Changes between Version 7 and Version 8 of Processing/CalibSite


Ignore:
Timestamp:
Feb 22, 2012, 5:38:41 PM (13 years ago)
Author:
mark1
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Processing/CalibSite

    v7 v8  
    11= Calibration Sites =
     2
     3[[Image(survey.jpg, align=right, 500px)]]
    24
    35= Little Rissington =
     
    57Active: 2008 onwards
    68
    7 [[Image(survey.jpg)]]
     9
     10
     11The survey site is at Little Rissington – an old MoD airfield and business park. For the survey, a GPS
     12base station was set up in the grounds of the business park, specifically it was located south west of the
     13first hangar when you enter the business park. The hangar is in use as the premises of a removal firm.
     14This base station site is marked as B on Figure 1. It was collecting data for approximately 9 hours.
     15Whilst the base station was in position collecting data, 64 additional points were surveyed; 63 of which
     16were on the airfield and 1 on the business park. Each point was surveyed using GPS for 5 minutes.
     17The points were surveyed for use as LIDAR, hyperspectral and camera control points, although not all
     18points are suitable for every sensor. Photographs were taken of all the survey points by both Sterling
     19Surveys and ARSF
     20
    821
    922See the attached documents for details.