Timeline


and

Feb 1, 2009:

12:00 AM Milestone 2008 data processing completion completed
All tasks related to data processing in 2008

Jan 28, 2009:

6:09 PM Ticket #221 (Field in header files labelled 'fwhm' is actually bandwidth) created by benj
The field in Specim raw data header files labelled "fwhm" (Full Width …

Jan 27, 2009:

2:34 PM Processing edited by mggr
(diff)

Jan 23, 2009:

12:39 PM Processing/KnownProblems edited by benj
Added more detail to the Eagle/Hawk sync section (diff)

Jan 20, 2009:

5:23 PM Ticket #220 (2009 flights affected by varying offset) created by benj
VOCALS 2008 flights 7-14 all have a small offset between Eagle and …
3:57 PM Ticket #86 (Azatm always reports scan rate as 50.0 when processing) closed by benj
fixed: Fixed in azatm.336. Closing.
3:28 PM Ticket #37 (azspec filepaths too short) closed by benj
fixed: Bill has updated the various az programs as part of work order 10, …

Jan 16, 2009:

2:36 PM Procedures/NewDataArrival edited by mark1
(diff)

Jan 15, 2009:

2:21 PM Ticket #219 (Support: 17/Dec/08, Hassan Khavarian, Problems with azgcorr, queries ...) created by benj
Initial contact via NEODC on 17/12/08, subsequently direct. User had …

Jan 14, 2009:

5:27 PM lidar_quality_report_final.doc attached to Reports by mark1
Initial quality report for the Leica LIDAR instrument
10:19 AM Procedures/NEODCDelivery edited by mggr
(diff)

Jan 13, 2009:

12:26 PM Processing/BoresightCalibration edited by benj
Added explanatory note at the top for PRH order (diff)
9:34 AM Procedures/NewDataArrival edited by mark1
(diff)

Jan 12, 2009:

6:38 PM Ticket #47 (GB2004/19, flight day 102b/2007, Nigg Bay) closed by mggr
fixed: Data sent to NEODC for archiving.
6:38 PM Ticket #80 (GB2005/03, flight day 254a/2007, Harwood) closed by mggr
fixed: Data sent to NEODC for archiving.
6:38 PM Ticket #49 (GB2007/05, flight day 103a/2007, Loch Leven) closed by mggr
fixed: Data sent to NEODC for archiving.
6:38 PM Ticket #50 (GB2007/05, flight day 103b/2007, Loch Leven) closed by mggr
fixed: Data sent to NEODC for archiving.
6:38 PM Ticket #51 (GB2007/05, flight day 103c/2007, Loch Leven) closed by mggr
fixed: Data sent to NEODC for archiving.
6:37 PM Ticket #84 (GB2007/06, flight day 192a/2007, Dorchester) closed by mggr
fixed: Data sent to NEODC for archiving.
5:42 PM Ticket #83 (GB2007/06, flight day 192b/2007, New Forest) closed by mggr
fixed
5:42 PM Ticket #52 (GB2007/07, flight day 191a/2007, Inverclyde) closed by mggr
fixed: Data sent to NEODC for archiving.
5:42 PM Ticket #64 (GB2007/07, flight day 241b/2007, Inverclyde) closed by mggr
fixed: Data sent to NEODC for archiving.
5:35 PM Ticket #53 (CEH2007/01 (GB2007/12), flight day 240/2007, Buckingham) closed by mggr
fixed: Data has been sent to NEODC for archiving.
4:05 PM Ticket #218 (Dark frames missing from some data files) created by benj
Some flights appear to be missing dark frames (should have been …

Jan 10, 2009:

8:20 AM Status edited by gaew
(diff)

Jan 8, 2009:

6:15 PM Ticket #217 (VOC_15, flight day 319/2008, Chile) created by benj
Data location: /data/larsenb1/scratch/arsf/vocals/vocals-Q/voc14-31808 …
4:14 PM Ticket #216 (VOC_14, flight day 318/2008, Chile) created by benj
Data location: /data/larsenb1/scratch/arsf/vocals/vocals-Q/voc14-31808 …
4:06 PM Ticket #215 (VOC_13, flight day 318/2008, Chile) created by benj
Data location: /data/larsenb1/scratch/arsf/vocals/vocals-Q/voc13-31808 …
3:30 PM Ticket #214 (VOC_11, flight day 315/2008, Chile) created by benj
Data location: /data/larsenb1/scratch/arsf/vocals/vocals-Q/voc11-31508 …
3:22 PM Ticket #213 (VOC_10, flight day 314/2008, Chile) created by benj
Data location: /data/larsenb1/scratch/arsf/vocals/vocals-Q/voc10-31408 …
3:07 PM Ticket #212 (VOC_09, flight day 311/2008, Chile) created by benj
Data location: /data/larsenb1/scratch/arsf/vocals/vocals-H/voc09-31108 …
2:54 PM Ticket #211 (VOC_08, flight day 310/2008, Chile) created by benj
Data location: …

Jan 7, 2009:

12:08 PM little_riss_survey_Sep08_lidarpoints.txt attached to Processing/CalibSite by mark1
GCPs for LIDAR processing in BNG Newlyn
12:07 PM little_riss_survey_Sep08_UTM30_ETRS89.txt attached to Processing/CalibSite by mark1
GCPs for LIDAR processing in UTM30 ETRS89
12:03 PM littleriss_survey.odt attached to Processing/CalibSite by mark1
Ground survey report including point locations
10:20 AM Status edited by gaew
(diff)
10:13 AM Status/Collection edited by gaew
(diff)

Jan 6, 2009:

7:04 PM Processing/LIDARDEMs edited by mggr
(diff)
6:56 PM Processing/LIDARDEMs edited by mggr
(diff)
6:48 PM Status/Collection edited by gaew
(diff)
6:48 PM Status/Collection edited by gaew
(diff)
4:02 PM Ticket #210 (VOC_07, flight day 309/2008, Chile) created by benj
Data location: /data/larsenb1/scratch/arsf/vocals/vocals-U/voc06-30908 …
3:41 PM Ticket #209 (VOC_06, flight day 308/2008, Chile) created by benj
Data location: /data/larsenb1/scratch/arsf/vocals/vocals-X/voc06-30808 …

Jan 5, 2009:

10:49 AM Ticket #173 (Acquire extra info about Specim instruments) closed by mggr
fixed: Received ~25/July. Stored in ~arsf/docs.
10:48 AM Ticket #77 (Boresight and lever arm) closed by mggr
fixed
10:48 AM Ticket #167 (Hardcoded default bands in bil.hdr) closed by mggr
fixed: Fixed by Bill.
10:47 AM Ticket #1 (Automatic CASI RGB TIF production) closed by mggr
fixed: Done for Eagle - don't need it for CASI any more.
10:43 AM Ticket #112 (Add BigTIFF support to azexhdf) closed by mggr
wontfix: On the other hand, we think that TIFF is a bit sucky as a format. …
Note: See TracTimeline for information about the timeline view.