw images belonging to this flight, there are another 864 raw images beginning with 1918*. I'm not sure what these are for. Appear to be same day as flight, so leaving them.
comment:20 Changed 13 years ago by knpa
Finished preparing for archiving. Made available to NEODC.
Processing navigation data. No base station data available on smart net for this day. Used Download Service Data within GrafNav, got two base stations but they gave poor result, in fact no solution was found.
Processing using PPP which gave a surprisingly good result and is within the error threshold levels.
Going to process the LiDAR data (there is only one line) using the PPP results but will also check other sources for base station data.