Opened 13 years ago

Last modified 13 years ago

#429 assigned flight processing

GB11/05, flight day 297/2011, London

Reported by: adbe Owned by: knpa
Priority: whenever Milestone: 2011 data processing completion
Component: Archiving Keywords:
Cc: Other processors:

Description (last modified by adbe)

Data location: /users/rsg/arsf/arsf_data/2011/flight_data/uk/GB11_05-2011_297_London

Data arrived from ARSF via network transfer on 18/11/2011

GB11/05 Scientific objective: Atmospheric flight over London.

GB11/05 Priority: not_required

PI: Benjamin Barratt

Notes: Atmospheric flight over London, no processing required. May be useful to some people though - specifically OS.

Sensors:

Camera (23/02/2012)
Eagle (23/02/2012)
Hawk (23/02/2012)

Change History (11)

comment:1 Changed 13 years ago by knpa

  • Description modified (diff)
  • Owner set to knpa
  • Status changed from new to assigned

Although there is some LiDAR data for this flight, these look like just tests as they do not overlap with the HS and are very short. No processing needed for these.

comment:2 Changed 13 years ago by knpa

Don't have any basestation data for this date and smartnet is not letting me download anything over 31 days old. Also having problems getting service data through IPAS. Have mailed Ops to see if they have any.

comment:3 Changed 13 years ago by knpa

Ops don't have any either. Have processed nav with PPP so may not be a good a result as usual.

comment:4 Changed 13 years ago by adbe

Found sct's, started processing rcd

comment:5 Changed 13 years ago by adbe

Created camera sol file,
Only 12 camera images
RCD ready for delivery check.

comment:6 Changed 13 years ago by adbe

Hyperspectral ready for delivery check.

comment:7 Changed 13 years ago by emca

Delivery checked the camera and hyperspectral deliveries.

Camera: KML file animation runs for over an hour although data was only collected in the last 3 or 4 mins. If possible can you remove the extra parts?

Hyperspectral: logsheet name does not match naming convention

Otherwise data is all good, ready to deliver.

comment:8 Changed 13 years ago by adbe

Renamed Hyperspectral logsheet.

Removed about 5 time records from kml file around 08:57, flight is around 10:30 onwards. This lead to the long animation run.

comment:9 Changed 13 years ago by adbe

Hyperspectral sct's

lineeaglehawk
10.00-0.05

comment:10 Changed 13 years ago by adbe

  • Description modified (diff)

Camera and Hyperspectral sent to Benjamin Barratt on disk 76 on 23/02/2012

comment:11 Changed 13 years ago by knpa

  • Component changed from Processing: general to Archiving
  • Milestone set to 2011 data processing completion

Starting archiving.

Note: See TracTickets for help on using tickets.