Opened 11 years ago
Last modified 11 years ago
#485 new flight processing
GB13/00, flight day 192/2013, Little Rissington — at Version 12
Reported by: | mark1 | Owned by: | benj |
---|---|---|---|
Priority: | immediate | Milestone: | |
Component: | Processing: general | Keywords: | |
Cc: | Other processors: |
Description (last modified by tipo)
Data location: /users/rsg/arsf/arsf_data/2013/flight_data/arsf_internal/GB13_00-2013_192_Boresight
Data arrived from ARSF via network transfer on 15/07/2013
GB13/00 Scientific objective: ARSF internal boresight/calibration flight
GB13/00 Priority: urgent
PI: ARSF Internal
Sensors:
Camera (Not requested by PI)
Eagle (Delivered 9/8/2013)
Hawk (Delivered 9/8/2013)
LiDAR (Delivered 9/8/2013)
Change History (12)
comment:1 Changed 11 years ago by mark1
comment:2 Changed 11 years ago by mark1
Looks like first 3 flight lines have been reflown, so do not use these 3 for the calibration. Navigation processing is done, separation is quite bad (longitude ~ 0.4m) until ~402000s but then gets better. First 3 lines are before this time so another reason not to use them.
comment:3 Changed 11 years ago by edfi
RangeCardCal Output
A1 | 0 | B1 | 0 |
A2 | 0.013 | B2 | -0.002 |
A3 | 0.039 | B3 | 0.006 |
A4 | 0.010 | B4 | 0.023 |
comment:4 Changed 11 years ago by edfi
Disregarding the first three flightlines as these were reflown
comment:5 Changed 11 years ago by edfi
Average Scanner Offset: -12479.91667
comment:6 Changed 11 years ago by edfi
RangeCardCal Output (after GCPs)
A1 | 2.91823 | B1 | 2.918 |
A2 | 2.932 | B2 | 2.916 |
A3 | 2.958 | B3 | 2.924 |
A4 | 2.929 | B4 | 2.942 |
comment:7 Changed 11 years ago by edfi
lascontrol.exe output
abs, rms, stddev
2.91823, 2.91836, 0.0276161
comment:8 Changed 11 years ago by tipo
Hyperspectral boresight values:
Eagle | 0.12 | -0.35 | 0.5 |
Hawk | 0.1 | -0.85 | 0.5 |
comment:9 Changed 11 years ago by edfi
LiDAR
Roll: -0.0009262
Pitch: -0.003236
Heading: 0.00027181
comment:10 Changed 11 years ago by edfi
No FW data available
comment:11 Changed 11 years ago by edfi
LiDAR Calibration Reg file copied into Calibration folder
comment:12 Changed 11 years ago by tipo
- Component changed from Processing: general to Archiving
- Description modified (diff)
- Owner set to benj
Base station ppp result using grafnav:
lat= 51 49 26.25264
lon= -1 17 18.72241
hei= 119.790