#674 new flight processing
Magic, flight day 229a/2021, Kiruna, Sweden
Reported by: | wja | Owned by: | asm |
---|---|---|---|
Priority: | immediate | Milestone: | |
Component: | Processing: general | Keywords: | |
Cc: | Other processors: |
Description (last modified by wja)
Data location: /users/rsg/arsf/arsf_data/2021/flight_data/sweden/Magic-2021_229a_Kiruna
Data arrived from Kings College London via hardrive from Sweden on August 23rd 2021.
Scientific objective: Joint NASA and ESA campaign flying JPL’s HyTES thermal instrument over sites in Europe with a focus on crops and soil.
PI: Martin Wooster
Sensors:
- Fenix1k (requested, flown)
- Phaseone (requested flown)
Change History (21)
comment:1 Changed 3 years ago by wja
comment:2 Changed 3 years ago by wja
Unpacking
Fenix headers have been updated with replace_wavscale.py. Unpacking checks completed.
comment:3 Changed 3 years ago by wja
Have removed DARKREF_229a-21_229a-21_Senario_1_2021-08-17_08-38-59.hdr_bak as it is identical to original_headers/DARKREF_229a-21_229a-21_Senario_1_2021-08-17_08-38-59.hdr.
Have removed 229a-21_229a-21_Senario_1_2021-08-17_08-38-59.hdr_log as it is identical to original_headers/229a-21_229a-21_Senario_1_2021-08-17_08-38-59.hdr
Fenix data renamed.
comment:4 Changed 3 years ago by wja
Dark frame data is recorded separately for this flight. Also means that Fenix data headers do not contain autodarkstartline
comment:5 Changed 3 years ago by wja
Flight was mistakenly listed as part of SwathSense in database, which has been updated.
comment:6 Changed 3 years ago by wja
- Description modified (diff)
- Summary changed from SwathS, flight day 229a/2021, Kiruna, Sweden to Magic, flight day 229a/2021, Kiruna, Sweden
comment:7 Changed 3 years ago by wja
- Owner set to asm
comment:8 Changed 3 years ago by dac
Digital Camera
Raw images converted to Tiff.
comment:9 Changed 3 years ago by wja
Hyperspectral Processing
Darkframe data is recorded in their seperate files for all lines apart from line 3. -darkline argument will be needed to be added to aplcor.
Only two darkframe data have header files: flines 1 & 2.
comment:10 Changed 3 years ago by wja
Hyperspectral Processing
All line processed with 3 bands
comment:11 Changed 3 years ago by wja
Hyperspectral Processing
Darkframes are missing from raw data. Seperate files containing darkframes are present for all lines apart from line 3 but are missing header files in lines 4 - 8.
Cannot process line 3.
comment:12 Changed 3 years ago by wja
Ready for Checking
comment:13 Changed 3 years ago by mark1
hyperspectral delivery check:
No project information XML file
dem missing from aplcorr example command line in readme
example gdal_translate command in readme (page 4) is wrong - area and bands are all 0
I will continue with check tomorrow...
comment:14 Changed 3 years ago by mark1
hyperspectral delivery check (part 2):
As there is no line 3 but logsheet suggests that there is, you should add a "note" into the logsheet stating that line 3 failed during acquisition.
Everything else seems OK, so just fix the above items (in the post above) and then should be ready to zip the mapped images.
comment:15 Changed 2 years ago by wja
Delivery
- Added project XML
- Updated ReadMe
comment:16 Changed 2 years ago by wja
Delivery
Updated logsheet, should now be ready to deliver.
comment:17 Changed 2 years ago by wja
Delivery
Finalised, put on FTP slot 5
comment:18 Changed 2 years ago by wja
Delivery Sent
PI notifified
comment:19 Changed 15 months ago by wja
Archiving
Created JSONs, committed them to database.
Ready to sync to CEDA when they're ready.
comment:20 Changed 15 months ago by wja
Mapped Fenix1K lines were wrongly named '3a' not '3b'. Have unzipped, changed this and zipped again.
comment:21 Changed 15 months ago by wja
Archiving
This is only for processed Fenix1k data at the moment.
Started transfer to CEDA (25/08/23 11:40).
Unpacking
Still need to rename Fenix1k data, there are lots of irregularity with filenames.
Navigation processing
SBET file produced using single basestation (KIRU). Position RMS looked good in POSPac report.
This basestation is ~30km away from take off and solution may be improve by rerunning with the NCEO basestation once we are sent the data.