Opened 2 years ago
Last modified 17 months ago
#700 new flight processing
LiDAR and Ibis Test, flight day 230/2022, Alconbury
Reported by: | wja | Owned by: | |
---|---|---|---|
Priority: | immediate | Milestone: | |
Component: | Processing: general | Keywords: | |
Cc: | Other processors: |
Description
Received via hard drive 13/09/2022.
LWIR and MWIR frame sensors also flown.
Flight over Alconbury for boresight, then 6 lines recorded over Little Shelford, Cambridge (no LiDAR for this area).
Change History (11)
comment:1 Changed 2 years ago by wja
comment:2 Changed 2 years ago by mark1
Have renamed 1 IBIS flightline to standard format, IBIS230-22-1, for testing processing chain.
Also changed fps in hdr from 64.95 to 10.01.
comment:3 Changed 2 years ago by mark1
Renamed all IBIS using:
rename.sh test_after_repair_Boresight_Alconbury_2022-08-18_14-00-55 IBIS230-22-10
rename.sh test_after_repair_Boresight_Alconbury_2022-08-18_14-07-14 IBIS230-22-11
rename.sh test_after_repair_Boresight_Alconbury_2022-08-18_14-11-48 IBIS230-22-12
rename.sh test_after_repair_Boresight_Alconbury_2022-08-18_14-15-58 IBIS230-22-13
rename.sh test_after_repair_Boresight_Alconbury_2022-08-18_14-20-42 IBIS230-22-14
rename.sh test_after_repair_Boresight_Alconbury_2022-08-18_14-34-45 IBIS230-22-15
rename.sh test_after_repair_Boresight_Alconbury_2022-08-18_14-40-25 IBIS230-22-16
rename.sh test_after_repair_Boresight_Alconbury_2022-08-18_14-45-32 IBIS230-22-17
rename.sh test_after_repair_Boresight_Alconbury_2022-08-18_14-50-21 IBIS230-22-18
rename.sh test_after_repair_Boresight_Alconbury_2022-08-18_14-55-16 IBIS230-22-19
rename.sh test_after_repair_Boresight_Alconbury_2022-08-18_13-10-30 IBIS230-22-1
rename.sh test_after_repair_Boresight_Alconbury_2022-08-18_15-00-19 IBIS230-22-20
rename.sh test_after_repair_Boresight_Alconbury_2022-08-18_13-18-06 IBIS230-22-2
rename.sh test_after_repair_Boresight_Alconbury_2022-08-18_13-22-57 IBIS230-22-3
rename.sh test_after_repair_Boresight_Alconbury_2022-08-18_13-29-11 IBIS230-22-4
rename.sh test_after_repair_Boresight_Alconbury_2022-08-18_13-33-53 IBIS230-22-5
rename.sh test_after_repair_Boresight_Alconbury_2022-08-18_13-38-21 IBIS230-22-6
rename.sh test_after_repair_Boresight_Alconbury_2022-08-18_13-43-15 IBIS230-22-7
rename.sh test_after_repair_Boresight_Alconbury_2022-08-18_13-50-08 IBIS230-22-8
rename.sh test_after_repair_Boresight_Alconbury_2022-08-18_13-55-15 IBIS230-22-9
comment:4 Changed 19 months ago by wja
Updated project code for these LiDAR & IBIS test flights to GB22/02
comment:5 Changed 19 months ago by wja
IBIS Boresight
Processed with 3 bands. Starting boresight procedure.
Lines 1 - 14 are a boresight configuration over Alconbury. lines 15 - 20 are over Little Shelford.
comment:6 Changed 19 months ago by wja
IBIS Boresight
Don't have a suitable pair of heading lines, but have compared -1, 0 and +1 and 0 looks good.
Pitch | Roll | Yaw |
0.9 | 0.5 | 0 |
comment:7 Changed 19 months ago by wja
IBIS Processing
There appears to be a slight FPS error in lines 16 & 19.
Investigating.
comment:8 Changed 19 months ago by wja
IBIS Processing
FPS is slightly too high for lines 16 & 19. Have changed in the raw header files from 10 to 9 (SCT difference between start and end of flightline was +10% seconds) and it looks better.
comment:9 Changed 19 months ago by wja
IBIS Processing
Processing all bands
comment:10 Changed 19 months ago by wja
IBIS Processing
Have processed all bands and have applied a mask to the swath edge that is obstructed by the aircraft on one side.
Starting to make delivery and metadata.
comment:11 Changed 17 months ago by wja
Infratec (ImageIR)
Have been testing frame geocorrection of the Infratec (thermal frame camera) of this flight.
Unpacking
Code for running QC needs updating for new sensors.