#5 closed flight processing (fixed)
144-WM06-11 Rio Tinto
Reported by: | amro | Owned by: | mggr |
---|---|---|---|
Priority: | alpha 4 medium | Milestone: | 2006 data processing completion |
Component: | Processing: general | Keywords: | 144, WM06-11, Rio Tinto |
Cc: | Other processors: |
Description (last modified by mggr)
CASI line 6 has not been processed due to Segmentation fault. the massage appeared on the output file can be seen below
azexhdf -- ver: 3.1.8 May 10 2007 (C) Azimuth Systems UK 1996, 2007 Input file: ./lev1/c144061b.hdf processing level: 1B Scanner type: CASI image data item: CAimage read hdf bands: 48 pixels: 511 lines: 4923 Image (CAimage) : (pix) 511, (lines) 4923, (bands) 48 type 23 Output BIL file details... pixels per line: 511 start line: 0 lines: 4923 bits per pixel: 16 bytes per line: 1022 band(s): 1 to 48 line: 0 line: 1000 line: 2000 line: 3000 line: 4000 last line output: 4922 output file complete ./runc/c14406.sh: line 183: 4425 Segmentation fault azgcorr ${V} -hs ${HGTOFF} ${PROJ} ${BANDL} -p ${PIXSIZE} ${PIXSIZE} -1 ${P_HDF1} -3 ${P_HDF3} ${DoDEM}
Attachments (1)
Change History (7)
comment:1 Changed 17 years ago by mggr
- Description modified (diff)
- Owner changed from amro to mggr
- Status changed from new to assigned
comment:2 Changed 17 years ago by mggr
- Summary changed from 144-WM06-05-IAS and LAI to 144-WM06-11 Rio Tinto
I can only find 144 WM06-11 in ~amro/scratch_space/ but this ticket says 144 WM06-05. Perhaps a typo? I'm assuming you meant -11.
Reproduced seg fault for CASI line 6.
- seg faulting command was azgcorr -v -hs 0 -mUTMZ 29T -dSPn -bl 2 3 5 -1 -p 2 2 -1 ./lev1/c144061b.hdf -3 ./lev3/c144063a.hdf
- I'd like to check this further to make sure it's not a projection parameters problem before emailing Bill
Also noticed that line 1 isn't produced at all (floating point exception in azcaschk2).
- reason for this is that the relevant casi file is empty! (1.5kB)
- Flight logsheet confirms we should ignore it
- deleted from batchgen script
comment:3 Changed 17 years ago by mggr
- Keywords 144 WM06-11 Rio Tinto added
- Milestone set to 2006 data processing completion
Changed 17 years ago by amro
comment:4 Changed 17 years ago by amro
- Priority changed from blocker to minor
CASI line 6 has been reprocessed several times with different parameters. The funny colour on the image seems to disappear when the SycOFF was set -1 and the nav problem disappeared when the GPSOFF was set to -1. It is worth noticing that, all 1 to five did not need to modify any parameter as the defult ones were used and they are perfect.
This project is now completed and ready to be delivered
-:)
comment:5 Changed 17 years ago by amro
- Resolution set to fixed
- Status changed from assigned to closed
comment:6 Changed 15 years ago by mggr
- Component changed from ARSF to Processing: general
Attempting to reproduce.